Officer: 	Conor Neville
Direct Telephone: 	07 53296287
Our Reference:	141999.982589.1  : JELDER
Your Reference:	12506
19 June 2019
Laguna on Hastings CTS 28082
32 Hastings Steet
NOOSA  QLD  4567
[email protected]
Dear Sir/Madam,
Decision Notice – Minor Change
Planning Act 2016
I refer to your application received on 14 February 2019, requesting a minor change to an existing development approval. Council decided your requested changes.
Details of the decision are as follows:
APPLICATION details
Application No:	141999.982589.1
Street address:	32 Hastings St Noosa Heads Qld 4567
Real property description:	Lot 15 N 21848
Planning Scheme:	The Noosa Plan (8 June 2018)
Decision details
The following type of approval was issued on 17 September 1999. (16102 DB)
Development Permit for Operational Works - Landscaping
In relation to the request to make a minor change to the existing approval, Council on 17 June 2019, decided to approve the requested changes. The changes are detailed below.
A.	Approve the change.
B.	Include additional conditions 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15 and 16.
C.	Include advisory notes 1 and 2.
currency period of approval
Not applicable.
assessment manager conditions
1.	Landscaping shall be carried out in accordance with the approved plans.
2.	Approved plans are numbered LWD-01G, 02G, 03H, 10F, 11F and 12F prepared by Belt Collins Australia and dated March 1999 and the associated Plant Schedule numbered BCA and dated 8 September, 1999.
3.	Landscaping works are only permitted during the hours of 7.00am to 6.00pm Monday to Saturday. No work is permitted on public holidays.
Additional Conditions 17 June 2019
LANDSCAPE CONDITIONS
Plans and Documents
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
2		Landscape Plan by Noosashapes (Sheldon)	4/6/19
3		Landscape Plan by Noosashapes (Sheldon)	4/6/19
PRIOR TO COMMENCEMENT OF WORKS
A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must specifically address the following:
Traffic Management during all aspects of the construct phase including:
A Traffic Management Control Plan in accordance with Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction
Maintenance of safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased
Proposed fencing to the site during the construction phase of the development
Adequate parking arrangements for construction workers
Bonds
A site control and/or compliance bond of $2000 is to be submitted to Council prior to the pre-start meeting. The pre-start meeting will only be held once Council's Construction Engineering Officer has confirmation that the bond monies have been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance with these conditions or any additional inspections incurred for substandard work or work undertaken not in accordance with this permit.
A prestart meeting must be organised with Council’s delegate by calling 5329 6500 (giving at least five business days’ notice). The prestart meeting must be attended by the responsible persons for:
Landscape works.
Other relevant parties.
DURING CONSTRUCTION
General
Where damage occurs to any Council asset as a result of the development works, it must be repaired immediately where it creates a hazard that presents risk to person or property. Other damage must be repaired prior to completion of works.
All works must be constructed and work procedure undertaken in accordance with:
The approved plans/documents and conditions detailed in this Decision Notice.
All relevant Council Planning Scheme Policies, standard drawings, standard specifications and guidelines.
Retention of Existing Trees and Vegetation
All trees identified for retention must be protected in accordance with AS 4970, Protection of trees on development sites.
A qualified arborist must be engaged for the duration of the tree removal works located 	along the pathway between Bella Cassa and Sebel.
All pedestrian safety regulations must be in place prior to and maintained for the entire period during the removal of the trees
The existing group of Michellia figo located along the pathway between Bella Cassa and Sebel must be retained and protected during construction wherever achievable.
Landscaping Works
Landscape works must be supervised, undertaken and certified by qualified persons*.  All works must be completed in accordance with this Decision Notice.
(* Refer to Advisory Note)
Where damage occurs to any Council asset as a result of the development works, it mu	be repaired immediately where it creates a hazard that presents risk to person or property. Other damage must be repaired prior to completion of works.
Landscape works must:
Ensure mulch is aged, comprised of leaf and limb material of varying sizes, free of 	foreign matter including anthropogenic waste, rock, soil/sediment contamination and is  	applied to all planting areas to ensure a minimum 100mm depth once settled.
All the new plantings of the large screening shrubs along the pathway between Bella Cassa and Sebel must be maintained at a natural height of 3-4 metres and at no time be trimmed or hedged any lower than 3 metres.
Soil for landscaping must:
Provide for healthy and sustained site specific vegetation performance.
Comply with AS 4419, Soils for landscaping and garden use.
Landscaping certification.Pandanus tree certification that retained or transplanted specimens are free of flatid or leafhopper (Jamella australiae).
FOLLOWING CONSTRUCTION
Supervision/Certification
Prior to requesting the release of the bonds upon completion of the works, the following (prepared by respective qualified persons* and certifying compliance with approvals) must be submitted to Council:
Landscaping certification confirming all works have been constructed in accordance with conditions of approval.
(* Refer to Advisory Note)
referral agencies
Not applicable.

