Development Counter

NC | 14 SEP 2010

 

 

THIS IS THE NEXT PART OF A

MULTIPLE PART RECORD
Part — Of _—=

Application number: OPW 10/R0T¥ .~

1ON MANAGEMENT RECORDS MANAGEMENT Control of Records\EDRMS\Multi Part-Record Cover Sheet NEXT PART.xls

   
   
      
Full text of the other 14 pages

Page 2

| | d | Mee CR ue Su eS Cunt

 

Application Details - IDAS form 1

(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.

For all development applications, you must:
* complete this form (Application details - IDAS form 1)
° complete any other forms relevant to your application

¢ provide any mandatory supporting information identified on the forms as being required to accompany your
application.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.

 

Applicant details (note: the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)

 

 

 

Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.

 

Name/s (individual or company name in full) |PILE-IT PTY LTD T/A NOOSA JETTY BUILDERS

 

 

 

 

 

 

 

For companies, contact name [DANNY REED
Postal address Po BOX 299 NOOSAVILLE QLD 4566
Contact phone number 0408 137 526

 

 

Mobile number (non-mandatory)

 

 

Fax number (non-mandatory) 07 5474 3480

 

 

 

 

e-mail address (non-mandatory) [email protected]

 

 

 

1. What is the nature of development proposed? (tick all applicable boxes)

 

 

(]_ material change of use of premises

 

(11 building work
EX] operational work Development Counter
() reconfiguring a lot
14 SEP 2010
Tewantin

 

 

 

PURO e LM rll! / LS caret

Government

 

Page 3

 

LU

2. What type of approval is being sought?

 

 

 

 

{X] development permit
() preliminary approval
(_] both - provide details below

 

 

3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?

 

 

KK] No
[] Yes - complete table A and then go to question 5

 

4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)

 

 

Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises

 

 

 

Lot on plan
Street Address description
Local government area
Unit | Street Street name and official Post |i ot No,| Plan type (e.g. Logan,Cairns)
No. | No. suburb/locality name code ‘| and plan no.
1 26 _|Mast Head, Noosaville 4566 |621 |RPessa63 | Sunshine coast regional

 

 

 

 

 

 

 

 

 

(_] Street address / lot on plan

i= Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)

‘Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)

 

 

Coordinates (note: place each set of
coordinates in a separate row) Zone Datum Local government
reference area (If applicable)

 

Easting | Northing | Latitude | Longitude

 

(J Gpag4
[] wess4
LJ other

 

 

 

 

 

 

 

 

 

 

5. Total area of the premises on which the development is proposed (indicate hectares or m?)
848m2

6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)

 

 

 

 

 

1 |house

 

 

 

 

7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)

 

timber jetty

 

A ation Details - IDAS form 1
Version 1.0 18 December 2009

 

Page 4

 

 

 

8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)

 

 

[] No

Yes - complete either table D, table E or table F as applicable

 

Table D (note: do not complete this table if lodging the application on-line using Smart eDA)

 

 

Name of owner/s ofthe land | KICHACD BUsCeE & HevEe ASSUNT WALL

 

\We, the above-mentioned owner/s of the land, consent to the making of this application.

 

 

 

 

 

Signature of owner/s of the land eae (wae & « Lily wall
Date 6-A— 2sioO
Table E

 

 

Name of owner/s of the land

 

 

(_] The owner's written consent is attached or will be provided separately to the assessment manager

 

Table F

 

 

Name of owner/s of the land

 

 

oO By making this application, |, the applicant, declare that the owner has given written consent to the making of
the application.

 

 

9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)

 

 

 

x] No (_] Yes - complete table G

 

 

10. Identify if any of the following apply to the premises (tick applicable box/es)

 

 

—X] adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
[] _ onstrategic port land under the Transport Infrastructure Act 1994 - complete table |
(]__ ina tidal water area - complete table J

 

Table H Name of water body, watercourse or aquifer

 

1 |Noosa Waters Canal

 

 

 

 

41. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water, etc.)

