Original source · versioned page text
RFI - Updated Engineering Plans
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSW
[OCR of page images]
EXISTING GULLY PIT
[— SL 60.50 NEW GULLY PIT WITH KERB ENTRY RECONSTRUCTION GULLY PIT
IL 59.37 -—— 10 NOOSA SHIRE COUNCILS WITH KERB ENTRY 10 ——_
DRAWING No. 9223 A NOOSA SHIRE COUNCILS
I BREAK INTO EXISTING GULLY SL 70.5 DRAWING No, 9223 A
J IL 69.3 SL 75.15
IL 72.40 NN
X
« N
% % % % % % % % % % % % % tt
— y — I —_ SS _——— f Se] nn nna nn nnn nn nn nn nn a a a a —s
SS ODS SS Se = Se eS eS ee a a ft ODES Set OSS OS eee = 3 ow —— Sw ww ew ew ew —
ar \* \e yi ST Wo0#, CONCRETE CLASS PPE NJ x x \ OSL 6960 5006 CONCRETE, OLASS 2 PIPE ) [x us. 7240 S i ia
. in . o . ee — =, "
\ \ SN \_ | LN \ | \ \ IN ‘ | / | ( | oye 7
w w w. —— ‘ i rN w w. Y " wi w w. \ Ee * : — : + wo <= - Ww w— w— > w— ao, “— — — a : : : - = = —— tr zo = —= = St SS= =
_—— ' " ' cane Ly . " 7 7 {—» , " , —j—" , " ' — 7 —p— " " » " . Ie 7 7 7 oS — "
) —) _ . ~ — —— — LL aN od i *— —— 7 Li — TN Pg yop pe PP aa
& 4 c “ Nc |
be, \
° | | | | | 5m x 3m x 2m DEEP =_——— RN ee oN \™ \
—_ STORMWATE DETENTION TANK ; \ \
EXISTING GULLY PIT | — —— | > | | MO yy
SL 60.00 | | Sy | ORIFICE PLATE 1508 |
“XN
IL 59.14 | ! | | | 300 PIPE | LR \ ‘|
| . | : | ~ \ GRATED DRAIN a | PROPOSED BUILDING a | i
| | | | SPEL FILTER SYSTEM CHAMBER AS. ; e_}| — 8 74.50 \ ! if|
PER DRAWING No. SP20-SF14610-P : iL\72.600 & /
| | | WITH 7 SPEL FILTER CARTRIDGES | | M C | J < C ‘|
| | | \ s |
SS
| | 2000 | \ \ S |
\ | | | LANDSCAPE \ . ~\ | |
\ ZONE | | TTA a g s M
\ \ S Ss \
| | | | | PROPOSED BUILDING | S | Ss \ a
\ | | | 4a | | 8 3 \ SWALE DRAN —4 || is,
N \ | x a Ny
\ | | | \ a |
\ | Vlg \ i MW
a a 2
~ | l= \ S 1
| I % |
2 \ 2 |
| | —_ * | |
: se oe :
| | <—— 2256 UPVC PIPE \ 2050 UPVC PPE al B80 U-— 7 IL 7400 | |
1506 STUB FOR ROOF WATER IL 73.50 \ -—— sor PVE Pre |
~ TYPICAL. Y Al / . ‘|
: ¢ \ 2
_ oe PROPERTY BOUNDARY LINE | | [ \ ~N ~ s |||
a \ S
: | \ “ny 8 My
— EXISTING TELSTRA LINE | | fy, 3 |
: | \ \ “he \ lI
—__w—___ EXISTING WATER MAIN | yl | | -_ \ a
2 \ VM
2 | IAI | |
Wy ~~————-~ EXISTING CONTOUR LINE (1.0m INTERVALS) | | \ ! I, eB boy
| | \ |
° EXISTING POWER POLE | | \l PROPOSED BUILDING | \ \ yy
~~ | | \ _ |
© EXISTING TELSTRA PIT | | ys g
| | | \\ PROPOSED BUILDING Ss Ml
a PROPOSED 600 x 600 SPEL FILTER BASKET | L — —)\— — _| N ( 5 | |
\ =
AS PER MANUF. ‘SPEC. | 450 m2 i SITE DISCHARGES \ \ ” a
| THROUGH CORNER \ \ |
a PROPOSED 450 x 450 FIELD INLET | NO CHANGE IN DIRECTION OF \ \ | |
\ /
. \ \ { .
U &
——— = ey,
oe \ See Ee SE
| “ay Ay Ty Sy |
1. STORMWATER PIPES SHALL BE OF THE TYPES DESIGNATED ON THE DRAWINGS | | |
OR UNLESS OTHERWISE APPROVED BY THE SUPERINTENDENT. | |
2. HARDITUBE PIPES (uPVC) SHALL BE MANUFACTURED IN ACCORDANCE WITH |
AUSTRALIAN STANDARD AS1254 ‘UNPLASTICISED PVC (uPVC) PIPES AND | |
FITTINGS FOR STORM AND SURFACE WATER APPLICATIONS’.
3. ALL PVC PIPES SHALL BE LAID AT A MINIMUM GRADE OF 1 IN 100 AND | |
HAVE A MINIMUM COVER OF 600mm IN TRAFFICABLE REGIONS.
