1.0 GENERAL NOTES
General       1. The following notes shall be read in conjunction with all design documents, schedules & specifications including but not limited to architectural,              Wet area                1 All shower floors to fall to drain wastes without the occurrence of ponding;
              structural and services drawings and specifications, and any Principal's project requirements documents relating to this project.                                  floors                  2 Wet Area Tiles to finish flush with adjoining floor finishes;
              2. All work shall comply with ncc/ relevant authority requirements and australian standards (as.) Codes for Trades                                                                         3 Clear anodised aluminium angle (or similar Water Stop) to tiles at all doorways;
              3. Do not scale off these drawings.                                                                                                                                                        4 Wet Area Membranes – extent and type to AS 3740.
              4. Contractor shall verify all dimensions on site.                                                                                                                                         5 FWG's to be installed as per Architectural drawings & manufacturer's specifications.
              5. Contractor shall report any discrepancy in the documents to the architect for clarificationprior to the affected work proceeding.
                                                                                                                                                                                 Falls, thresholds       1 Flush set thresholds throughout, details to be approved by architects;
              6. Builder to confirm setout with architect prior to construction
                                                                                                                                                                                 & setdowns              2 Ensure adequate falls are achieved away from door openings on external slabs for water diversion.
              7. All levels are to Australian height datum (ahd) UNO.
              8. All materials and fittings to be fixed in strict accordance with the manufacturers current specification and recommendation                                     External Walls          All timber members to be termite resistant, with timber treated to the appropriate hazard level as specified in AS1604.
              9. Expansion, control or construction joints for all materials/systems to be provided in accordance with Manufacturer's instructions. Locations of
                                                                                                                                                                                 Internal walls          1 90mm MGP 12 timber framing or steel stud frame TBA or as otherwise noted on the Structural Engineering Drawings;
              joints to be confirmed on site with architect prior to installation.
                                                                                                                                                                                                         2 Note: Confirm requirement (if any) for additional noggins for fittings & fixtures (e.g. accessories, wall mounted televisions,etc) in each room
              10. Refer to Surveyor's drawings check survey and detail drawing to locate and confirm all existing services, pipes poles, embankments, pits and like
                                                                                                                                                                                                         with Architect / Interior Designer prior to sheeting
              prior to commencing any work;
              11. Refer to civil Engineer dwgs for existing and new water, drainage design and associated site works design and detail. Refer to civil Engineer and              Ceilings & Soffits      All timber members to be termite resistant, with timber treated to the appropriate hazard level as specified in AS1604
              landscape dwgs for all roadway, paving, surface, surfaced finished Surface levels;
              12. Refer window schedule and/or facade Engineer details for all glass, frame types and finishes etc.                                                              Roof structure          Timber and Steel framing to Structural Engineer's design and specification.
              13. All dimensions to be verified prior to preparation of shop drawings and commencement of construction;                                                                                  Supply and install a complete insulated roofing system, weatherproof and bird proof roofing, siding and roof plumbing
              14. Refer to elevations and/or facade Engineer drawings for further finishes and panel setout information - Confirm with architect prior to                                                installation complete with accessories as shown and detailed on the architectural drawings including but not limited to the
              manufacture and/or installation.                                                                                                                                                           following:-
              15. All silicon sealant to be colour matched to adjacent surface UNO.                                                                                                                      1 Site cranage & scaffolding;
              16. Moisture resistant linings to wet 'areas' in accordance to NCC.                                                                                                                        2 Roof openings – services, vents and mechanical services;
                                                                                                                                                                                                         3 Roof expansion joints;
Termites      Provide physical barrier (Termimesh or equal) to penetrations and perimeter. Installation to be:                                                                                           4 Ridge & barge capping as detailed on the Architectural drawings;
              1. Accordance with manufactures specification, and NCC.                                                                                                                                    5 Flashings / copings, including all flashing and weatherproofing around supports to the roof penetrations;
              2. Provide termite management plan to architect for records prior to installation.                                                                                                         6 Hail / leaf guards;
              3. Provide copy of installation certificate for records after completion                                                                                                                   7 Door & window head flashing;
Drainage      1. Installation to be in accordance with the water supply & sewerage act amendments.                                                                               2.0 UNDERGROUND SERVICES
              2. Roofwater drainage to connect existing stormwater system. Refer to Hydraulic Engineer;
                                                                                                                                                                                                         The identification and location of all underground services is the responsibility of the owner. Prior to any demolition, excavation or
              3. Installation to be in accordance with local Authority's requirements. Confirm prior to installation.
                                                                                                                                                                                                         construction on the site, the relevant authority should be contacted for confirmation of location and depth of services. Dial before you dig
Structure     1. Structure all structural works including but not limited to site classification, footings, framing, bracing & tie down to be in accordance with                                         search has not been undertaken. Blackwood accept no responsibility for the accuracy of information suppiled by service providers or
              Structural Engineers design. Structural Engineer to inspect and certify structural works and provide certification in accordance with local authority                                      inaccuracy shown on this drawing. The Contractor & Owner to locate any required underground services
              requirements.
