Attachment 1 - Proposal Plans
Plans and drawings: the text below has words only, no drawings.
LEVEL 1 PITCH
R.L. 11165
LEVEL 1 FCL
R.L. 11135 LINDSAY CONSULTING PTY
LTD
LEVEL 1 JOINERY
W W W
R.L. 10825 024 023 022 W
W
021 056
LEVEL 1 SFL
R.L. 8425 Connect all existing Dia 100 PVC downpipes to new drainage pipe
GROUND PITCH
R.L. 8065
GROUND FCL
R.L. 8035
W W
013 012 W W W W W
011 010 009 008 007
New Dia 150 PVC SN8 drainage pipe to connect uphill to
lawful point of discharge
GROUND SFL
5325
GROUND PAD Existing Blocked up Waffle Slab
5000 Ground level
Dia 25mm PVC Conduit from IL of new drainage pipe to pit
New Dia 150 PVC SN8 pipe 2% gradient
Suspended off existing concrete/blockwork wall
300x300 Pit with level spreader for slow release to empty captive pipe
150 min wide grated drain as the level spreader
REAR ELEVATION