ALL PVC PIPES SHALL BE R.Ru. AND SHALL HAVE AN INSPECTION OPENING
AT ALL CHANGES IN DIRECTION AND GRADE,
ALL JUNCTIONS BETWEEN uPVC PIPES SHALL BE FORMED USING PIPE MANUFACTURES
STANDARD R.R.J. JUNCTIONS
4. ALL PIPES AND PITS SHALL BE HANDLED AND STORED IN STRICT ACCORDANCE
WITH THE MANUFACTURERS RECOMMENDATIONS.
5. ALL PIPES SHALL BE FREE OF DEFECTS, DAMAGE AND DISTORTION. | 00
7 | 6. ALL PIPES SHALL BE BEDDED ON SAND OR APPROVED GRANULAR MATERIAL Z| |____ SWALE DRAIN
z wo | WHICH SHALL EXTEND TO A MINIMUM DEPTH OF 100mm BELOW THE LOWEST S| FALL 10 OUTLET
5 5 ~ PART OF THE PIPE. (REFER TO TYPICAL PIPE TRENCH SECTION). *
Zz = B = | | NATURAL GROUND LINE
& & Ps = 7. THE FINISHED LINE AND GRADE OF DRAINS SHALL NOT DEVIATE BY MORE THAN : |
= Ss 4 S —— _
= S z 3 Z | 10mm AT ANY POINT. UNLESS OTHERWISE APPROVED BY THE SUPERINTENDENT. ne
£ TEWLAND DRIVE 8. NO BACKFILLING OF TRENCHES SHALL OCCUR UNLESS APPROVED BY THE | Wap eS
2 | SUPERINTENDENT. |
| 9. FINISHED LEVELS OF PAVEMENTS SHALL BE CONSTRUCTED WITHIN TOLERANCE
OF + Smm OF THE SPECIFIED LEVEL. |
ty
cD | 10. LOCATIONS OF SPOT LEVELS CAN BE SCALED OFF DRAWINGS WITHIN
@ | + 100mm.
>
AS SCALE 1:5000
APPROVED SCALE 1:250 JOB DESCRIPTION DRAWING TITLE
—<— NEIL McKENZIE & ASSOCIATES PTY. LTD. ORAWN i
C SW RUBBLE DRAIN PIT RELOCATED 08.02.21 dL CONSULTING ENGINEERS CHECKED NM
; LANDSCAPE ZONE ADDED Ht : MLE. AUST, RP.E.Q. 2097, NP.ER. 3 DESIGNED NM
— THIS DRAWING REMAINS THE PROPERTY OF APPROVED NM CLIENT DRAWING REVISION
No. REVISION DATE DWN | NEIL McKENZIE & ASSOCIATES C Copyright DATE OCT. 20 NUMBER NUMBER
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 6 pages
Page 2
EXISTING GULLY PIT SURFACE LEVEL 60.50 INVERT LEVEL 59.37 CHAINAGE 3008 CONCRETE CLASS 2 STORMWATER PIPE NEW GULLY PIT WITH KERB ENTRY TO NOOSA SHIRE COUNCILS DRAWING No. 9225 A 3008 CONCRETE CLASS 2 STORMWATER PIPE RECONSTRUCTION GULLY PIT WITH KERB ENTRY 10 NOOSA SHIRE COUNCILS DRAWING No. 9225 A om x 3m x 2m DEEP STORMWATE DETENTION TANK 3008 CONCRETE CLASS 2 STORMWATER PIPE DATUM RL 55.00 WITH RUBBER RING JOINT WITH RUBBER RING JOINT WITH RUBBER RING JOINT 70.50 70.50 79.15 74.50 69.30 69.60 72.40 72.50 0.00 75.039 137.065 145.765 LONGITUDINAL SECTION SCALE : 1 IN 250 HORIZONTALLY 1 IN 125 VERTICALLY APPROVED 28.01.21 dL 18.11.20 dL MILE AUST, _RP.E.Q. 2097, NP.ER_3 No. REVISION DATE DWN THIS DRAWING REMAINS THE PROPERTY OF NEIL McKENZIE & ASSOCIATES (C) Copyright NEIL McKENZIE & ASSOCIATES PTY. LTD. CONSULTING ENGINEERS 14/699a SANDGATE ROAD CLAYFIELD, QLD 4011 PHONE: (07) 3862 1886 FAX: (07) 3862 1397 SCALE AS SHOWN JOB DESCRIPTION DRAWING TITLE DRAWN dl NOOSA YOUNGCARE STORMWATER DRAINAGE LONG SECTION CHECKED NM 32 VIEWLAND DRIVE DESIGNED NM NOOSA HEADS APPROVED — WSN DELUCA DEVELOPMENT & CONSTRUCTION | nunsee Q20-004-C02 eer —B
Page 3