advisory notes
17 June 2019
Qualified Person
Qualified Person, for the purpose of:
Supervising landscape works and preparing a landscape certification, is considered to be a landscape architect, landscape designer or horticulturist with a minimum of three years current experience in the field of landscape design.
Undertaking landscape construction and establishment works is considered to be a person with five years current experience in commercial landscape construction projects.
Undertaking, supervising tree works and preparing arboriculture certification, is considered to be a person with a minimum three years current experience in tree protection, hazard identification/mitigation and Specifying Trees – a guide to assessment of tree quality (NATSPEC) assessment and either:
International Society of Arboriculture (ISA) certification; or
A Diploma of Arboriculture.
Landscape Works
The applicant must pay the re-inspection fee in accordance with Council's Fees and Charges Register where:
An inspection revealed that any constructed landscape works do not comply with the conditions of the Decision Notice, Approved Plans and or Approved Documents.
Certification is submitted to Council falsely stating that works comply with the approved plans, documents and or conditions of the Decision Notice.
property notes
Not applicable.
variation approval details
Not applicable.
further development permits required
Not applicable.
submissions
Not applicable.
rights of appeal
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given.
other details
If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices.

Yours faithfully,

Conor Neville
Ecologist

Enc:	Appeal Rights
Approved Plans/Documents
cc.	Unitywater

DECISION NOTICE HISTORY
Original Decision Notice – 141999.982589 (16102 DB) – 17 September 1999
Decision Notice - Minor  - 141999.982589.1 – 17 June 2019 - include additional conditions 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15 and 16.

	Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017

Chapter 6 Dispute resolution
Part 1 Appeal rights
229 Appeals to tribunal or P&E Court
(1)	Schedule 1 of the Planning Act 2016 states –
(a)	Matters that may be appealed to –
(i)	either a tribunal or the P&E Court; or
(ii)	only a tribunal; or
(iii)	only the P&E Court; and
(b)	The person-
(i)	who may appeal a matter (the appellant); and
(ii)	who is a respondent in an appeal of the matter; and
(iii)	who is a co-respondent in an appeal of the matter; and
(iv)	who may elect to be a co-respondent in an appeal of the matter.
(2)	An appellant may start an appeal within the appeal period.
(3)	The appeal period is –
(a)	for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or
(b)	for an appeal against a deemed refusal – at any time after the deemed refusal happens; or
(c)	for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or
(d)	for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or
(e)	for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or
(f)	for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person.
Note –
See the P&E Court Act for the court’s power to extend the appeal period.
(4)	Each respondent and co-respondent for an appeal may be heard in the appeal.
(5)	If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal.
(6)	To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about-
(a)	the adopted charge itself; or
(b)	for a decision about an offset or refund-
(i)	the establishment cost of trunk infrastructure identified in a LGIP; or
(ii)	the cost of infrastructure decided using the method included in the local government’s charges resolution.
230 Notice of appeal
(1)	An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that-
(a)	is in the approved form; and
(b)	succinctly states the grounds of the appeal.
(2)	The notice of appeal must be accompanied by the required fee.
(3)	The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to –
(a)	the respondent for the appeal; and
(b)	each co-respondent for the appeal; and
(c)	for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and
(d)	for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and
(e)	each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and
(f)	for an appeal to the P&E Court – the chief executive; and
(g)	for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate.
(4)	The service period is –
(a)	if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or
(b)	otherwise – 10 business days after the appeal is started.
(5)	A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6).
(6)	A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person.
231 Other appeals
(1)	Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable.
(2)	The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error.
(3)	A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter.
(4)	In this section –
decision includes-
(a)	conduct engaged in for the purpose of making a decision; and
(b)	other conduct that relates to the making of a decision; and
(c)	the making of a decision or failure to make a decision; and
(d)	a purported decision; and
(e)	a deemed refusal.
non-appealable, for a decision or matter, means the decision or matter-
(a)	is final and conclusive; and
(b)	may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and
(c)	is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground.
232 Rules of the P&E Court
(1)	A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal.
(2)	However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court

[word/footer2.xml]
Page 6 of 6

[word/footer3.xml]
PO Box 141		P. (07) 5329 6500	[email protected]	
	TEWANTIN  QLD  4565	F. (07) 5329 6501	www.noosa.qld.gov.au
				Page 1 of 6

[word/footer4.xml]
Page 2 of 3

[word/header4.xml]
3

[Attachment: image3.png (image text)]
ee) NOOSA COUNCIL
Log in to download the original file

Minor Change Existing Approval 141999.982589.1.docx · 334 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.