Original source · versioned page text
2022-03-30 Special Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
SPECIAL MEETING AGENDA 30 MARCH 2022
The key feedback themes from the inaugural consultation process are outlined in the table below.
Table 4: Key Budget Consultation Feedback Themes from 2021/22 Budget
Feedback Topic Summary of Outcomes and Snapshot of Related Actions Underway During 2021/22
• Tourism and Economic Levy still abolished for the 2021/22 budget.
Concerns over • Funding for Tourism Noosa and Council’s economic development activities now firmly
Proposed Abolition of committed as base budget funding through the General Rate.
the Tourism and • Development of a Destination Management Plan underway.
Economic Levy • A full review of rates and changes, including the effectiveness of this change, to occur as part
of the 2022/23 budget.
Establishment of the • New Transitory Accommodation General Rating Category still introduced for the 2021/22
Transitory budget.
Accommodation • A full review of rates and changes, including the effectiveness of this change, to occur as part
General Rating of the 2022/23 budget.
Category
• A new waste strategy currently being developed which will identify a range of actions and
Improved Waste
investment required to optimise the effectiveness of waste management operations, increase
Management
diversion and recovery of waste as well as reduce landfill emissions.
Practices
• Major landfill cell upgrade capital works underway at the Eumundi Road landfill site.
• Environment Levy increased, and part returned to pre-COVID levels ($64).
• Levy price to be reviewed again with the 2022/23 budget.
• Additional budget funding for Zero Emissions initiatives (both in original budget initiatives and
budget review 2 during the year).
Additional Investment
• CHAP finalisation and development of a Climate Change Response Plan.
in Environment and
• Development of a Coastal Reserve Management Plan underway.
Sustainability
• Bushfire Resilience Levy introduced.
• New grant funding (SEQCSP) from State Government invested in continued bushland
reserves rehabilitation and management.
• Shoreline Erosion Management Plan (SEMP) works
• Transport Levy returned to pre-COVID levels.
• Levy price to be reviewed again with the 2022/23 budget.
• A number of initiatives included in the capital works program including:
Progression of
o Walking and Cycling strategy works
Sustainable Transport
o Noosa Heads Bus Station Options Analysis
Outcomes
o Noosa Drive Reef Hotel to Noosa Parade transport corridor planning
o Noosa Parade upgrade construction underway
• Commencement of a year-round free weekend bus trial (BR2)
• Heritage Levy part-returned to pre-COVID levels ($8.50)
Additional Investment
• Price to be reviewed again with the 2022/23 budget.
in Heritage Protection
and Preservation • A full program of heritage initiatives being delivered for the 2021/22 year, including the
Activities heritage portal, heritage register review, heritage conservation management plan and
continuation of the Noosa notables program.
• Record $48.1 million capital works program underway for 2021/22, including significant
renewal and upgrade works for existing assets.
Additional Investment
• Continuation of condition assessment program for key road, bridge and stormwater
in Maintaining
infrastructure.
Infrastructure
• Finalisation of updated Asset Management Plans underway, as well as initiatives to improve
whole of life asset management.
In line with the motions adopted at the special meeting on 2021/22 budget consultation outcomes, a
review has been undertaken on the public consultation process, and identified the following three
priority improvement areas to address for the 2022/23 budget and onward:
Page 7 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.