SW [OCR of page images] EXISTING SEWER M/H NEW SEWER M/H | SL 70.75 SL 75.15 | IL 69.43 | 2 pe Np NN | \ oO. — .— . ~L . SN . —_ : t : Dsl 3.50 + o \ ON 150 PVC SN hI eo 4] st iE <—__ $ $ $ x VIEWLAND ORE 2 . e / = oO. 3: Z o ee 3 SB Be a 5 > > % SN a ‘% % % % % S % % a @ °% % — oo = — SZ SSS SS SS SSS SSS SS SS SSS = —== = Se \ ‘ \ \ \ \ . o \ \ / " wn Nw ¥ , \C \ ~ \ \ \ \ \ \ ’ \ \ } / 7 Iw a w w w Ww: " wy ww: x c" v ‘\: bp wu, —» EEA pee w. ; w. Sa — wo i ws + + + + 7 7 a X w oo TL w w. w w w w w. » w t w w "—y w. w——w. w ‘ w w "— w w. a w w w x — i} 4 man TY an ~ \ — —— - + — \ Te =) ~ —— bE ba. er ey ee ee eK ee ee ~S NT oS . c % % ; \; @ OQ | \Y™* \ —. | | |. 38f0 1508 PROPERTY CONNECTIO \ \ el ee ; SL 75.20 Ne | | Zim | | IL 72.50 T ¥ | | a » Il| | | PROPOSED BUILDING | M | \ \ | | /| Cl NN : . \ Xu MY \ | | \ | | | Ts | iy M N | | \ Ul ‘ N\ | | \ MI cay N\ . | a | | rn MI | | Ny => Ik —___# = |i . | / Ml / | SS | AN SEWERAGE LAYOUT PLAN : : : Tl PROPERTY BOUNDARY LINE | | A, \ | | — — . \ ! 1 \ T| t EXISTING TELSTRA LINE | y \ t \°2 | \l | \ Y W EXISTING WATER MAIN - | | | l 4g ~~~ ~. EXISTING CONTOUR LINE (1.0m INTERVALS) | | \ | ~> PROPOSE BUILDING NI | | L_ —\y— — N \ [|| . EXISTING POWER POLE | 1 ! Ly | | | \ \\ Ny @ EXISTING TELSTRA PIT " ( \ \ , \ / a PROPOSED 600 x 600 SPEL FILTER BASKET } | \ \ | AS PER MANUF. SPEC. q —--o-yr rrr —-s-rr a, ee ee eC ee ee ee ae a PROPOSED 450 x 450 FIELD NET NEE | ly 4g) ye | | | | | ws | | | = 2 | ne b e\\ | | | ce S & = 4] || E Z =\\ | = WEWLAND ORVE : | | Ny > LOCALITY PLAN SCALE 1:5000 APPROVED SCALE 1:250 JOB DESCRIPTION DRAWING TITLE _—_— NEIL McKENZIE & ASSOCIATES PTY. LTD. DRAWN i NOOSA YOUNGCARE SEWERAGE LAYOUT PLAN CONSULTING ENGINEERS CHECKED NM 32 VIEWLAND DRIVE 14/699a SANDGATE ROAD DESIGNED NM NOOSA HEADS A LANDSCAPE ZONE ADDED 20. | Foe ——eeees SHON toe Tee 4 386 APPROVED NM CLIENT DRAWING REVISION No. REVISION DATE DWN | NEIL McKENZIE & ASSOCIATES (C) Copyright FAX: oy 3862 1397 DATE OCT. 20 DELUCA DEVELOPMENT & CONSTRUCTION NUMBER Q20-004-C03 NUMBER A
Page 4
PROPERTY CONNECTION
= = |
= = Z|
= = S
2 = a
& = S|
MAINTENANCE HOLE / SHAFT No. - a =
MH / MS COVER TYPE @) |
MH / MS TYPE P2 |
BRANCH DROP TYPE A |
PROPERTY CONNECTION TYPE
EXISTING SEWER PIPE
DATUM 69.00
SW
PROP. DESCRIPTION
FP.
ROAD
PIPE NOMINAL DIAMETER (DN) TYPE, CLASS
DN 150 PVC SN8
DN 150 PVC SN8
GRADE (1 IN X)
20
87
LENGTH
61690
21774
DEPTH OF INVERT BELOW F.S.L.
1.320
1.250
2.90
2.70
INVERT LEVEL (IL)
69.43
69.50
72.25
72.50
FINISHED SURFACE LEVEL (FSL)
70.75
75.15
75.20
EXISTING SURFACE LEVEL (ESL)
70.75
CHAINAGE
0.00
61.690 | 75.15
83.465 75.20
LONGITUDINAL SECTION
SCALE: 1:250 — HORIZONTAL
G
1.
GENERAL NOTES :
ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT SOUTH EAST
QUEENSLAND SEWERAGE CODE SPECIFICATIONS AND STANDARDS.
. UNLESS SPECIFIED OTHERWISE ALL MATERIALS AND WORK SHALL COMPLY WITH
THE RELEVANT AUSTRALIAN STANDARDS.
. THE CONSTRUCTION OF THE SEWERAGE WORK SHOWN ON THIS DRAWING SHALL BE
SUPERVISED BY AN ENGINEER WHO HAS RPEQ REGISTRATION. SEWERAGE WORKS NOT
COMPLYING WITH THIS REQUIREMENT WILL NOT BE PERMITTED TO CONNECT INTO
THE SEQ SERVICE PROVIDER SEWERAGE SYSTEM.
. ALL WORK ASSOCIATED WITH LIVE SEWERS OR MAINTENANCE HOLES SHALL BE
CARRIED OUT BY THE SEQ SERVICE PROVIDER AT THE DEVELOPER'S COST.
. ALL PIPES AND MATERIALS SHALL COMPLY WITH THE REQUIREMENTS OF THE
"ACCEPTED PRODUCTS AND MATERIALS” LIST.
