                                                             Officer:            Samuel Osakwe
                                                             Direct Telephone:   07 5329 6316
                                                             Our Reference:      51995.1483.05
                                                             Your Reference:     n/a

               15 August 2024


               Mr MJ Davies
               Sobraon Sunrise
               2/21 Sobraon St
               SUNRISE BEACH QLD 4567
               [email protected]



               Dear Sir/Madam,
                                            Decision Notice – Minor Change
                                                         Planning Act 2016

               I refer to your application received on 26 April 2024, requesting a minor change to an existing
               development approval. Council decided your requested changes.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              51995.1483.05

                   Street address:              Sobraon Sunrise 2/21 Sobraon St Sunrise Beach Qld 4567

                   Real property description:   Lot 2 BUP 104657 BUP 104657

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               The following type of approval was issued on 15 March 1995
               •       Development Permit for Material Change of Use for a Duplex Dwelling.
               In relation to the request to make a minor change to the existing approval, Council on 12 August
               2024, decided to approve the requested changes. The changes are detailed below.
                     A.    Approve the change.
                     B.    Amend condition 1.
               3.      CURRENCY PERIOD OF APPROVAL

               Not applicable.




               ABN 97.969.214.121                                                                       PO Box 141
               noosa.qld.gov.au                                                                  Tewantin QLD 4565
               [email protected]                                                                  07 5329 6500
                                                                                                            Page 1 of 9
Document Set ID: 23196375
Version: 2, Version Date: 15/08/2024
Full text of the other 8 pages

Page 2

               4.     ASSESSMENT MANAGER CONDITIONS

               Approved Plans
               1.        Development undertaken in accordance with this approval must generally comply with the
                         approved plans of development. The approved plans are listed in the following table and
                         may be amended by these conditions and annotations on the plans.

                           Plan No.          Rev. Plan Name – Prepared by                    Date

                           SK-001                   Ground Floor Plan – Unknown              8 April 2010

                           SK-002                   1st Floor plan – Unknown                 8 April 2010

                           SK-003                   North Elevation - 01– Unknown            8 April 2010

                           SK-004                   West Elevation - 02– Unknown             8 April 2010

                           Approved Plans – 3 July 2024

                           001               1      Floor/Site Plan prepared by Davies 24.04.21
                                                    Building Design

                           002               1      Elevations prepared by Davies Building 24.04.21
                                                    Design

               2.        The building height shall not exceed 8.0 metres above the natural ground level, finished
                         ground level and 2 storeys.
               5.     REFERRAL AGENCIES

               Not applicable.
               6.     ADVISORY NOTES

               Infrastructure Charges
               1.     All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further information, please refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges
               7.     PROPERTY NOTES

               Not applicable.
               8.     VARIATION APPROVAL DETAILS

               Not applicable.
               9.     FURTHER DEVELOPMENT PERMITS REQUIRED

                Type of Development Permit Required             Subject of the required Development Permit

                Development Permit for Building Works           All building work.

               10.    SUBMISSIONS

               Not applicable.




                                                                                                     Page 2 of 9
Document Set ID: 23196375
Version: 2, Version Date: 15/08/2024

Page 3

               11.      RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               12.      OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available on line at
               www.noosa.qld.gov.au or at Council Offices.


               Yours faithfully,




               Andrew Gaffney
               Senior Development Planner



               Enc:     Appeal Rights
                        Approved Plans
                        TPC 2813



               DECISION NOTICE HISTORY
               •     Original Decision Notice – TPC 2813 -15 March 1995

               •     Decision Notice – Minor 51995.1483.03 – 25 February 2010 with an amendment to condition 7.
                     Minor change 51995.1483.04 – 27 July 2010 with an amendment to condition 1.




                                                                                                                  Page 3 of 9
Document Set ID: 23196375
Version: 2, Version Date: 15/08/2024

Page 4

                                       Page 4 of 9
Document Set ID: 23196375
Version: 2, Version Date: 15/08/2024


[OCR of page images]
Nadine Gorton (074 495 228)
TOWN PLANNING CONSENT PERMIT

NO. : TPC 2813

DATE OF ISSUE : 2nd May, 1995

LAND : 21 Sobraon Street, Sunrise Beach,
described as Lot 6 on RP 126838, Parish of
Weyba.

