Stormwater Management Report
Attached to the e-mail Ind Bus Type 2, Reconfigure a Lot (Access Easements) & Op Works (Comm site investigation report, Vehicle access & Stormwater Mgmt) - MCU18/0120, RAL18/0013 & OPW18/0197 .msg.
8.3 Maintenance
Access to the proposed bio-retention basin may be gained from the internal hardstand area. A recommended
maintenance schedule for water quality treatment train is outlined in Table 4 below:
Table 4 - Treatment Train Maintenance Shcedule
Device Task Labour Plant Min. Max Failure Mode
Frequency Frequency
per Annum
Bio-retention Inspection Maintenance - 12 - Grass
Areas staff (1 exceeds
person) 300mm in
height.
Mowing Maintenance Whipper 12 As required Ponding in
staff (1 snipper/Mower excess of
person) 24hrs.
Accumulation
Cleaning Maintenance Shovel & 4 As required of sediment or
staff (2 Truck gross
persons) pollutants
Outlet Inspection Maintenance - 4 As required Excessive
staff (1 During rainfall ponding.
person) events. Downstream
scouring.
Rectification Environmental As required Discoloured
Consultant discharge.
Unacceptable
odurs.
9 STORMWATER MANAGEMENT DURING CONSTRUCTION
Stormwater Quantity
• The stormwater disposal system shall be installed as soon as is practicable to allow for good and
safe work environment practice.
Stormwater Quality
• Rubbish and the suspended solids will be adequately catered for by the erosion and sediment
control plan.
• Oils and greases by volume from plant and equipment will be removed by the contractor and
disposed in a satisfactory manner as specified by the EPA.
• Nutrients (ie fertilises etc will only be applied at the rates as specified by the manufacturers for the
specified use.
HR DESIGN Reference No: 18-0165A Page 9 of 14