. EACH ALLOTMENT SHALL BE SERVED BY A DN110 PE (OR DN100 PVC) PROPERTY
CONNECTION. FOR ALLOTMENTS OTHER THAN SINGLE RESIDENTIAL, A DN160 PE (OR
DN150 PVC) PROPERTY CONNECTION SHALL BE PROVIDED.
. PROPERTY CONNECTIONS SHALL BE LOCATED WITHIN THE PROPERTY AS SHOWN IN
THE DRAWINGS.
. PROPERTY CONNECTION BRANCHES SHALL EXTEND INTO THE PROPERTY A MINIMUM
OF 300mm AND A MAXIMUM OF 750mm. UNITYWATER REQUIRES MINIMUM EXTENSION
OF 500mm INTO PROPERTY.
. WHERE PIPES ARE LAID IN FILL, THE FILLING SHALL BE CARRIED OUT IN LAYERS
NOT EXCEEDING 300mm (LOOSE) IN DEPTH AND SHALL BE COMPACTED UNTIL THE
COMPACTION IS NOT LESS THAN 95% OF THE MATERIALS MAXIMUM COMPACTION
WHEN TESTED IN ACCORDANCE WITH A.S. 1289 (MODIFIED COMPACTION). TESTING
SHALL BE CARRIED OUT AFTER EACH ALTERNATE LAYER. IN ALL SUCH CASES
APPROVAL OF CONSTRUCTED SEWERS WILL NOT BE ISSUED BY THE SEQ SERVICE
PROVIDER UNLESS CERTIFICATES ARE PRODUCED CERTIFYING THAT THE REQUIRED
COMPACTION HAS BEEN ACHIEVED.
10. WHERE SEWERS HAVE A GRADE OF 1 IN 20 OR STEEPER, BULKHEADS SHALL BE
CONSTRUCTED IN ACCORDANCE WITH THE SEQ SEWER CODE.
. THE CONTRACTOR SHALL VERIFY THE LOCATION AND DEPTH OF EXISTING
SERVICES WITH RELEVANT AUTHORITIES BEFORE COMMENCING WORKS.
12. SEWERS SHALL BE DISUSED /ABANDONED IN ACCORDANCE WITH PROCEDURES SET
OUT IN THE SEQ SEWER CODE.
13. BENCH MARK AND LEVELS TO AHD.
14. EXISTING ALLOTMENTS REQUIRING A PROPERTY CONNECTION
FROM EXISTING SEWERS SHALL BE PROVIDED BY THE SEQ
SERVICE PROVIDER AT THE DEVELOPERS COST.
ENVIRONMENTAL CONDITIONS:
PLACE ON YOUR DRAWING NOTES AS RECEIVED IN YOUR APPROVAL LETTER FROM
THE ENVIRONMENTAL REGULATOR OR MANAGER. IF NOTES RELEVANT TO THIS
ESTATE ARE NOT SPECIFIED IN YOUR APPROVAL LETTER, TYPICAL NOTES AS
FOLLOWS SHALL BE PLACED ON ALL DRAWINGS.
VEGETATION PROTECTION :
A. TREES LOCATED ALONG THE FOOTPATH SHALL BE, TRANSPLANTED PRIOR 10
CONSTRUCTION, OR REPLACED IF DESTROYED.
B. WHEN WORKING WITHIN 4m OF TREES, RUBBER OR HARDWOOD GIRDLES SHALL
BE CONSTRUCTED WITH 1.8m BATTENS CLOSELY SPACED AND ARRANGED
VERTICALLY FROM GROUND LEVEL. GIRDLES SHALL BE STRAPPED TO TREES PRIOR
TO CONSTRUCTION AND REMAIN UNTIL COMPLETION.
C. TREE ROOTS SHALL BE TUNNELLED UNDER, RATHER THAN SEVERED. IF ROOTS
ARE SEVERED THE DAMAGED AREA SHALL BE TREATED WITH A SUITABLE
FUNGICIDE. CONTACT RELEVANT COUNCIL ARBORIST FOR FURTHER ADVICE.
D. ANY TREE LOPPING REQUIRED SHOULD BE UNDERTAKEN BY AN APPROVED
ARBORIST.
SOIL:
. TOPSOIL AND SUBSOIL SHALL BE STOCKPILED SEPARATELY.
. CARE SHALL BE TAKEN TO PREVENT SEDIMENT FROM ENTERING THE
STORMWATER SYSTEM. THIS MAY INVOLVE PLACING APPROPRIATE SEDIMENT
CONTROLS AROUND STOCKPILES.
C. ACID SULPHATE SOILS EXIST IN THE WORKS AREA. THE OUTPUTS FROM THE
RISK ASSESSMENT BASED ON THE QUEENSLAND ACID SULPHATE SOIL TECHNICAL
MANUAL REQUIRES THAT ACID SULPHATE SOILS BE MANAGED AS FOLLOWS:
(DELETE IF NO ACID SULPHATE SOILS)
o>
CREEK CROSSINGS :
A. SILTATION CONTROL MEASURES SHALL BE PLACED DOWNSTREAM OF ANY
EXCAVATION WORK.
B. APPROPRIATE SEDIMENT CONTROLS SHALL BE USED TO PREVENT SEDIMENT
FROM ENTERING THE CREEK.
