PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 8 SEPTEMBER 2020
The following image identifies the site in the Peregian Beach village:
Figure 1: Locality plan
2. BACKGROUND
The Peregian Beach village includes a variety of shops, restaurants and offices for residents and
visitors to the area all orientated around a village green or square. Peregian Beach village includes
no on-site parking with development in the village reliant on street car parking.
TPC 269
On 22 February 1972, Council approved five Shops on the subject site. The development
comprised a standard block type building with 100% site coverage. The use of the building since
has been for the purpose of a convenience store.
MCU11/0266
On 7 June 2012, Council approved a Development Permit for a Material Change of Use
(Commercial Business Type 1 Office, Entertainment and dining Business Type 1 Food & Beverage
& Retail Business Type 2 Shop & Salon).
The approved structure comprises a two-storey building with a mixed restaurant & shop on the
ground floor, and office tenancies on the first floor. The approval allowed for a plot ratio of 1.71:1
which is in excess of the 0.8:1 required by the Noosa Plan 2006 current at the time.
A roof top terrace was also approved for the use of tenants only, with no access permitted to the
public. A condition of approval was included specifically prohibiting the use of the roof terrace for
any restaurant or shop use.
A copy of the approved plans is provided as Attachment 1.
On 6 April 2016, Council approved an extension to the currency period granting an additional
currency period of 4 years. Therefore the development approval lapses if the use has not happened
by 5 June 2020.
Page 36 of 154
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.