Minor Change Existing Approval 51995 1483 05 {As Published} · 51995.1483.05
Officer: Samuel Osakwe
Direct Telephone: 07 5329 6316
Our Reference: 51995.1483.05
Your Reference: n/a
15 August 2024
Mr MJ Davies
Sobraon Sunrise
2/21 Sobraon St
SUNRISE BEACH QLD 4567
[email protected]
Dear Sir/Madam,
Decision Notice – Minor Change
Planning Act 2016
I refer to your application received on 26 April 2024, requesting a minor change to an existing
development approval. Council decided your requested changes.
Details of the decision are as follows:
1. APPLICATION DETAILS
Application No: 51995.1483.05
Street address: Sobraon Sunrise 2/21 Sobraon St Sunrise Beach Qld 4567
Real property description: Lot 2 BUP 104657 BUP 104657
Planning Scheme: Noosa Plan 2020 (25 September 2020)
2. DECISION DETAILS
The following type of approval was issued on 15 March 1995
• Development Permit for Material Change of Use for a Duplex Dwelling.
In relation to the request to make a minor change to the existing approval, Council on 12 August
2024, decided to approve the requested changes. The changes are detailed below.
A. Approve the change.
B. Amend condition 1.
3. CURRENCY PERIOD OF APPROVAL
Not applicable.
ABN 97.969.214.121 PO Box 141
noosa.qld.gov.au Tewantin QLD 4565
[email protected] 07 5329 6500
Page 1 of 9
Document Set ID: 23196375
Version: 2, Version Date: 15/08/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 8 pages
Page 2
4. ASSESSMENT MANAGER CONDITIONS
Approved Plans
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table and
may be amended by these conditions and annotations on the plans.
Plan No. Rev. Plan Name – Prepared by Date
SK-001 Ground Floor Plan – Unknown 8 April 2010
SK-002 1st Floor plan – Unknown 8 April 2010
SK-003 North Elevation - 01– Unknown 8 April 2010
SK-004 West Elevation - 02– Unknown 8 April 2010
Approved Plans – 3 July 2024
001 1 Floor/Site Plan prepared by Davies 24.04.21
Building Design
002 1 Elevations prepared by Davies Building 24.04.21
Design
2. The building height shall not exceed 8.0 metres above the natural ground level, finished
ground level and 2 storeys.
5. REFERRAL AGENCIES
Not applicable.
6. ADVISORY NOTES
Infrastructure Charges
1. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
7. PROPERTY NOTES
Not applicable.
8. VARIATION APPROVAL DETAILS
Not applicable.
9. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Building Works All building work.
10. SUBMISSIONS
Not applicable.
Page 2 of 9
Document Set ID: 23196375
Version: 2, Version Date: 15/08/2024
Page 3
11. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
12. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at
www.noosa.qld.gov.au or at Council Offices.
Yours faithfully,
Andrew Gaffney
Senior Development Planner
Enc: Appeal Rights
Approved Plans
TPC 2813
DECISION NOTICE HISTORY
• Original Decision Notice – TPC 2813 -15 March 1995
• Decision Notice – Minor 51995.1483.03 – 25 February 2010 with an amendment to condition 7.
Minor change 51995.1483.04 – 27 July 2010 with an amendment to condition 1.
