Skip to the record
For the highest quality transcripts.

Original source · versioned page text

IDAS Forms - OPW14.0226

of 12

Page text read automatically using OCR, there may be inaccuracies

 

Table B
@) What is the nature of the operational work? (Tick ail applicable boxes.)

["] Road works [Stormwater ["] Water infrastructure
(]  Draifage works (1 Earthworks ] Sewerage infrastructure
Landscaping C] Signage EL} Clearing vegetation under the Planning scheme

 

[]  Other—provide detaiis |

 

 

b) Is the rational work necessary to facilitate the creation of new lots? (E.g. subdivision.)
No [] Yes—specify the number of lots being created

 

 

c) Are there any current approvals associated with this application? (E,g. material change of use.)
[] No UyVeo_precde details below

 

List of approval reference/s Date approved (dd/mmiyy) Date approval lapses (ddimmiyy)

wit Com - COG

 

 

 

 

 

 

 

 

 

 

 

2. What Is the dollar value of the Proposed bullding work? $
(Inc GST, materials and labour.) } SO ee.

 

 

3. What is the dollar value of the proposed operational work? $
(inc GST, materials and labour.) 3O CCD,

 

 

 

 

Mandatory supporting information

 

 

| 4. Confirm that the following mandatory supporting Information accompanies this application

 

 

 

 

 

Mandatory supporting information Confirmation of | Method of
lodgement lodgement

All applications involving building work or operational work rae

A site plan drawn to an appropriate scale (1:100, 1:200 or 1:500 are kAContirmed

recommended scales) which shows the following:

¢ the location and site area of the land to which the application relates
(relevant land)

¢ the north point

* the doundaries of the relevant land

* tha allotment layout showing existing lots, any proposed lots {including the
dimensions of those lots}, existing or Proposed road reserves, building
envelopes and existing or Proposed open space (note: numbering is
required for all lots)

* any existing or proposed easements on the relevant land and their
function

* any access limitation strips

* all existing and proposed roads and access points on the relevant land.

 

 

 

 

 

{DAS form 6—Building or operational work assessable
against a planning scheme
Version 3.0—i July 2013

Log in to download the original (IDAS Forms - OPW14.0226.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.