C. NO SOIL SHALL BE STOCKPILED WITHIN Sm OF THE CREEK.
4:25 VERTICAL
SCALE AS SHOWN JOB DESCRIPTION DRAWING TITLE
APPROVED NEIL McKENZIE & ASSOCIATES PTY. LTD. mana NOOSA YOUNGCARE SEWERAGE LONGITUDINAL SECTION
CONSULTING ENGINEERS CHECKED NN 32 VIEWLAND DRIVE
MIE. AUST, R.P.E.Q. 2097, N.P.ER. 3 Othe TONE, ono —— ~ car NOOSA HEADS SING
| ao Se aw Ne oe eee i ORR Oo PHONE: (07) 3862 1888 oa aah DELUCA DEVELOPMENT & CONSTRUCTION J sunaes Q20-004-C04 NUMBER
Page 5
SW [OCR of page images] VIEWLAND — DRIVE sw sw Sw sw sw sw 6w) sw sw sw sw SW Sw sw sw sw sw SW sw sw SW SW 7 ae BUILDING PLATFORM RL 75.15 wy | x EX 79.85 PL 75.55 FSL 75.70 PL 75,15 iT | | FSL 75.30 FOREST 10 BE RETAINED BUILDING PLATFORM RL 74.85 BUILDING PLATFORM RL 74.85 CUT AREA 25 Ba 4s 4h. A D es EXISTING RETAINING WALL GENERAL NOTES: 1. ALL DIMENSIONS ARE T0 BE CHECKED ON-SITE BEFORE WORK COMMENCES, 2. DIMENSIONS SHALL NOT BE OBTAINED BY SCALING THE DRAWING, 3. DURING CONSTRUCTION BARRIERS, LIGHTS & SIGNS SHALL BE MAINTAINED TO ENSURE SAFE PASSAGE OF TRAFFIC AND PEDESTRIANS IN ACCORDANCE WITH THE REQUIREMENTS OF THE LOCAL AUTHORITY. 4. ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH S.A.A. CODES & BY-LAWS AND ORDINANCES OF THE RELEVANT LOCAL AUTHORITY AND WORKPLACE HEALTH AND SAFETY REQUIREMENTS, 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL RELEVANT AUTHORITIES AND PAYING ALL FEES NECESSARY BEFORE COMMENCING WORK, FOR LOCATING ALL EXISTING SERVIVES AND FOR REPAIR OF ANY SERVICES DAMAGED AS A RESULT OF THE WORKS. 6. THE CLIENTS SURVEYOR SHALL PEG PIT LOCATIONS AND STAKE R.P. BOUNDARIES PRIOR 10 CONSTRUCTION. 7. FOOTPATHS AND PRIVATE PROPERTY SHALL BE REINSTATED TO THEIR ORIGINAL CONDITION. 8. CONTRACTOR TO VERIFY ALL INVERT LEVELS, SURFACE LEVELS, COVER OVER DRAINAGE LINES, AND MINIMUM FALLS ARE CORRECT & OBTAINBLE PRIOR 70 COMMENCEMENT OF WORK. 9. THE CONTRACTOR'S ATTENTION IS DRAWN 10 THE REQUIREMENTS OF THE WORKPLACE HEALTH AND SAFETY ACT 1989. ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THIS ACT AND IN PARTICULAR THE CONTRACTOR IS TO ENSURE THE REQUIREMENTS OF THE SPECIFICATION WITH REGARD TO "NOTIFICATION IN RELATION TO A NOTIFIABLE PROJECT” ARE FULFILLED. EXCAVATION. MANAGEMENT_NOTES: 1. THE LOCATION OF CUT TO BE EXPORTED FROM THE SITE SHALL BE AS INDICATED BY THE LEVELS ON THESE DESIGN DRAWINGS. 2. THE CONTRACTOR SHALL ALSO ADVISE THE ENGINEER OF THE PROPOSED HAUL ROUTE TO BE TAKEN BY ANY TRUCKS REMOVING EXCAVATED MATERIAL FROM THE PROPOSED DEVELOPMENT SITE. 3. IT IS THE PRINCIPAL CONTRACTOR'S RESPONSIBILITY T0 ENSURE THAT NO CUT MATERIAL IS DEPOSITED ONTO THE ROADS USED BY REMOVAL TRUCKS. ANY MATERIAL DEPOSITED ONTO ROADWAYS SHALL BE CLEANED AS NECESSARY TO AVOID CAUSING NUISANCE TO VEHICLE TRAFFIC. 4. ANY VEHICLE EXITING THE DEVELOPMENT SITE SHALL BE WASHED DOWN PRIOR TO EXITING SITE TO ENSURE NO MATERIAL IS DEPOSITED ONTO ROADWAYS. 5. EXCAVATION WORKS WITHIN THE SITE SHALL ONLY TAKE PLACE BETWEEN THE HOURS OF;- 7.00am — 6.00pm MONDAY TO FRIDAY 7.00am — 12.00noon SATURDAY (NO EXCATION WORKS ON SUNDAY). UNLESS OTHERWISE AUTHORISED BY LOCAL AUTHORITIES. FILL_ MANAGEMENT NOTES: 1, THE LOCATION OF FILL TO BE IMPORTED ONTO THE SITE SHALL BE AS INDICATED BY THE LEVELS ON THESE DESIGN DRAWINGS. 