Original source · versioned page text
Stormwater Report
CO NT E NT S
1 INTRODUCTION ..................................................................................................................... 1
2 SITE DESCRIPTION ............................................................................................................... 1
2.1 Location and Land Use ............................................................................................................ 1
2.2 Lawful Point of Discharge ........................................................................................................ 2
2.3 Upstream Drainage Connection .............................................................................................. 2
2.4 Flooding ................................................................................................................................... 2
3 STORMWATER QUANTITY MANAGEMENT ........................................................................ 2
4 WATER QUALITY MANAGEMENT ....................................................................................... 2
4.1 Operational Phase ................................................................................................................... 2
4.2 Construction Phase ................................................................................................................. 3
4.2.1 Design Objectives .................................................................................................................... 3
4.2.2 Erosion and Sediment Control ................................................................................................. 5
4.2.3 Maintenance and Monitoring Requirements ............................................................................ 6
5 CONCLUSION ......................................................................................................................... 7
6 APPENDICES ..................................................................................................................... A-1
Appendix A – Erosion Hazard Assessment ........................................................................................ A-1
Appendix B – Flood Information Certificate ........................................................................................ B-1
Appendix C – Engineering Plans ........................................................................................................ C-1
Appendix D – Site Survey & Architectural Drawings .......................................................................... D-1
List of Tables
Table 1 – Pollutants Typically Generated During the Construction Phase ............................................. 3
Table 2 – SPP Appendix 2: Part 1 Construction Phase – Stormwater Management Design Objectives
.............................................................................................................................................. 3
Table 3 – SPP Appendix 2: Part 2 Construction Phase – Stormwater Management Design Objectives
for Temporary Drainage Works ............................................................................................ 5
Table 4 – SPP Appendix 2: Part 3 Construction Phase – Stormwater Management Design Objectives
for Emergency Spillways on Temporary Sediment Basins................................................... 5
Table 5 - ESC maintenance requirements. ............................................................................................. 6
List of Figures
Figure 1 – Indicative site location (Nearmaps, 2021) ............................................................................. 1
iii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.