AREA OF LAND : 607m?

USE OF LAND AT THE TIME

OF APPLICATION : Vacant

USE APPROVED IN THIS

PERMIT : Duplex Dwelling

CONDITIONS:

1, Submission to and approval by Council of building plans in accordance with
the Building Act, Council's By-laws and Policies, the conditions of this
approval and substantially in accordance with plans 8241/94, numbers 1,2,3
and the Shire of Noosa Planning Scheme apart from where amendments are
required or dispensations have been granted in conjunction with this approval.

2. The plans submitted for Building Approval are to comply with Planning
scheme provisions in relation to building height. In this regard, the building is
not to exceed 8 metres from the existing natural ground surface level and
modifications are required to the approved plans to achieve compliance.

3. Provision of at least 2 off-street car parking spaces, comprising 2 covered
spaces and 1 uncovered spaces, and access thereto which are to be provided
with a sealed pavement and designed, drained, constructed and maintained in
accordance with the Planning Scheme, Council's Policies and to the
reasonable satisfaction of the Shire Engineer. Plans and specifications for
these works are to be submitted to the Shire Engineer for approval in
conjunction with the Building Application. A Building Approval shall not be
granted until the Shire Engineer has approved of the carparking and access
scheme.

Page 4 of 9
Document Set ID: 23196375
Version: 2, Version Date: 15/08/2024

Page 5

                                       Page 5 of 9
Document Set ID: 23196375
Version: 2, Version Date: 15/08/2024


[OCR of page images]
Town Planning Consent Permit - TPC 2813 Page 2

Modifications are required to the carparking layout. A revised plan indicating
compliance with Council's design standards is to be submitted and approved
by the Shire Engineer.

4. Payment of a contribution to Council in accordance with Council's Policy on
Beach Access Contributions, prior to the issue of Building Approval. Such
payment shall be in accordance with the contribution rate adopted by Council
and current at the time of payment. An estimate only of the contribution at
the date of this decision is $130.

5. There is to be no detrimental effect upon the amenity of the neighbourhood by
reason of the creation of excessive noise, lighting nuisance or other emissions.

6. The open space and setback areas are to be landscaped in accordance with
Council's Policy on Landscaping Guidelines and a properly prepared
landscape plan to be submitted to and approved by the Shire Planner, prior to
the issue of a Building Approval. Such landscaping is to be completed in
accordance with the approved landscape plan, prior to the premises being
occupied and maintained at all times thereafter to the reasonable satisfaction of
the Shire Planner,

The landscape plan is to provide for dense screen plantings of predaminantly
advanced local species to the David Low Way.

7. Any fencing provided in conjunction with the development is to be setback an
average of two (2) metres to any road frontage pursuant to clause 36 (6) (c) of
the Schedule to the Planning Scheme.

8. Existing trees on the site and within road reserves are to be retained, except
where required to be removed due to building operations or the conduct of the
approved use, The landscape plans referred to above are to denote areas of

existing vegetation or existing trees proposed to be retained.

9. Construction work and other associated activities are permitted only during the
hours of 7.00 a.m. to 6.00 p.m. Monday to Saturday. No work is permitted
on public holidays, except where extended hours are approved by the Building
Surveyor,

Page 5 of 9
Document Set ID: 23196375
Version: 2, Version Date: 15/08/2024

Page 6

                                       Page 6 of 9
Document Set ID: 23196375
Version: 2, Version Date: 15/08/2024


[OCR of page images]
‘Town Planning Consent Permit - TPC 2813 Page 3

Document Set ID: 23196375
Version: 2, Version Date: 15/08/2024

10. Payment of contributions in accordance with Council's Policy on Water

Supply and Sewerage Headworks, An estimate only of the charges as at
November 1994, under the current policy is as follows:

Water Supply $3272
Sewerage $2975
TOTAL: $6247

Please note that the headworks charges will alter in accordance with Price
Index variations of if any amendment is made to Council's policy. ,

Headworks contributions shall be calculated and paid in accordance with one
of the following alternatives:-

a. Prior to the issue of a Building Approval, in the amount calculated
under the Policy at that date: or

b. Deferred to the soonest of the following dates:-

(i) prior to Council sealing plans of the development for titling
purposes;

(ii) prior to the issue of a Certificate of Classification for any
building approved under this application; or

(ii) prior to commencement of the approved use at the relevant
premises.

