Skip to the record
Search everything, all in one place.

Original source · versioned page text

DBW21-0160_IC-N1699_424 Black Pinch Road COOTHARABA

of 6

Page text read automatically using OCR, there may be inaccuracies

INFRASTRUCTURE CHARGE CALCULATION DETAILS:
The infrastructure charge is calculated in accordance with Council’s Infrastructure Charges Resolution incorporating the charge apportionment (break-up) agreement with Unitywater in
compliance with the planning legislation and regulations applying at the time of issuing the notice.



                                                              NOOSA SHIRE COUNCIL CHARGES RESOLUTION (No.6) 2021 (Effective 20 August 2021)
          The Noosa Plan 2006              Planning Regulation 2017 &
      (Superseded planning scheme)            The Noosa Plan 2020
                                                                                                                        Current at: 1 July 2021 for the 2021-2022 Financial Year
                 Column 1a                          Column 1b                                       Column 2                                          Column 3                                            DBW21/0160
                                                                                                                                               COUNCIL            COUNCIL
                                                                                            Planning Regulation 2017                                                                            COUNCIL CHARGE CALCULATION
                                                                                                                                            APPORTIONMENT         CHARGE
                                                                                        Schedule 16 Prescribed amount                                                                                                NET
                     Use                                Use
                                                                            (As inserted by the “Planning Legislation (Fees and Other       (per Charges breakup agreement APPROVED EXISTING                                      CHARGE
                                                                                                                                                                                                             CHARGEABLE
                                                                                    Amounts) Amendment Regulation 2021”)                          of Prescribed amount)       QTY     QTY                                        AMOUNT $
                                                                                                                                                                                                                     QTY
Residential uses
• Detached house
                                     1 Dwelling house
• Ancillary dwelling unit                                                  for each dwelling with 3 or more bedrooms           $30,677.65          60%            $18,406.59        1               1                 0                     $0.00
                                     2 Dual occupancy
Multiple housing
                                     3 Caretaker’s accommodation           for each dwelling if Secondary dwelling to
• Type 2 Duplex                                                                                                                $21,912.60          60%             $6,534.01        1                                 1                 $6,534.01
                                     4 Multiple dwelling                   Dwelling house (Council reduced rate by -50.3%)
• Type 4 Conventional
                                                                                                                                                                                          Sub-Total, Residential =                     $6,534.01



                                                                                                                                                                                                                                 Calculation at
                                                                                                                                                                                                                                    Planning
                                                                                                                                                                                                                                   Regulation
                                                                                                                                                                                                                                    2021-2022
                                                                                                                                                                                                                                 Financial Year

                                                                                                                                                                    CALCULATED INFRASTRUCTURE CHARGE =                                 $6,534.00
                                                                                                                                                                 Transport and/or Stormwater network service reductions due to
                                                                                                                             Location                                                                                                     $967.00
                                                                                                                                                                 development location
                                                                                                                                                                 Council Policy “Infrastructure Charges Rebates For Community
                                                                                                                             Rebate                                                                                                         $0.00
                                                                                                                                                                 Organisations”
                                                                                         REDUCTIONS
                                                                                                                             Trunk Infrastructure Offset                                                                                    $0.00

                                                                                                                             Other                                                                                                          $0.00

                                                                                                                                                    *NET INFRASTRUCTURE CHARGE PAYABLE =                                             $5,567.00




                                                                                     PO Box 141                               P. (07) 5329 6500             [email protected]
                                                                                     TEWANTIN QLD 4565                        F. (07) 5329 6501             www.noosa.qld.gov.au                        ICN - Page 3


[OCR of page images]
INFRASTRUCTURE CHARGE CALCULATION DETAILS:

The infrastructure charge is calculated in accordance with Council’s Infrastructure Charges Resolution incorporating the charge apportionment (break-up) agreement with Unitywater in
compliance with the planning legislation and regulations applying at the time of issuing the notice.

 

NOOSA SHIRE COUNCIL CHARGES RESOLUTION (No.6) 2021 (Effective 20 August 2021)

 

The Noosa Plan 2006

Planning Regulation 2017 &

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(Superseded planning scheme) The Noosa Plan 2020 Current at: 1 July 2021 for the 2021-2022 Financial Year
Column ta Column 16 Column 2 Column 3 DBW21/0160
COUNCIL COUNCIL
Planning Regulation 2017 apportionment | CHARGE COUNCIL CHARGE CALCULATION
u u Schedule 16 Prescribed amount NET
“e se (As inserted by the “Planning Legislation (Fees and Other | (per Charges breakup agreement |APPROVED| EXISTING | 1.0 | CHARGE
Amounts) Amendment Regulation 2021”) of Prescribed amount) arty QTy ary AMOUNT $
Residential uses
* Detached house T Dwelling h
* Ancillary dwelling unit welling house for each dwelling with 3 or more bedrooms $30,677.65] 60% $18,406.59] 1 1 0 $0.00
e 2 Dual occupancy
Multiple housing 3 Caretaker’s accommodation for each dwelling if Secondary dwell
Secondary dwelling
* Type 2 Duplex a Multiple dwell or each dwelling if Secondary dwelling to $21,912.60] 60% $6,534.01 1 1 $6,534.01
“Tune. 4 Conventional lultiple dwelling Dwelling house (Council reduced rate by -50.3%)
Sub-Total, Residential = $6,534.01
Calculation at
Planning
Regulation
2021-2022
Financial Year
CALCULATED INFRASTRUCTURE CHARGE = $6,534.00
- Transport and/or Stormwater network service reductions due to
Location ‘ $967.00]
development location
Rebate counal Pole Infrastructure Charges Rebates For Community $0.00
REDUCTIONS oe
‘Trunk Infrastructure Offset $0.00}
Other $0.00}
*NET INFRASTRUCTURE CHARGE PAYABLE = $5,567.00
PO Box 141

NOOSA COUNCIL

TEWANTIN QLD 4565

P. (07) 5329 6500
F. (07) 5329 6501

[email protected]
www.noosa.qid.gov.au

ICN - Page 3

Log in to download the original (DBW21-0160_IC-N1699_424 Black Pinch Road COOTHARABA.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.