Original source · versioned page text
2020-09-08 Planning & Environment Committee Agenda
The original of this document is very large (13.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Page 99 of 154
PROPOSED REFURBISHMENT OF BISTRO C AND LANDSCAPE DESIGN - SHEET 4
LANDSCAPE INTENT AND SPECIFICATIONS TYPICAL NATSPEC PLANTING DETAIL
The proposed landscape garden areas are located in an exposed coastal beachfront environment. The proposed trees are to comply with the NATSPEC specifications and to be planted and staked as shown in this detail.
The natural landscape character for this area is coastal plant species that will endure exposure from wind
and salt spray. The exposure, combined with low fertility of the sand and its inability to hold moisture,
present difficult conditions for plants and considerable care is needed in plant selection.
The recommended plant species characterise a typical coastal/beachfront area and will achieve an overall Tasks: sTaxt a2EsrOR A
landscaped effect. An appropriate dense rate of coastal planting has been introduced to provide a thicker ‘eae asia
In time the prostrate plant growth will cover the exposed mulch areas and assist im stabilising the area. — t ae 4
This outlook will improve the visual amenity from the boardwalk area and a clear line of sight for patrons : oy oy. i At wna tad uu ReATRD. vas TOU VERT a teename ety
inurl pasion hau bane inanapanniod that ave hallor sulted tothe tenn enninenssant nad thesafoen bane a a6 alienate aeveeeseenes| i
lower maintenance requirements. » P< eek a STAKES VERTICALLY OAYERINSD }
The mulched areas will provide a better growing environment for plants, suppress weeds and retain water. 63M if Pouvrnam tc amr OM EOUTALENT srcone Se nn oneme 8
‘ GRENE, SICUREDLOCUELY TO UAE Bi 8 FIRURE EIT LOOP STAKE HECHT 70 8 ACTOANCED TREE
ORGANIC MULCH will consist of hoop pine curls and should be spread over the planted area at a depth tr ; Soria yc" OF Te Yau st Tou PoP OPER Sean roeten
of 100mm and be kept 50mm from stems of plants to avoid collar rot. TS Po “BM ee > —-
HY f || /~ Eiitireposmonter txncorn bower tenon
PEBBLE AGGREGATE as detailed on Sheet 1 will be spread to a depth of 50mm. “5 f Mauna OF ROOTS HEAVY SCHL, CREATE FLARED SIE WALL — pase
/ BACIE AL VETH FRIABLE IMPORTED GARDEN G1 END SOR MRED AIFER IPO SET
PLANTS # / VOTH EXISTING STE OL ON (0). RE TEENTSISR OFAN =e \Z— TREE TH
2) Are ordered well in advance to ensure availability of required numbers and sizes; i UGLY TERSE OUT ROOTS WHEN PLANTING , op? AND GUDGUNES:
b) Plants are well-formed, hardened-off stock, well-branched & foliated, true to type: / Sa SMULGH - Tare TO 1 Gore MOVIL COMPOSTED ORGANIC MILO (——_—— TREE OUTING WY [nee WEN
c) The root system is sturdily established in container with no large roots extending and not root bound; e= —. — = ROOTBALL MALCH NOT TORE IN COMTACT WITHOLANT STEM rSnuariony oma
d) Form & habit are normal for species scheduled & pruning scars to be clean cut; a ‘a = ae f 3 Chace jrescoeven te oxcamey Te eRTENe TOCA artes al
oaakent ne aeiestoenieedseel Geto any disease or physical injury: 5 d $s i Soren wry ren sna unens NECeMMEnOAEne = ‘< nie a
g) Containers are free of weeds; and . 2H ' eae TED SITE S0k: MND NECTED BOK, REFER SPECRCATIONS ‘ aon —__*
h) Alll plants are delivered to site clearly & accurately labeled. Containers to be 4 \ Ue, \ woes eRe Je
maintained on site until planted. eS a ee fA rerouton gh hy
One agri-form fertiliser tablet or a slow release fertiliser must be added to each new plant along with rain ¢ DaveTER CF Woxe 33 > aurea na
crystals. ates ISTARES
- fc TYPICAL DETAIL - ADVANCED TREE (> TYPICAL PLAN - POSITIONING + GUYING
TREE PROTECTION (REFER TO ARBORIST BRIEF BY TREESAFE AUSTRALIA, REF: KLA 860, JULY 2018 Ore sore (2) Rg 888
All trees identified for protection/retaining are great specimen plants and exhibit few hazards at the time of Se
= :
inspection.
The landscape areas have been designed around the existing Pandanus species.
If tree protection measures are followed long term sustainability of these plants will be achieved.
Site modifications will alter environmental conditions and tree maintenance will depend on the way the
remaining trees adapt to these changes. This highlights the need to follow tree protection strategies that
wil reduce this impact and which should be provided by a qualified arborist prior to the construction of the
proposed retaining walls.
Any pruning works shall be undertaken in consultation with or by the project Arborist and carned out in
accordance with AS 4373- Pruning of Amenity Trees.
NOTE:
Sandy Soils - Mix 10 grams or one teaspoon of water crystals to 10 litres of water or 1 bucket of sol
mixed well and added as back fill around the plant. Thoroughly water immediately after planting to
remove air, settle soil around roots and to activate water crystals. Deep watering encourages strong -
deep root growth and is preferred to more regular shallow watering. eo
in
MAINTENANCE: - .
Watering should be carried out on a daily basis for three days after planting followed by twice weekly for Picture:
two weeks and then as required according to rainfall, weather conditions and nature of the soil. Casuarina equisetifolia - She-oak
All necessary weeding, watering and pruning should be undertaken to ensure healthy growth. Continue
pruning as necessary for maintenance of sight lines and shaping of plants. 7
A3 month maintenance period will be required to prevent soils drying out See a NING PROJECT DRAWING TITLE:
Prncipal: Mark Bozell ee nant ann sos Be: c DWG No. LDO¢
The drainage of the landscaped garden areas are to be caried out as part of the building constuction Sonat Costemn 4878 Cb I, eee eee Be 5 onoo
aspect project. ‘ NOOSA HEADS QLD Are FEBRUARY
Email: [email protected]
New lights will be designed by others. All planning and provision of electricity cables and conduits, if COPYRIGHT: sucton CUENT: 8ISTROCPTYLTD
applicable, will have to be provided prior to any construction of new retaining walls, timber decks and ores rang may be uvieronen wba he L&C BANKS EEE 40F4
paving. ‘express written permission of the author. DESIGNER, MB SCALE- N/A
Page 99 of 154See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.