Where the option of a deferred payment is used in accordance with b. above,
the following conditions shall also apply:-

A. — Prior to the issue of a Building Approval, a trading bank guarantee is to
be submitted to the value of the headworks which are due, plus 20%.

B. The subsequent payment of headworks shall include interest charged at
the rate set by the Queensland Treasury Corporation for Local
Government borrowings as they apply to Noosa Shire and current at the
time the trading bank guarantee is submitted.

Page 6 of 9

Page 7

                                       Page 7 of 9
Document Set ID: 23196375
Version: 2, Version Date: 15/08/2024


[OCR of page images]
Town Planning Consent Permit - TPC 2813 Page 4

Document Set ID: 23196375
Version: 2, Version Date: 15/08/2024

11,

12.

13.

14,

15.

16.

17.

18.

C. Should the contributions not be paid at the due time, Council shall call
upon the sum secured by the trading bank guarantee.

D. The trading bank guarantee will be returned on payment of the required
contributions plus interest or on expiry of the relevant Building
Approval, whichever is the sooner,

The footpath across the frontage of the site is to be upgraded by the provision
of a 1.2 metres wide concrete footpath and the forming, grassing and
topsoiling of the remaining area to the standards and requirements of the Shire
Engineer. The applicant is to contact Council's Engineering Department to
determine the footpath alignment prior to the commencement of any works.

Connection to Council's existing water supply and sewerage reticulation
systems at the developer's expense to the standards and requirements of the

The developer shall provide a metered water connections from the water
supply system to the proposed development, in accordance with Council's
standards and to the satisfaction of the Shire Engineer.

Roof and surface water is to be collected on site and is to be discharged
through a single underground drain line into existing drainage in David Low
Way to the satisfaction of the Shire Engineer. A Building Approval shall not
be granted until the Shire Engineer has approved of the drainage scheme.

The developer shall bear the cost of alteration of any public utility or other
facilities necessitated by the development of the land or associated construction
works external to the site.

Provision of an imperviously paved area upon which to stand all refuse
containers together with a suitable enclosure, if required, to enclose the refuse
container area to the satisfaction of the Environmental Health Officer.

Any flat or unit intended to be let out for fee or reward is to be licensed
annually with Council's Health Department in accordance with the provisions
of Chapter 43 of Council's By-Laws prior to such letting.

Submission of a cash bond or trading bank guarantee to the sum of $2,000 to
secure performance of conditions, prior to the issue of Building Approval. The
cash bond or trading bank guarantee will be returned upon performance of the
conditions of approval.

Page 7 of 9

Page 8

                                       Page 8 of 9
Document Set ID: 23196375
Version: 2, Version Date: 15/08/2024


[OCR of page images]
Document Set ID: 23196375
Version: 2, Version Date: 15/08/2024

Town Planning Consent Permit - TPC 2813 Page 5

19.

21.

The provisions of this approval are to be effected, prior to the commencement
of the approved use. Council reserves the right to call upon the bond or
guaranteed sum referred to in this approval to effect compliance with

The Town Planning Consent Permit may be revoked pursuant to Section 4.14
of the Local Government (Planning and Environment) Act if commencement
of erection or works have not been made in accordance with that Permit or the
rights conferred by that Permit are not exercised within two (2) years of the
date of issue of the Permit.

The Town Planning Consent Permit lapses where:-

a. the use or erection of a building or other structure associated with the
use, has not been commenced within four (4) years of the date of issue
of the Town Planning Consent Permit, unless application is made and
approved by Council for an extension; or

b. the use of any premises pursuant to the Town Planning Consent Permit
ceases for a period of twelve (12) months,

Page 8 of 9

Page 9

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                    Page 9 of 9
Document Set ID: 23196375
Version: 2, Version Date: 15/08/2024

Used in these records

About this file

File size
674 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval 51995 1483 05 {As Published}.pdf · 674 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.