Page 3 of 9
Document Set ID: 23196375
Version: 2, Version Date: 15/08/2024
Page 4
Page 4 of 9 Document Set ID: 23196375 Version: 2, Version Date: 15/08/2024 [OCR of page images] Nadine Gorton (074 495 228) TOWN PLANNING CONSENT PERMIT NO. : TPC 2813 DATE OF ISSUE : 2nd May, 1995 LAND : 21 Sobraon Street, Sunrise Beach, described as Lot 6 on RP 126838, Parish of Weyba. AREA OF LAND : 607m? USE OF LAND AT THE TIME OF APPLICATION : Vacant USE APPROVED IN THIS PERMIT : Duplex Dwelling CONDITIONS: 1, Submission to and approval by Council of building plans in accordance with the Building Act, Council's By-laws and Policies, the conditions of this approval and substantially in accordance with plans 8241/94, numbers 1,2,3 and the Shire of Noosa Planning Scheme apart from where amendments are required or dispensations have been granted in conjunction with this approval. 2. The plans submitted for Building Approval are to comply with Planning scheme provisions in relation to building height. In this regard, the building is not to exceed 8 metres from the existing natural ground surface level and modifications are required to the approved plans to achieve compliance. 3. Provision of at least 2 off-street car parking spaces, comprising 2 covered spaces and 1 uncovered spaces, and access thereto which are to be provided with a sealed pavement and designed, drained, constructed and maintained in accordance with the Planning Scheme, Council's Policies and to the reasonable satisfaction of the Shire Engineer. Plans and specifications for these works are to be submitted to the Shire Engineer for approval in conjunction with the Building Application. A Building Approval shall not be granted until the Shire Engineer has approved of the carparking and access scheme. Page 4 of 9 Document Set ID: 23196375 Version: 2, Version Date: 15/08/2024
Page 5
Page 5 of 9 Document Set ID: 23196375 Version: 2, Version Date: 15/08/2024 [OCR of page images] Town Planning Consent Permit - TPC 2813 Page 2 Modifications are required to the carparking layout. A revised plan indicating compliance with Council's design standards is to be submitted and approved by the Shire Engineer. 4. Payment of a contribution to Council in accordance with Council's Policy on Beach Access Contributions, prior to the issue of Building Approval. Such payment shall be in accordance with the contribution rate adopted by Council and current at the time of payment. An estimate only of the contribution at the date of this decision is $130. 5. There is to be no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. 6. The open space and setback areas are to be landscaped in accordance with Council's Policy on Landscaping Guidelines and a properly prepared landscape plan to be submitted to and approved by the Shire Planner, prior to the issue of a Building Approval. Such landscaping is to be completed in accordance with the approved landscape plan, prior to the premises being occupied and maintained at all times thereafter to the reasonable satisfaction of the Shire Planner, The landscape plan is to provide for dense screen plantings of predaminantly advanced local species to the David Low Way. 7. Any fencing provided in conjunction with the development is to be setback an average of two (2) metres to any road frontage pursuant to clause 36 (6) (c) of the Schedule to the Planning Scheme. 8. Existing trees on the site and within road reserves are to be retained, except where required to be removed due to building operations or the conduct of the approved use, The landscape plans referred to above are to denote areas of existing vegetation or existing trees proposed to be retained. 9. Construction work and other associated activities are permitted only during the hours of 7.00 a.m. to 6.00 p.m. Monday to Saturday. No work is permitted on public holidays, except where extended hours are approved by the Building Surveyor, Page 5 of 9 Document Set ID: 23196375 Version: 2, Version Date: 15/08/2024
Page 6
Page 6 of 9 Document Set ID: 23196375 Version: 2, Version Date: 15/08/2024 [OCR of page images] ‘Town Planning Consent Permit - TPC 2813 Page 3 Document Set ID: 23196375 Version: 2, Version Date: 15/08/2024 10. Payment of contributions in accordance with Council's Policy on Water Supply and Sewerage Headworks, An estimate only of the charges as at November 1994, under the current policy is as follows: Water Supply $3272 Sewerage $2975 TOTAL: $6247 Please note that the headworks charges will alter in accordance with Price Index variations of if any amendment is made to Council's policy. , Headworks contributions shall be calculated and paid in accordance with one of the following alternatives:- a. Prior to the issue of a Building Approval, in the amount calculated under the Policy at that date: or b. Deferred to the soonest of the following dates:- (i) prior to Council sealing plans of the development for titling purposes; (ii) prior to the issue of a Certificate of Classification for any building approved under this application; or (ii) prior to commencement of the approved use at the relevant premises. Where the option of a deferred payment is used in accordance with b. above, the following conditions shall also apply:- A. — Prior to the issue of a Building Approval, a trading bank guarantee is to be submitted to the value of the headworks which are due, plus 20%. B. The subsequent payment of headworks shall include interest charged at the rate set by the Queensland Treasury Corporation for Local Government borrowings as they apply to Noosa Shire and current at the time the trading bank guarantee is submitted. Page 6 of 9