 

 

[XINo [Yes - ensure the type, location and dimension of each easement is included in the plans submitted

Page 5

 

 

LILO

12. Does the proposal include new building work or operational work on the premises? (including any
services)

 

 

[No [XYes - ensure the nature, location and dimensions of proposed works are included in plans submitted

 

13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
end of this form for more information)

 

 

—X) No - Go to question 15 ( Yes

 

15. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 2009?

 

 

KX] No
(] Yes - provide details below

 

16. List below all of the forms and supporting information that accompany this application (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)

 

 

 

 

Description of attachment or title of attachment Method of lodgement to
assessment manager
1 |Form6 over the counter
2  |Checklist over the counter
3 | John Norden Plans over the counter

 

 

 

 

 

17. Applicant's declaration

 

 

x By making this application, | declare that all information in this application is true and correct (note: it is
unlawful to provide false or misleading information).

 

 

 

Applica ils - IDAS form 1
Version 1.0 18 December 2009

 

 

 

Page 6

 

LILI

Notes for completing this form

Question 8:

¢ Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.

« Owner's consent is not required for a mobile and temporary ERA.

Question 9:

e Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.

Question 13:

¢ The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
long service leave levy is payable.

¢ The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

Question 14:

« The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.

¢ Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at
www.qleave.qid.gov. au. For further information contact QLeave on 1800 803 481 or www.qleave.qid.gov.au.

Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.

OFFICE USE ONLY

 

 

Date received Reference numbers

 

 

 

 

 

 

NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER

 

 

 

 

 

 

 

 

 

 

To: Council. | have been engaged as the private certifier for the
. building work referred to in this application.
Date of Name BSA Certification Building
engagement license number classification/s
7 7 =< i "_ Application Details - IDAS form 1

Version 1.0 18 December 2009

 

Page 7

LIL

QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)

 

Date receipted

ee QLeave Project {Amount ., {form sighted by|Name of officer who
Description of the work Number paid ($) pate pat assessment {sighted the form
manager

 

 

 

 

 

 

 

 

 

 

The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral
agencies.

Application Details - IDAS form 1
Version 1.0 18 December 2009

Page 8

al Integrated Development Assessment System form

 

Building or operational work assessable
against a planning scheme - IDAS form 6

(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

This form must be completed for development applications for building works or operational work assessable against
a planning scheme.

You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your aj

   

For all development applications, you must:
© complete Applicant details - IDAS form 1

° complete any other forms relevant to your applicatipn

* provide any mandatory supporting information identified on the forms as being required to ‘heco pany your
application.

 

All terms used on this form have the meaning given in the SUSsfainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.

This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.

 

1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)

 

(J building work - complete table A {KJ operational work - complete table B

 

Table B

What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)

(J) road works () stormwater {X] water infrastructure
(J drainage Works (J earthworks (_] sewerage infrastructure
(J landscaping (J signage (_] clearing vegetation under the planning scheme

[_] other - please specify below

What type of approval is being sought? (if you have indicated multiple works in the above question, please
use an attachment to this form to detail each approval request)

[X] development permit (J preliminary approval (1 both - specify below

Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)

—X] No LJ Yes - specify the number of lots being created

Are there any current approvals associated with this application? (e.g. material change of use)

XX] No (J Yes - provide details below

 

 

 

Government

 

yee MU ee UM LaLa | if 6. cree

Page 9

 

LILI)

 

 

2. What is the dollar value of the proposed building work? (inc GST, materials and labour)| $25,000

 

 

 

a 2me - IDAS form 6
Version 1.0 18 December 2009

    

Page 10

LIE

 

3. Confirm the following mandatory supporting information accompanies this application

 

Confirmation
of lodgement

Method of lodgement

 

All applications for operational works

 

site plans drawn to scale which show the following:

the location and site area of the land to which the application relates
(relevant land)

the north point

the boundaries of the relevant land

the allotment layout showing existing lots, any proposed lots (including
the dimensions of those lots), existing or proposed road reserves,
building envelopes and existing or proposed open space (note:
numbering is required for all lots)

any existing or proposed easements on the relevant land and their
function

any access limitation strips

all existing and proposed roads and access points on the relevant land

[X] confirmed

over the counter

 

a statement about how the proposed development addresses the local
government's planning schemes and any other planning documents
relevant to the application

LC) confirmed

 

Applications for operational works involving earthworks (filling and excavating)

