Original source · versioned page text
Appendix C & D - SPP and SDAP
Matters of State Type Referral Relevant Relevant State SARA Referral
Interest Required Provisions of Codes or Non-SARA
the Regulation Referral
Op. Works Referral Schedule 10, If near a state SARA Referral
not Part 9, Division controlled road
required 4, Subdivision 2, or future state
Table 5 (State controlled road:
transport
State code 1:
corridor)
Development in a
Schedule 10, state-controlled
Part 9, Division road environment
4, Subdivision 2,
In near a railway
Table 6 (Future
corridor or future
State transport
railway corridor:
corridor)
State code 2:
Development in a
railway
environment
If near a busway
corridor or future
busway corridor:
State code 3:
Development in a
busway
environment
If near a light rail
corridor or future
light rail corridor:
State code 4:
Development in a
light rail
environment
State-controlled RoL on or near Referral Schedule 10, State code 5: SARA Referral
transport tunnels a State- not Part 9, Division Development in a
and future State- controlled required 4, Subdivision 3, state-controlled
controlled transport tunnel Table 1 transport tunnel
transport tunnels or future State- environment
controlled
transport tunnel
MCU on or Referral Schedule 10, SARA Referral
near a State- not Part 9, Division
controlled required 4, Subdivision 3,
transport tunnel Table 2
or future State-
12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original