Original source · versioned page text
2019-09-16 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 16 SEPTEMBER 2019
4. The proposal is contrary to Schedule 3 of the Coastal Protection and
Management Regulation 2017 as certification that the completed works comply
with the requirements of the regulation has not been provided.
5. The proposal is contrary to Performance Outcomes P03 and P09 of the
Waterways Works Code of the draft New Noosa Plan whereby all commercial
activities for a jetty are to be confined to the commercial lease areas of the
respective commercial operation.
B. Advise the applicant that the structure must be modified to comply with the
Development Permit for Operational Works (OPW17/015) and approved plans within
6 months.
C. Write to the Department of Natural Resources, Mines and Energy and request that the
Department review the current commercial operations of Jetty 180 to ensure
compliance with the current lease conditions.
D. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
For: Crs Glasgow and Jackson
Against: Crs Jurisevic, Pardon, Stockwell, Wellington and Wilkie
Lost.
Committee Recommendation
Moved: Cr Stockwell
Seconded: Cr Wellington
That Council note the report by the Coordinator Planning to the Planning & Environment
Committee Meeting dated 10 September 2019 regarding Application No. OPW17/0150.01 to
make a minor change to an existing approval for extension to an existing jetty situated at
Jetty 180 Gympie Terrace, Noosaville and
A. Refuse the change for the following reasons:
1. The proposed works do not represent a minor change to the development
approval because the change results in a substantially different development as
it extends the use beyond the boundary of the lease and therefore results in the
application applying to a new parcel of land.
2. The proposed works will result in a commercial activity outside the existing
commercial lease area and have the potential to increase the overall scale and
intensity of commercial operations contrary to the following provisions of the
Noosaville Locality Code:
(i) Overall Outcome 11.7.2(hh) as it will not protect the Noosa River and
foreshores from the cumulative impacts of development;
(ii) Specific Outcome O27(d) and (f), O28 and O29;
3. The proposed development is contrary to Specific Outcome O5 (a) and (b) of the
Waterway Works Code as the works are contained outside the boundaries of the
existing lot and the berthing of vessels encroaches over the boundaries of the
lot.
4. The proposal is contrary to Schedule 3 of the Coastal Protection and
Management Regulation 2017 as certification that the completed works comply
with the requirements of the regulation has not been provided.
Page 2 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.