 

drawings showing:

existing and proposed contours

areas to be cut and filled

the location and level of any permanent survey marks or reference
stations used as datum for the works

the location of any proposed retaining walls on the relevant land and
their height

the defined flood level (if applicable)

the defined fill level (if applicable)

(| confirmed

 

Applications for operational works involving roadworks

 

drawings showing:

 

existing and proposed contours

the centreline or construction line showing chainages, bearings, offsets
if the construction line is not the centreline of the road and all
intersection points

information for each curve including tangent point chainages and
offsets, curve radii, arc length, tangent length, superelevation (if
applicable) and curve widening (if applicable)

kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)

edge of pavement where kerb is not constructed

position and extent of channelisation

location and details of all traffic signs, guideposts, guardrail and other
street furniture

pavement markings including details on raised pavement markers
catchpit, manhole and pipeline locations

drainage details (if applicable)

cross road drainage culverts (if applicable)

concrete footpaths and cycle paths

location and details for access points, ramps and invert crossings
changes in surfacing material

[| confirmed

 

 

 

scheme - IDAS form 6

Version 1.0 18 December 2009

 

Page 11

|

 

Confirmation
of lodgement

Method of lodgement

 

Applications for operational works involving stormwater drainage

 

drawings showing:

existing and proposed contours

drainage locations, diameters and class of pipe, open drains and
easements

manhole location, chainage and offset or co-ordinates and inlet and
outlet invert levels

inlet pit locations, chainage and offset or co-ordinates and invert and
kerb levels

[| confirmed

 

Applications for operational works involving water reticulation

 

drawings showing:

kerb lines or edge of pavement where kerb is not constructed
location and levels of other utility services where affected by water
reticulation works

pipe diameter, type of pipe and pipe alignment

water main alignments

water supply pump station details (if applicable)

minor reservoir details (if applicable)

conduits

location of valves and fire hydrants

location of house connections (if applicable)

location of bench marks and reference pegs

L] confirmed

 

Applications for operational works involving sewerage reticulation

 

drawings showing:

location of all existing and proposed services

location of all existing and proposed sewer lines and manhole locations
location of all house connection branches

kerb lines or edge of pavement where kerb is not constructed
chainages

design sewer invert levels

design top of manhole levels

type of manhole and manhole cover

pipe diameter, type of pipe and pipe alignment

location of house connections (if applicable)

sewer pump station details (if applicable)

[confirmed

 

Applications for operational works involving street lighting

 

drawings showing:

 

location of all light poles and service conduits

location of all other cross road conduits

type of wattage and lighting

any traffic calming devices

additional plans for roundabouts and major roads (if applicable)
details of any variations to normal alignment

details of lighting levels

 

L|confirmed

 

 

 

Ve

snning scheme = IDAS form 6
‘ersion 1.0 18 December 2009

 

Page 12

=

IT

LI] .

 

Confirmation

of lodgement me

thod of lodgement

 

Applications for operational works involving public utility services

 

drawings showing: . .

any existing light poles and power poles
any existing underground services
details of préposed services

alternation to existing services

(_|confirmed

 

Applications for operational works involving landscaping works

 

drawings showing:

 

the location of proposed plant species

a plant schedule indicating common and botanical names, pot sizes
and numbers of plants

planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and
garden edge

the location and type of any existing trees to be retained
construction details of planter boxes, retaining walls and fences

the proposed maintenance period

irrigation system details

 

{_]confirmed

 

 

 

Notes for completing this form:
¢ This form can also be used for development applications for building works or operational works assessable
against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is

mentioned, take it to mean the land use plan for the airport land.

Privacy -please refer to your assessment manager for further details on the use of information recorded in
this form.

 

OFFICE USE ONLY

Date Received Reference Numbers

 

 

 

 

 

 

 

 

The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.

Versio:

 

ng scheme - IDAS form 6

n 1.0 18 December 2009

Page 13

Bat | Integrated Development Assessment System Checklist

 

 

Development assessment che
checklist 1 Develcpment Counter

(Sustainable Planning Act 2009, version 1.0 18 December 2009) i. 1 L SEP 2010
This checklist applies to the carrying out of development generally. {| . j 5
You are not required to complete this checklist as part of your de lopment appliqateidy RINEVET you may submit the
checklist with your application if you wish. The purpose of the chécklist is to assist you in identifying:

 

* whether you need to make a development application for the proposed development
* if a development application is required, the relevant IDAS forms you need to complete as part of your application
+ whether you need to give a copy of your application to any referral agencies.

