Original source · versioned page text
Mixed Use Building - DA Set_041023
Very large file (11.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
RS01 CLD02 AWN01 RS01 GU01
1 2 3 4 5 6
3,070 2,355 6,115 3,875 9,705
+17.603
Highest point of roof
GU01
+16.400
+15.800 AWN01
Window / Door Head FG FG FG FG FG FG FG FG FG FG FG FG FG FG FG
AWN01
CLD02
+13.400
+13.100
Bottom of Slab +12.500 SCN01
BOUNDARY
Bottom of SCN01
DP01
WS
+10.100
Adjacent landscaped mound Bin Enclosure RBW01 WS SCN01 P1 SCN01 DP01 WS P1
North East Elevation
1:100
RS01 CLD02
A B C D E F G
2,090 7,110 5,600 1,700 2,080 790
RS01
+17.603
Highest point of roof
GU01 GU01
+16.400
+15.800 AWN01 AWN01
Window / Door Head FG FG FG FG FG FG FG FG FG
DP01
CLD02
+13.400
+13.100
Bottom of Slab +12.500
Bottom of SCN01
SCN03 DP01
+10.100 BOUNDARY BOUNDARY
Adjacent landscaped mound dotted RBW01 SCN01
South East Elevation
1:100
B L A C K Mixed Use Building
ELEVATIONS
W O O D
DA3.02
Scale Project No. Date Revision For Aaron O’Connor
1:100 @ A3 202315 4/10/2023 G 7 Woodland Drive, Peregian Beach QLD 4563
a r c h i t e c t u r e & d e s i g n
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.