Page 7
Page 7 of 9 Document Set ID: 23196375 Version: 2, Version Date: 15/08/2024 [OCR of page images] Town Planning Consent Permit - TPC 2813 Page 4 Document Set ID: 23196375 Version: 2, Version Date: 15/08/2024 11, 12. 13. 14, 15. 16. 17. 18. C. Should the contributions not be paid at the due time, Council shall call upon the sum secured by the trading bank guarantee. D. The trading bank guarantee will be returned on payment of the required contributions plus interest or on expiry of the relevant Building Approval, whichever is the sooner, The footpath across the frontage of the site is to be upgraded by the provision of a 1.2 metres wide concrete footpath and the forming, grassing and topsoiling of the remaining area to the standards and requirements of the Shire Engineer. The applicant is to contact Council's Engineering Department to determine the footpath alignment prior to the commencement of any works. Connection to Council's existing water supply and sewerage reticulation systems at the developer's expense to the standards and requirements of the The developer shall provide a metered water connections from the water supply system to the proposed development, in accordance with Council's standards and to the satisfaction of the Shire Engineer. Roof and surface water is to be collected on site and is to be discharged through a single underground drain line into existing drainage in David Low Way to the satisfaction of the Shire Engineer. A Building Approval shall not be granted until the Shire Engineer has approved of the drainage scheme. The developer shall bear the cost of alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site. Provision of an imperviously paved area upon which to stand all refuse containers together with a suitable enclosure, if required, to enclose the refuse container area to the satisfaction of the Environmental Health Officer. Any flat or unit intended to be let out for fee or reward is to be licensed annually with Council's Health Department in accordance with the provisions of Chapter 43 of Council's By-Laws prior to such letting. Submission of a cash bond or trading bank guarantee to the sum of $2,000 to secure performance of conditions, prior to the issue of Building Approval. The cash bond or trading bank guarantee will be returned upon performance of the conditions of approval. Page 7 of 9
Page 8
Page 8 of 9 Document Set ID: 23196375 Version: 2, Version Date: 15/08/2024 [OCR of page images] Document Set ID: 23196375 Version: 2, Version Date: 15/08/2024 Town Planning Consent Permit - TPC 2813 Page 5 19. 21. The provisions of this approval are to be effected, prior to the commencement of the approved use. Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect compliance with The Town Planning Consent Permit may be revoked pursuant to Section 4.14 of the Local Government (Planning and Environment) Act if commencement of erection or works have not been made in accordance with that Permit or the rights conferred by that Permit are not exercised within two (2) years of the date of issue of the Permit. The Town Planning Consent Permit lapses where:- a. the use or erection of a building or other structure associated with the use, has not been commenced within four (4) years of the date of issue of the Town Planning Consent Permit, unless application is made and approved by Council for an extension; or b. the use of any premises pursuant to the Town Planning Consent Permit ceases for a period of twelve (12) months, Page 8 of 9
Page 9
Appeal Rights
PLANNING ACT 2016 & PLANNING REGULATION 2017
Chapter 6 Dispute resolution (3) The appellant or, for an appeal to a tribunal, the registrar must,
within the service period, give a copy of the notice of appeal to –
Part 1 Appeal rights
(a) the respondent for the appeal; and
229 Appeals to tribunal or P&E Court
(b) each co-respondent for the appeal; and
(1) Schedule 1 of the Planning Act 2016 states –
(c) for an appeal about a development application under schedule
(a) Matters that may be appealed to –
1, table 1, item 1 – each principal submitter for the
(i) either a tribunal or the P&E Court; or development application; and
(ii) only a tribunal; or (d) for and appeal about a change application under schedule 1,
table 1, item 2 – each principal submitter for the change
(iii) only the P&E Court; and
application; and
(b) The person-
(e) each person who may elect to become a co-respondent for the
(i) who may appeal a matter (the appellant); and appeal, other than an eligible submitter who is not a principal
submitter in an appeal under paragraph (c) or (d); and
(ii) who is a respondent in an appeal of the matter; and
(f) for an appeal to the P&E Court – the chief executive; and
(iii) who is a co-respondent in an appeal of the matter; and
(g) for an appeal to a tribunal under another Act – any other
(iv) who may elect to be a co-respondent in an appeal of the
person who the registrar considers appropriate.
matter.