                                                                                                                                                                                 3.0 LEGEND                                                                            INS                   Insulation
              2. Refer Geotechnical Engineers Report / Documentation for all earthworks, footing, slab, articulation joints to brickwork and retaining wall details.
                                                                                                                                                                                 AWN                    Folded metal awning - Colorbond Dune                           J.##                  Joinery Type #
Smoke         1. Installation of smoke alarms to be in accordance with BCA/NCC.                                                                                                  BAL#                   Balustrade Number                                              M                     Shower mixer
alarms        2. Positions of smoke alarms to be confirmed with architect prior to installation.                                                                                 BAL01                  PC Aluminium 30 x 30 SHS vertical batten balustrade with       MV                    Mechanical room ventilator
                                                                                                                                                                                                        flat bar top and bottom rail to detail - Colorbond Dune        NGL                   Natural Ground Line - Refer to Natural Ground Survey
Windows       1. Refer to Materials & Finishes schedule for window & door frame finish / type;
                                                                                                                                                                                 BAL02                  PC Aluminium 50 x 10 vertical batten balustrade with flat      ORG                   Overflow relief gully
and Doors     2. All aluminium frames to be installed to the manufacturers' specifications and details for particular cyclone wind terrain category. Certification is
                                                                                                                                                                                                        bar top and bottom rail to detail - Resene Rice Cake           ORS                   Open Riser stair
              required for compliance with wind pressures and waterproofing for the locale.
                                                                                                                                                                                 BFC                    Broom Finish Concrete Slab                                     P#                    Post/ column.
              3. Sizes are nominal opening sizes only and openings are to be measured on site prior to manufacture. Any discrepancies to be brought to the
                                                                                                                                                                                 BHD                    Bulkhead.                                                      PB                    10mm Plasterboard with paint finish - Resene Rice Cake
              attention of Blackwood at that time.
                                                                                                                                                                                 BRR                    Floor Bearer                                                   PV#                   Concrete Pavers, lightly exposed agregate
              4. All operational, opening and locking hardware and door and window furniture to be provided by the sub-contractor and approved by Blackwood.
                                                                                                                                                                                 COS                    Clear out to surface                                           R                     Tiled recess in tiled wall - Refer joinery detail
              Hardware and Keying as scheduled.
                                                                                                                                                                                 CLG                    Ceiling - Refer Reflected Ceiling Plan.                        RBW1                  Rendered blockwork. White
              5. All hinges to be stainless steel.
                                                                                                                                                                                 EA.CONC                Exposed agregate concrete                                      RS1                   Colorbond Dune Spandek Roof Sheeting
              6. All openable windows to be pre-hung in frames with hardware and locks provided. No manufacturers' logos or stickers on any part of window or
                                                                                                                                                                                 D.#                    Door Number. Refer Door Schedule.                              S                     Sink
              door panels.
                                                                                                                                                                                 DP                     Square Downpipe - Paint Finish - Colorbond Dune                SE#                   Shot Edge hardwood timber decking
              7. Glazing nominated in the schedule must exceed System U-value: 6.7Ð/m2K or less and System SHGC: 0.57 or less. Confirm selection with                                                                                                                  SC                    Structural Column Concealed within wall
                                                                                                                                                                                 DR                     Clothes dryer. Refer to Appliance Schedule.
              Blackwood.                                                                                                                                                                                                                                               SCRN1                 To detail. PC Aluminium 50 x 10 vertical batten balustrade
                                                                                                                                                                                 FC1                    JH Axon Cladding - Paint Finish. Resene Rice Cake
              8. All windows & doors to accept Insect screens UNO.                                                                                                                                                                                                                           with flat bar top and bottom rail to detail -Colorbond Dune
                                                                                                                                                                                 FENCE1                 1200H PC Aluminium 50 x 10 vertical batten balustrade
              9. Ensure window and door head heights are consistent as dimensioned in the schedule from finished floor level. Adjust sill height on site to suit                                                                                                       SHH                   Shower Head
                                                                                                                                                                                                        with flat bar top and bottom rail to detail -Colorbond Dune
              frame size.                                                                                                                                                                                                                                              SWD                   Stormwater dropper
                                                                                                                                                                                 FG                     Fixed glass- refer to Window Schedule.