2. THE QUALITY OF FILL SHALL MEET THE REQUIREMENTS OUTLINED IN THE SITE PREPARATION SPECIFICATIONS WHICH ARE INCORPORATED INTO THE NEIL MCKENZIE & ASSOCIATES DESIGN DRAWINGS AND SPECIFICATIONS FOR THIS DEVELOPMENT. 3. AT THE PRE-START MEETING THE CONTRACTOR SHALL ADVISE THE EINGINEER OF THE PROPOSED SOURCE OF IMPORTED FILL TO BE BROUGHT ONTO THE DEVELOPMENT SITE AND PROVIDE ANY CERTIFICATION FROM THE SUPPLIER GEOTECHNICAL CONSULTANT. 4. THE CONTRACTOR SHALL ALSO ADVISE THE ENGINEER OF THE PROPOSED HAUL ROUTE 10 BE TAKEN BY ANY TRUCKS DELIVERING FILL TO THE PROPOSED DEVELOPMENT SITE. 5. IT IS THE PRINCIPAL CONTRACTOR'S RESPONSIBILITY T0 ENSURE THAT NO FILL MATERIAL IS DEPOSITED ONTO THE ROADS USED BY DELIVERY TRUCKS. ANY MATERIAL DEPOSITED ONTO ROADWAYS SHALL BE CLEANED AS NECESSARY TO AVOID CAUSING NUISANCE 10 VEHICLE TRAFFIC. 6. ANY VEHICLE EXITING THE DEVELOPMENT SITE SHALL BE WASHED DOWN PRIOR TO EXITING SITE TO ENSURE NO MATERIAL IS DEPOSITED ONTO ROADWAYS. 7. FILL SHALL BE PLACED AS TO NOT CAUSE NUISANCE OR PONDING TO ADJOINING PROPERTIES. 8. FILLING WORKS WITHIN THE SITE SHALL ONLY TAKE PLACE BETWEEN THE HOURS OF;— 7.00am — 6.00pm MONDAY TO FRIDAY 7.00am — 12.00noon SATURDAY (NO FILLING WORKS ON SUNDAY). UNLESS OTHERWISE AUTHORISED BY LOCAL AUTHORITIES. EARTHWORKS PROCEDURES: 1. CLEARING, STRIPPING AND GRUBBING SHOULD BE CARRIED QUT IN AREAS SUBJECT TO EARTHWORKS. ALSO ALL SOILS CONTAINING ORGANIC MATTER SHOULD BE STRIPPED FROM THE CONSTRUCTION AREA. THIS MATERIAL IS NOT CONSIDERED SUITABLE FOR USE AS STRUCTURAL FILL. 2. THE TOP 300 OF EXISTING SOIL IS TO BE CUT UNDER ALL PAVEMENTS & BUILDING PLATFORMS & REPLACED WITH IMPORTED COMPACTED FILL AS SPECIFIED-MIN CBR 15. 3. DEPRESSIONS FORMED BY REMOVAL OF VEGETATION, UNDERGROUND ELEMENTS ETC. SHOULD HAVE ALL DISTURBED WEAKENED SOUL CLEANED OUT AND BE BACKFILLED WITH COMPACTED SELECT MATERIAL. THIS IS OF PARTICULAR IMPORTANCE FOLLOWING THE REMOVAL OF ANY EXISTING STRUCTURES AND FOUNDATIONS. 4. AFTER CLEARING, GRUBBING, REMOVAL OF EXISTING CONCRETE FOUNDATIONS, AND STRIPPING, THE EXPOSED SURFACE IN THE CONSTRUCTION AREAS, SHOULD BE PROOF ROLLED TO DETECT ANY SOFT OR LOOSE MATERIAL. WEAK SOILS ARE 10 BE REMOVED. 9. THE INSITU SOILS, WHERE FREE OF ORGANIC AND DELETERIOUS MATERIAL, MAY BE USED FOR STRUCTURAL FILL PROVIDED THE MOISTURE CONTENT OF THE SOILS ON PLACEMENT APPROXIMATES THE OPTIMUM. HOWEVER, IT SHOULD BE NOTED THAT PLASTIC CLAY SOILS COULD BE EXPECTED TO PRESENT DIFFICULTIES IN HANDLING, PLACEMENT AND COMPACTION IF THE APPROPRIATE MOISTURE CONTENT IS NOT BE ACHIEVED, PARTICULARLY IF THE CLAYS ARE OVERLY MOIST. 6. IMPORTED FILL MUST HAVE A SOAKED CBR OF NOT LESS THAT 15% AND A MAXIMUM AGGREGATE SIZE OF NOT GREATER THAN 75mm, MAX. LIQUID LIMIT = 40 MAX. P.l. = 15, MAX. Pll. x % PASSING 425um = 450. 7, GUIDELINES FOR MINIMUM RELATIVE COMPACTION VALUES FOR INSITU SOIL FILL AND IMPORTED FILL FOR THE BUILDING AND PAVEMENTS ARE PRESENTED IN THE TABLE BELOW. MINIMUM DRY LOCATION DENSITY RATIO (% BUILDING PLATFORMS & PAVEMENTS 98 % (std) NOTE: THE RECOMMENDED COMPACTIONS ARE PERCENTAGES OF THE MAXIMUM DRY DENSITY DETERMINED BY AS 1289. 