(4) The service period is –
(2) An appellant may start an appeal within the appeal period.
(a) if a submitter or advice agency started the appeal in the P&E
(3) The appeal period is –
Court – 2 business days after the appeal has started; or
(a) for an appeal by a building advisory agency – 10 business
(b) otherwise – 10 business days after the appeal is started.
days after a decision notice for the decision is given to the
agency; or (5) A notice of appeal given to a person who may elect to be a co-
respondent must state the effect of subsection (6).
(b) for an appeal against a deemed refusal – at any time after the
deemed refusal happens; or (6) A person elects to be a co-respondent by filing a notice of election,
in the approved form, within 10 business days after the notice of
(c) for an appeal against a decision of the Minister, under chapter
appeal is given to the person.
7, part 4, to register premises or to renew the registration of
premises – 20 business days after a notice us published under 231 Other appeals
section 269(3)(a) or (4); or
(1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
(d) for an appeal against an infrastructure charges notice – 20 the Supreme Court decides a decision or other matter under this
business days after the infrastructure charges notice is given Act is affected by jurisdictional error, the decision or matter is non-
to the person; or appealable.
(e) for an appeal about a deemed approval of a development (2) The Judicial Review Act 1991, part 5 applies to the decision or
application for which a decision notice has not been given – matter to the extent it is affected by jurisdictional error.
30 business days after the applicant gives the deemed
(3) A person who, but for subsection (1) could have made an
approval notice to the assessment manager; or
application under the Judicial Review Act 1991 in relation to the
(f) for any other appeal – 20 business days after a notice of the decision or matter, may apply under part 4 of that Act for a
decision for the matter, including an enforcement notice, is statement of reasons in relation to the decision or matter.
given to the person.
(4) In this section –
Note – decision includes-
See the P&E Court Act for the court’s power to extend the appeal
(a) conduct engaged in for the purpose of making a decision; and
period.
(b) other conduct that relates to the making of a decision; and
(4) Each respondent and co-respondent for an appeal may be heard
in the appeal. (c) the making of a decision or failure to make a decision; and
(5) If an appeal is only about a referral agency’s response, the (d) a purported decision; and
assessment manager may apply to the tribunal or P&E Court to
(e) a deemed refusal.
withdraw from the appeal.
non-appealable, for a decision or matter, means the decision or
(6) To remove any doubt. It is declared that an appeal against an
matter-
infrastructure charges notice must not be about-
(a) is final and conclusive; and
(a) the adopted charge itself; or
(b) may not be challenged, appealed against, reviewed, quashed,
(b) for a decision about an offset or refund-
set aside or called into question in any other way under the
(i) the establishment cost of trunk infrastructure identified in Judicial Review Act 1991 or otherwise, whether by the
a LGIP; or Supreme Court, another court, a tribunal or another entity; and
(ii) the cost of infrastructure decided using the method (c) is not subject to any declaratory, injunctive or other order of
included in the local government’s charges resolution. the Supreme Court, another court, a tribunal or another entity
on any ground.
230 Notice of appeal
232 Rules of the P&E Court
(1) An appellant starts an appeal by lodging, with the registrar of the
tribunal or P&E Court, a notice of appeal that- (1) A person who is appealing to the P&E Court must comply with the
rules of the court that apply to the appeal.
(a) is in the approved form; and
(b) succinctly states the grounds of the appeal. (2) However, the P&E Court may hear and decide an appeal even if
the person has not complied with the rules of the P&E Court
(2) The notice of appeal must be accompanied by the required fee.
Page 9 of 9
Document Set ID: 23196375
Version: 2, Version Date: 15/08/2024
Used in these records
Minor Change Existing Approval 51995 1483 05 {As Published}.pdfRelated documentApplication case desk ↗
About this file
- File size
- 674 KB (small file)
- File type
No other editions are linked here.