Original source · versioned page text
2020-09-08 Planning & Environment Committee Agenda
The original of this document is very large (13.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 8 SEPTEMBER 2020
Building and Effluent Envelope (Lot 2)
5. The applicant must prepare a metes and bounds building and effluent envelope plan
indicating a House site area and effluent disposal area for Lot 2. The areas must be in
accordance with the Approved Plan. The plans must be submitted in both hardcopy
and digital format (dwg) on GDA 94 zone 56 coordinates. The applicant must submit
the plans to Council for approval prior to the endorsement of the Plan of Survey.
6. The future dwelling on Lot 2 must be sited and constructed in accordance with the
approved building and effluent envelope shown on the Approved Plans. A copy of the
approved plan of development must be included in the contract of sale for Lot 2,
together with a clause which requires the future dwelling to be constructed in
accordance with it.
ENGINEERING
Property Access and Driveways
7. A residential driveway must be constructed to Lot 2. The works must be undertaken in
conjunction with any subsequent building approval and the access must be:
a. generally in accordance with Council’s standard drawing RS-056 and any
associated addendum, and
b. located in that part of the frontage above the 0.05%AEP level.
8. A residential driveway must be constructed to Lot 1. The works must be undertaken in
conjunction with any subsequent building approval and the access must be generally
in accordance with Council’s standard drawing RS-056 and any associated addendum
Stormwater Drainage
9. Stormwater runoff from the development must be disposed of on-site without causing
scour or damage to the subject site or any adjoining property.
Electricity and Telecommunication Services
10. Electricity and telecommunication services must be provided to each lot in accordance
with the standards and requirements of the relevant service provider.
11. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
12. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and all
applicable legislation at the time of construction.
Damage to Services and Assets
13. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
a. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
Page 14 of 154
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.