8. FIELD DENSITY TESTING SHOULD BE CARRIED OUT TO CHECK THE STANDARD OF COMPACTION ACHIEVED AND THE PLACEMENT MOISTURE CONTENT. THE FREQUENCY AND EXTENT OF TESTING SHOULD BE AS PER GUIDELINES IN AS 3798-1996. 9. BACKFILLING FOR SERVICE TRENCHES, ETC SHOULD USE GOOD QUALITY MATERIAL FREE OF ORGANIC MATERIAL. THE BACKFILL SHOULD BE PLACED IN UNIFORM LAYERS NOT EXCEEDING 200mm THICKNESS, LOOSELY PLACED. THE BACKFILL MATERIAL SHOULD BE COMPACTED 10 SPECIFICATIONS OUTLINED ABOVE FOR INSITU OR IMPORTED MATERIAL. BENCHING OF BATTERED EXCAVATIONS SHOULD BE UNDERTAKEN WHEN BACKFILLING. 10. BACKFILLING FOR SERVICE TRENCHES UNDER ROADWAYS SHALL BE WITH A QUALITY MATERIAL OF NOT LESS THAN CBR 15% (SOAKED) TO THE UNDERSIDE OF PAVEMENT, COMPACTED AT OPTIMUM MOISTURE CONTENT TO ACHIEVE 98% MODIFIED COMPACTION. 11. FILL UNDER BUILDING PLATFORMS TO CONTROLLED FILL PLACED IN ACCORDANCE WITH AS3798 & AS2870. 12. FILL NOT UNDER BUILDING PLATFORMS OR ROAD PAVEMENTS TO BE COMPACTED IN LAYERS NOT EXCEEDING 300MM & 90% MODIFIED MAXIMUM DRY DENSITY IN ACCORDANCE WITH AS1289. EXISTING SERVICES EXISTING SERVICES MAY OR MAY NOT BE SHOWN ON THESE DRAWINGS, NO RESPONSIBILITY IS TAKEN BY THE ENGINEER OR THE PRINCIPAL FOR THIS INFORMATION. THE CONTRACTOR SHALL ASCERTAIN THE POSITION OF ALL UNDERGROUND SERVICES PRIOR TO EXCAVATION AND SHALL BE RESPONSIBLE FOR THE COST OF REPAIRS 10 DAMAGES CAUSED AS A RESULT OF THE WORKS. NOTE : IT IS THE BUILDER RESIPONSIBILITY TO CHECK AND ENSURE ALL LEVELS AND SET OUT DIMENSIONS ARE CORRECT PRIOR TO COMMENCING ANY WORKS. NO RESPONSIBILITY IS TAKEN FOR ERROR OR OMISSIONS ON THIS DRAWING. THIS DRAWING TO BE READ IN CONJUNCTION WITH THE ARCHITECTURAL DRAWINGS. — — + — _ PROPERTY BOUNDARY LINE © — EXISTING POWER POLE CUT VOLUME — 650 m° (APPROX.) FILL VOLUME — 640 m° (APPROX.) 7 ——————_ POSTING TELSTRA LINE CD EXISTING TELSTRA PIT w—————__ EXISTING WATER MAIN - EXISTING TREE TO RETAINED “iqg —————~~ BASING CONTOUR UNE (0.25m INTERVALS) PROPOSED RETANNG WALL FILL. AREA (| PROPOSED STORMWATER PIT APPROVED SCALE 1:125 JOB DESCRIPTION DRAWING TITLE ——— NEIL McKENZIE & ASSOCIATES PTY. LTD. NOOSA YOUNGCARE DRAWN nl EARTHWORKS PLAN C 29.01.21 dL CONSULTING ENGINEERS CHECKED NM 32 VIEWLAND DRIVE B 2.021 | a VIE-AST. RPEQ 200, NER 14/699a SANDGATE ROAD DESIGNED NM NOOSA HEADS A 18.11.20 a THIS DRAWING REVAINS THE PROPERTY oF PHONE: (67) 3862. 1886 APPROVED NM CLIENT DRAWING REVISION No. REVISION DATE DWN NEIL McKENZIE & ASSOCIATES © Copyright FAX: . (07) 3862 1397 DATE OCT. 20 DELUCA DEVELOPMENT & CONSTRUCTION NUMBER Q?0-004-C05 NUMBER C
Page 6
BOUNDARY LINE
BOUNDARY LINE
|
| | PROPOSED BUILDING PROPOSED BUILDING |
| —— FILL |
rs a = = = = [WS ee Ty yg mace RS UT SEK NGL. BUILDING PLATFORM RL. 74.85 |
——— = SEER | RE |
a su CTE f OOO OOOO LOR |
M8 yy Soa | SECTION ACA LASEK }
| —r—eeen :
|
SITE STRUCTURAL RETAINING
WALL
PROPOSED BUILDING PROPOSED DRIVEWAY \ PROPOSED BUILDING wl
FOREST TO BE RETAINED —— S|
80 4 TITZ cur Z |
76.00 --- Y S|
. ee SLD SDSA TD. N.G.L. a |
ne - = = = = | Z YZ VA, BUILOING PLATFORM’ RL i / | YL, VL, s, 7. + _-ByONG PLAIEORM 817485, [
in
ns) BE DDT !
