08/0383 - Referral Agency Response - Q.T (Maritime Safety Queensland) [As Published] · 142008.383
. oe 7. You, or your agent, must remove any obstructions and debris encountered during construction, and dispose of them, as the Harbour Master requires. 8. Any ships and equipment you or your agent use must comply with the Transport Operations (Marine Safety) Act 1994, the Transport Operations (Marine Safety) Regulation 2004 and the Transport Operations (Marine Pollution) Act 1995, 9. This facility is not to be used for the mooring of vessels. 10. Any ships, plant or equipment that deploy anchors in open waters, and in and near shipping channels must have the anchors marked with yellow buoys and fitted with F1 Yellow lights. 11. The contractor must complete construction within two years from the date of approval. If "construction is not completed, you will need additional or amended-comments from the Regional Harbour Master. Maritime Safety Queensland does not need to be further consulted if all of the above conditions are met. The above conditions must be included in your application to the assessment manager. of Yours sincerely BLE Captain Richard C Johnson Regional Harbour Master (Brisbane) Maritime Safety Queensland Page 2 of 2 AE eet. ce
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0383 - Referral Agency Response - Q.T (Maritime Safety Queensland) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 75 KB (small file)
- File type
No other editions are linked here.