PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 8 SEPTEMBER 2020
Plan No. Rev. Plan/Document Name Date
DD1.10 D Roof Plan Block 8 prepared by Sparks 08-06-2017
Architects
DD1.12 E First Floor Plan Block 9 prepared by Sparks 08-06-2017
Architects
DD1.13 D Roof Plan Block 9 prepared by Sparks 08-06-2017
Architects
WD2.1 B Elevations prepared by Sparks Architects 23-08-2017
WD2.2 B North Elevations Block 7 prepared by Sparks 23-08-2017
Architects
WD2.3 B East Elevations Block 7 prepared by Sparks 23-08-2017
Architects
WD2.4 B South Elevations Block 7 prepared by Sparks 23-08-2017
Architects
WD2.5 L West Elevations Block 7 prepared by Sparks 10-05-2019
Architects
WD2.6 B Elevations Block 8 prepared by Sparks 23-08-2017
Architects
WD2.7 B Elevations Block 9 prepared by Sparks 23-08-2017
Architects
DD3.1 D Sections Block 7 prepared by Sparks 08-06-2017
Architects
DD3.2 B Section Block 7 prepared by Sparks Architects 08-06-2017
DD3.3 D Section Block 8 prepared by Sparks Architects 08-06-2017
DD3.4 D Section Block 9 prepared by Sparks Architects 08-06-2017
DD4.1 G 3D prepared by Sparks Architects 08-06-2017
DD4.2 G 3D prepared by Sparks Architects 08-06-2017
DD4.3 G 3D prepared by Sparks Architects 08-06-2017
DD4.4 G 3D prepared by Sparks Architects 08-06-2017
DD4.5 G 3D prepared by Sparks Architects 08-06-2017
DD4.6 G 3D prepared by Sparks Architects 08-06-2017
DD4.7 G 3D prepared by Sparks Architects 08-06-2017
5622_A01-10_E E CTS 400 Site Plan – Level 1 prepared by JANUARY
Blackburne Jackson Design
7088_A01-21_B B CTS 100 Site Plan – Level 1 prepared by 03-10-17
Blackburne Jackson Design
7088_A01-31_B B CTS 300 Site Plan – Level 1 prepared by 03-10-17
Blackburne Jackson Design
5622_A02- W Facilities Building Level 1 – Floor Plan Dec 2018
01_W prepared by Blackburne Jackson Design
5622_A02-02_K K Facilities Building – Level 2 Roof Plan Dec 2018
prepared by Blackburne Jackson Design
7088_A02-30_G G Block 15 Basement Level – Floor Plan 31-08-2018
prepared by Blackburne Jackson Design
7088_A02-31_H H Block 15 Level 1 – Floor Plan prepared by 02-10-2018
Blackburne Jackson Design
7088_A02-32_H H Block 15 Level 2 – Floor Plan prepared by 02-10-2018
Blackburne Jackson Design
Page 5 of 154
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.