Original source · versioned page text
Stormwater Report
LANDSCAPING
Landscape area required: 242m2 (40%)
Landscape area provided: 242m2 (40%)
Soft Lansdcape required: 145m²
Soft Lansdcape provided: 145m²
02
510
9
RP136
6,000 6,000
S-06
setback setback
8,000 90 6,200 90 1,600 90 1,300 90 4,460 90 8,165
1,200 190 800
setback
1,500
8
1,500
BINS CLOTHESLINE
RP113358
90
90
WIP
2,640
bike
store
6,100
GARAGE
10,058
49.58 m2
64.91 m2
8,373
PWD
POOL
5X3
90
R D
2,183
W E Y B A
510
10
RP136
190
190
01
03
POOL
5X3
PWD
10,059
GARAGE
bike
store
WIP
BINS CLOTHESLINE
setback
1,500
ISSUE DATE DESCRIPTION PROJECT: DRAWING: DRAWING NUMBER: REVISION
HIVE ARCHITECTURE
SD1 08/07/21 CONCEPT DESIGN
DD1 25/08/21 DEVELOPED DESIGN 183 WEYBA RD LANDSCAPE AREAS A.01.04 DD1
NOOSAVILLE QLD 4566
SCALE: DATE:
LOT 8 RP 113358
1:100 @A3 25/08/2021
CLIENT: PROJECT NUMBER:
w w w . h i v e a r c h i t e c t u r e . c o m . a u
MBYE 2115 SCHEMATIC DESIGN
GSPublisherVersion 0.0.100.100
NOT FOR CONSTRUCTION © HIVE Architecture 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.