              10. Where metal screens are specified, use aluminium screens to comply with AS3959-2009 BAL29.                                                                                                                                                           SWID                  Stormwater inspection pit
                                                                                                                                                                                 FL                     Flashing
              11. All door hardware to be fixed at 1050mm a.f.f.l. UNO. Refer door schedule for door/frame details and size.                                                                                                                                           T#                    Tiles- refer to Specification
                                                                                                                                                                                 FLJ                    Floor Joist
              12. All glazing to comply with current versions of as 1288 and as 2047;                                                                                            FSC                    Fascia                                                         T&G#                  Tongue & Groove Hardwood Flooring
              13. Shop Drawings: Provide Shop Drawings showing the following information where appropriate to the items:                                                         FWG                    Floor Waste Gully                                              AXON                  Abodo Vulcan Hector Cladding - Patina Finish
                 a. Layout (sectional plan and elevation of complete assembly.                                                                                                   G#                     Gate & number - refer to door schedule.                        TL04                  Brick tiles - select finish
                 b. Full size section of members                                                                                                                                 GATES                  PC Aluminium 30 x 30 SHS vertical batten balustrade with       TRF                   Turf
                 c. Methods of assembly, type and location of exposed screws.                                                                                                                           flat bar top and bottom rail to detail - Colorbond Dune        TOW                   Top of Wall
                 d. Methods of glazing.                                                                                                                                          GU                     Custom heavy gauge folded metal gutter. Colorbond Dune         TS#                   Timber screen
                 e. Methods of installation, including fixings, anchorage, chalking, flashings.                                                                                  GD                     Drain with SS grate                                            WC                    Toilet
                 f. Provision for expansion (thermal).                                                                                                                           HC                     Hose Cock                                                      WM                    Washing Machine
                 g. Junctions and trim to adjoining surfaces.                                                                                                                    HR                     Handrail                                                       PBWA                  Plasterboard wet area
                                                                                                                                                                                 HWU#                   Hot water unit                                                 WPM                   Waterproof membrane
Footings      Footings type to Structural Engineer's design & specification. Specific to each site and soil condition TBA
                                                                                                                                                                                                                                                                       W.#.##                Window Number
Floor         1 All timber members to be treated for protection from weathering;               4 Timber and Steel framed to Structural Engineer's Design                         5.0 CONSULTANTS
structure     and
                                                                                                                                                                                 Surveyor:               Townplanner            Civil Engineer          Landscape Architect      Building Certifier:    Structural Engineer: Hydraulic Engineer:
              2 All exposed hardwood members to be Appearance Grade/Class 01/02;               Specification
              3 All timber members are to be termite resistant;                                5 Bulk insulation below floor: R value for energy rating -                        Mike Campbell           Jack Lewis             Mark Poynter            John Visser              John Dunn              Sean Richardson      Kim Hoang
              wool batts between joists or similar approved.                                                                                                                     Noosa Cooloola          Pivotal Perspective    Recor                   Element Design           JDBA                   SCG Engineers        BDW Hydraulics
                                                                                                                                                                                 Land Surveys            0406 334 227           07 5211 1003            07 5444 6155             1300 596 371           07 5455 5604         07 3876 0088
                                                                                                                                                                                 0412 603 286
F O R          C O N S T R U C T I O N
Rev   Date       Description
                                                                                                                    B L A C K                                                         Project:                                     Drawing Title:                                             Project No.            Drawn By              Drawing No.
                                                             Use     figured    dimensions     in
                                                             preference to scale. All dimensions
                                                                                                                                                  Contact information:
A
B
      21/10/2022 Prelim. Detailed Design - WIP Review
      22/11/2022 For Pricing
                                                             to be varified and checked on site.
                                                             These        designs,      drawings,
                                                                                                                                                  PO Box 781 Tewantin Q 4565          PROPOSED DUPLEX                              GENERAL NOTES                                              202217                 PT                    BA1.02
                                                                                                                                                  Architect Registration # 5386 QLD
                                                                                                                                                                                      For Capital Prudential
                                                                                                                    W O O D
                                                             specifications and the copyright
C     07/12/2022 Door/Window amendments + pricing issue thereof are the property of                                                               Ph: 0416 037 424
D     16/01/2023 Final pricing issue & for Building Approval Blackwood     and must not be used,
                                                                                                                                                  [email protected]     6 Wyandra Street, Noosa Heads, QLD 4567      Scale                                                      Date                   Project Stage         Revision
                                                             retained or copied without the
E     08/03/2023 CONSTRUCTION ISSUE                          written authority of Blackwood.      a r c h i t e c t u r e   &   d e s i g n       www.blackwoodarchitecture.com.au                                                  @ A3                                                      6/06/2023              BA                    E
Log in to download the original file

202217 Wyandra Duplex BA REVE - Reference Change Markers.pdf · 3.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.