Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Appendix C & D - SPP and SDAP

of 19

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Matters of State Type               Referral Relevant              Relevant State      SARA Referral
Interest                            Required Provisions of         Codes               or Non-SARA
                                             the Regulation                            Referral

Water Related      Op. Works        Referral   Schedule 10,        State code 10:      SARA Referral
Development –                       not        Part 19, Division   Taking or
taking or                           required   1, Subdivision 3,   interfering with
interfering with                               Table 1
                                                                   water
water
Water Related      All aspects of   Referral   Schedule 10,        State code 15:    SARA Referral
Development –      Dev.             not        Part 19, Division   Removal of quarry
Removal of                          required   2, Subdivision 3,   material from a
Quarry Material                                Table 1
                                                                   watercourse, lake
                                                                   or estuary
Water Related      Op. Works        Referral   Schedule 10,        State code 20:      SARA Referral
Development –                       not        Part 19, Division   Referable dams
Referable dams                      required   3, Subdivision 3,
                                               Table 1
Category 3         Op. Works        Referral   Schedule 10,        State code 19:      SARA Referral
levees                              not        Part 19, Division   Category 3 levees
                                    required   4, Subdivision 3,
                                               Table 1
Wetland            Op. Works        Referral   Schedule 10,        State code 9:      SARA Referral
protection area                     not        Part 20, Division   Great Barrier Reef
                                    required   4, Table 1          wetland protection
                   RoL              Referral   Schedule 10,        areas              SARA Referral
                                    not        Part 20, Division
                                    required   4, Table 2
                   MCU              Referral   Schedule 10,                            SARA Referral
                                    not        Part 20, Division
                                    required   4, Table 3
Wind farms         MCU              Referral   Schedule 10,        State Code 23:      N/A
                                    not        Part 21, Division   Wind farm
                                    required   1, Table 1                              Note: SARA is
                                                                   development
                                                                                       the prescribed
                                                                                       assessment
                                                                                       manager




                                                                                                  19
Log in to download the original file

Appendix C & D - SPP and SDAP.pdf · 261 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.