Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Stormwater Management Report

Attached to the e-mail Ind Bus Type 2, Reconfigure a Lot (Access Easements) & Op Works (Comm site investigation report, Vehicle access & Stormwater Mgmt) - MCU18/0120, RAL18/0013 & OPW18/0197 .msg.

of 15

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

7    STORMWATER QUANTITY MANAGEMENT

7.1 Discharge Goals

The following goals are to be achieved as part of the management of stormwater quantity:

    •   The quantity of storm discharged from the site is to have non-worsening effect on the existing stormwater
        system.


7.2 Legal Point of Discharge

The legal point of discharge for this site is the existing drainage infrastructure located in the south-west corner of the
allotment. This infrastructure includes a 525∅ RCP discharging directly into the existing drainage easement located
adjacent to the western and southern boundaries.




                                   Figure 2 - Legal Point of Discharge (source NSC mapping)




HR DESIGN                                           Reference No: 18-0165A                                      Page 5 of 14
Log in to download the original file

Stormwater Management Report.pdf · 685 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.