Stormwater Management Report
Attached to the e-mail Ind Bus Type 2, Reconfigure a Lot (Access Easements) & Op Works (Comm site investigation report, Vehicle access & Stormwater Mgmt) - MCU18/0120, RAL18/0013 & OPW18/0197 .msg.
7 STORMWATER QUANTITY MANAGEMENT
7.1 Discharge Goals
The following goals are to be achieved as part of the management of stormwater quantity:
• The quantity of storm discharged from the site is to have non-worsening effect on the existing stormwater
system.
7.2 Legal Point of Discharge
The legal point of discharge for this site is the existing drainage infrastructure located in the south-west corner of the
allotment. This infrastructure includes a 525∅ RCP discharging directly into the existing drainage easement located
adjacent to the western and southern boundaries.
Figure 2 - Legal Point of Discharge (source NSC mapping)
HR DESIGN Reference No: 18-0165A Page 5 of 14