no B® TT=Z SECTION B-B |
|
|
SCALE 1:100 JOB DESCRIPTION DRAWING TITLE
APPROVED NEIL McKENZIE & ASSOCIATES PTY. LTD. fiawt-2 NOOSA YOUNGCARE EARTHWORKS SECTIONS
CONSULTING ENGINEERS CHECKED NM 32 VIEWLAND DRIVE
A 7.01.21 aL MIE. AUST, R.P.E.Q. 2097, N.P.ER. 3 Othe NE, pono —— ~ ata NOOSA HEADS TAG
| moon WET Ow | NEL MCKENGIE a ASSOCIATES GG) Goppight PON (On) Sas? Nese aE ah DELUCA DEVELOPMENT & CONSTRUCTION | suwazr Q20-004-C06 Nuwera A
Page 7
SW
[OCR of page images]
7000
6000 5600 500 6000 500 6000 \_ 6700 6700 6700 CONTINUE PARKING BAY LINE
Sy MARKING TO UNITY WATER DRIVEWAY
2 PARKING SPACES AVAILABLE SS
REDUCED LENGTH AS VEHICLE N
w w w CAN DRIVE DIRECTLY INTO PARK LINE MARKING Sy \
wW. W. Ww. Ww: W Ww. Wi Ww. w: Ww. Ww: Ww. W: W. W: Ww. Ws Ww. Ww: W. w Ww. W: w. Ww. Ws Nw Ww. W Ww. W W. W: w Ww: W w
FOOTPATH CONNECTION —> \ .
| ae _ ee Y Y\ ey gi [>> ON cone oan
a an a : NO_PARKING 4 f= x
Ss sto a st — sn — st —Jow — oe — st — 0 — BL ow QL sv oy ay ow a a LG oy a ae ae ew | ee ee a ae ew ew IN
/ . = \ 4 «i ‘ + N a 5 — sv — sw — sw —— sw —— sw ——sw — sf —— sw —— sy ——
\ wy ve NP 4h py yf ev el vv
| \ © V4 ° DEMOLISH EXISTING CROSSOVER | Cv Y ue 7 7 \ 7
\ \ SHOWN DASHED —1 < \ /
~ aT — pa T . 1 t : 1 ; T 1 - T , T ; 1 - T ; 1 ; 7 ; 1 - 7 : T 2 . | . w a w w w w w w w: w w w w \. w: w w 7 w
\ . | | / NN :
| I" / \
— "> 3 ao TT qt ——.—_ _.__. Kr — =A ee ee. Sao el nie
* | REMOVE NO PARKING SIGNAGE REMOVE NO PARKING SIGNAGE \ \
| ‘ & DELIVER TO COUNCIL / & DELIVER TO COUNCIL \ . \\ |
| | N \ NO
—!'— CONSTRUCT NEW CROSSOVER —“4 —~
| | TO NOOSA COUNCIL REQUIREMENTS oN \ * ‘\ |
| | \ . 1 NI
| | ~S NI
| | | \ \ wb EN
| | : \. |
: so
| | PROPOSED DRIVEWAY \ \
Py | \ ip
By \ |
vile L_ =- | \ | ‘
N \ |
N
\
N 7 |
SL ~ \ | ly N
\
| I- SL ot ‘ \ x | | :
| | | \ \ 7 | |
| f | \\ TOT \ PROPOSED BUILDING | KM |
| \ \\ / Vly
| | \\ | \ / ! | |
| | \ \ J Y | |
Le ~ ! ‘ ( iL
__ \ \ \
yt ) 2 ! \ / A
3 N SJ :
2 | ! \ | \ / |
& | PROPOSED BUILDING | N | \ | |
| 2 | | we | \. y / i |
= \ XS :
| ly \ \ | > | |
| : TS | \ x I |
| | TT \ J
| | ‘, | \ / I |
2000
NOTE
STREET PARKING BAY LAYOUT PLAN PRE DEVELOPMENT DISTANCE TO NEXT CROSSOVER
IS 87 METRES DUE TO WIDENED ENTRANCE. THE
AVAILABLE SPACES WILL BE 13 WITH A POTENTIAL
— —— PROPERTY BOUNDARY LINE LOSS OF 1 PARKING SPACE.
T T —— EXISTING TELSTRA LINE
W Vv EXISTING WATER MAIN
|
2 a ——
- = | _ > EXISTING CONTOUR LINE (1.0m INTERVALS)
z |{z b e\\ |
= 2 a = | EXISTING POWER POLE
Ss a = z
S VEWLAND DRIVE ! CD EXISTING TELSTRA PIT
a
| x PROPOSED 450 x 450 FIELD INLET
4,
“yp |
® | B= PROPOSED 600 x 600 SPEL FILTER BASKET
° AS PER MANUF. SPEC.
LOCALITY PLAN
SCALE 1:5000
APPROVED SCALE 1:100 JOB DESCRIPTION DRAWING TITLE
AV—V—V NEIL McKENZIE & ASSOCIATES PTY. LTD. DRAWN i NOOSA YOUNGCARE STREET PARKING BAY LAYOUT PLAN
CONSULTING ENGINEERS CHECKED NM 32 VIEWLAND DRIVE
VIE NST. RPEO. 0M7, NEER 3 14/699 SANDGATE ROAD DESIGNED NM NOOSA HEADS
——————— CLAYFIELD, QLD 4011
A 0.2 & THIS DRAWING REMAINS THE PROPERTY OF PHONE: (07) 3862 1886 APPROVED NM CLIENT DRAWING REVISION
No. REVISION DATE DWN NEIL McKENZIE & ASSOCIATES © Copyright FAX: (07) 3862 1397 DATE OCT. 20 DELUCA DEVELOPMENT & CONSTRUCTION NUMBER Q20-004-C07 NUMBER A