2404-40124 SRA - Response with conditions (MCU24_0044 and OPW24_0045) · MCU24/0044
2404-40124 SRA
Attachment 3—Reasons for referral agency response
(Given under section 56(7) of the Planning Act 2016)
The reasons for the SARA’s decision are:
The proposed development is for operational work for prescribed tidal works for a pontoon.
The proposed development involves operational work in a developed tidal waterway, and as such
required assessment under the State Development Assessment Provisions (SDAP).
SARA assessed the application against State code 7: Maritime safety, of the SDAP (v3.0) and found it
complies, subject to conditions to ensure:
o the development is carried out generally in accordance with the plans of development
submitted with the application
o that at all times, all lights on or above the development site do not interfere with safe
navigation in surrounding waterways
o the development does not encroach on the navigation corridor or high-risk maritime zone to
ensure the safe passage of vessels
o that debris from the development does not create a hazard to navigation
o that there is no residual material that could create a hazard to navigation.
SARA assessed the application against State code 8: Coastal development and tidal works, of the
SDAP (v3.0) and found it complies, subject to conditions to ensure:
o the development is carried out generally in accordance with the plan of development
submitted with the application.
o that at all times, the works, to which this approval relates are for private purpose only.
o any operator and contractor involved in the works ensures impacts on coastal values
(water quality) are avoided or minimised.
o works only use materials which are free from contaminants as defined under section 11 of
the Environmental Protection Act 1994.
o damaged works as a result of erosion, flooding or storm tide inundation, the registered
landowner(s) of the subject land shall be responsible for the removal of all debris at their
own expense.
Material used in the assessment of the application:
the development application material and submitted plans
Planning Act 2016
Planning Regulation 2017
the SDAP (version 3.0), as published by SARA
the Development Assessment Rules
SARA DA Mapping system
section 58 of the Human Rights Act 2019
Attachment 4—Representations about a referral agency response
provisions
(page left intentionally blank)
State Assessment and Referral Agency Page 6 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2404-40124 SRA - Response with conditions (MCU24_0044 and OPW24_0045).pdfRelated documentApplication case desk ↗
About this file
- File size
- 263 KB (small file)
- File type
No other editions are linked here.