If your development involves a material change of use, reconfiguring a lot or operational works, it is recommended
that you complete Material change of use - IDAS checklist 2, Reconfiguring a lot - IDAS checklist 3 or Operational
works - IDAS checklist 4, as applicable.

If you are unsure how to answer any questions on this checklist, phone or visit your local government, or go to the
Department of Infrastructure and Planning's website at www.dip.qld.gov.au.

All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.

 

Part 1 - General questions

 

 

1.1 Have you received a referral agency response in relation to this proposed development prior to making
an application?

 

 

{KINo

ores |" To assist you in preparing your application, completing Referral agency responses - IDAS checklist
6 is recommended

 

 

 

1.2 Do you wish the proposed development to be assessed against a superseded planning scheme?

 

 

— No

 

You must complete Request to apply a superseded planning scheme - Sustainable Planning Act
OYes form 2 and give this notice to the relevant local government. If the local government agrees to
your request, details must be provided in Application details - IDAS form 1

 

 

 

1.3 Does the proposal involve removing quarry material from a watercourse or lake for which an allocation
notice is required under the Water Act 2000?

[X]No
Ll Yes |- It is recommended that you complete part 2 of this checklist

 

 

 

 

 

1.4 Is any part of the proposed development intended to be carried out on a Queensland heritage place under
the Queensiand Heritage Act 1992?

—X] No

(Yes | It is recommended that you complete part 3 of this checklist

 

 

 

 

 

 

 

Croce cans

 

Puna LM Tatil) ® Queensland

Page 14

7 _
Lh i
1.5 Does the proposal involve development on a local heritage place?

KK] No
(J Yes

 

 

 

 

 

It is recommended that you complete part 4 of this checklist

 

 

1.6 Does the proposal involve an environmentally relevant activity, other than an agricultural ERA, a mining
activity or a chapter 5A activity?

 

 

XJ No

(Yes |} It is recommended that you complete part 5 of this checklist

 

 

 

 

1.7 Is any part of the development on strategic port land or airport land (other than development for a
material change of use that is inconsistent with the land use plan for the strategic port land or airport land)

 

 

No
OYes |- It is recommended that you complete part 6 of this checklist

 

 

 

 

1.8 Is any part of the development on land below a high water mark within the limits of a port under the
Transport Infrastructure Act 1994?

 

 

 

 

 

 

 

 

[Xx] No
(Yes }- It is recommended that you complete part 7 of this checklist
1.9 Is any part of the premises designated for community infrastructure?
[—X] No
[Yes |} It is recommended that you complete part 8 of this checklist

 

 

1.10 Does the proposal involve the establishment or expansion of a waste water disposal system?

[X]No

[Yes |- It is recommended that you complete part 9 of this checklist

 

 

 

 

 

 

1.11 Is the development on land that adjoins a declared fish habitat area under the Fisheries Act 1994?

 

 

No
O Yes |- It is recommended that you complete part 10 of this checklist

 

 

 

 

Privacy - please refer to your assessment manager for further details on the use of information recorded in
this checklist.

Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this
checklist and provided as part of this process will be of assistance to you, it is provided on the basis that you will
not rely on the information without first making your own enquiries regarding the interpretation and application of
the applicable legislation to your circumstances.

To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or
other consequence which may arise from your reliance on this process and the information contained on this
checklist.

sment checklist - IDAS checklist 1
Version 1.0 18 December 2009

 

 

Page 15

oo

 

OFFICE USE ONLY

 

Date received

 

 

 

Reference numbers

 

 

 

 

The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.

Versi

ecklist - IDAS checklist 1
ion 1.0 18 December 2009

Used in these records

About this file

File size
3.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 1 of 2 - IDAS Form 1 - Part 1 of 2 - IDAS Form 1 - Application for Jetty - 26 Masthead Quay, Noosaville.pdf · 3.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.