Skip to the record
The only place to find full transcripts.

Original source · versioned page text

PM Submission - Hans Stolz - 132008.176.05

of 1

Page text shows just the words. Original shows the document exactly as it was published.

Subject: Submission Ref. Development Application 132008.176.05
From: HKS
Date: 2023-08-09T02:16:11+00:00
To: Mailbox Council Mail

You don't often get email from [email protected]. Learn why this is important<https://aka.ms/LearnAboutSenderIdentification>
CAUTION: This email originated outside of Council. Do not open links or attachments if the email is unexpected or unusual.


TO
The application Officer
NGNORTON

From
Hans Stolz
8/2 Serenity Close
Noosa Heads, 4567
mob. 0407 672 673
email: [email protected]


We have read the Development application for the proposed resort complex and shops by Calile Malouf Investments and herewith wish to object to the development in its current format.
Our objection is mainly based on the lack of consideration of road infrastructure servicing the proposed Resort and the relevant traffic report submitted by the developer.

The main points are;

  *   Traffic volume estimates are base on low volume off season observations, considering the amount of units proposed, the staff numbers, casual visitors and service staff Grant Street is certainly unsuitable and insufficient for the traffic load.
  *   No consideration is given to pedestrians traffic with Grant Street not even having a suitable footpath. No consideration is given to wheelchair, prams and walking frames. As is, it is a major challenge to safely use Grant Street access for pedestrians.
  *   No consideration is given to bicycle traffic at all despite the plan boasting of 124 bicycle racks in the complex. There is no dedicated bicycle lane on Grant Street and the street is too narrow with on street parking. Riding along Grant Street is a dangerous activity at best of times. It is only a matter of time until someone gets seriously insured.
  *   Using Banksia Avenue North as an alternative bicycle path or footpath can not be considered as it is too steep for safe cycling or even walking other than the fit and daring.
  *   Parking for trades vehicles during the construction period will be a major issue, off site parking as previously arranged at the AFL ground would have to be arranged.

We have total trust in the Noosa Shire council to address these issues in a manner considering safety of visitors and residence.

Regards

Hans Stolz
Log in to download the original file

PM Submission - Hans Stolz - 132008.176.05.msg · 91 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.