Original source · versioned page text
AS 1428.1-2009 PWD Code
25 AS 1428.1—2009
(i) Ramps and intermediate landings shall have kerbs or kerb rails on both sides
that comply with the following:
(i) The minimum height above the finished floor shall be 65 mm.
(ii) The height of the top of the kerb or kerb rail shall not be within the range
75 mm to 150 mm above the finished floor, as shown in Figure 18.
(iii) There shall be no longitudinal gap or slot greater than 20 mm in the kerb
or kerb rail within the range 75 mm to 150 mm above the finished floor.
NOTES:
A1
1 For details on kerbs and kerb rails, see Figure 18.
2 For location of kerb or kerb rail, see Figure 19.
3 Examples of kerb rail configuration are shown in Appendix A.
(j) Kerbs or kerb rails shall—
(i) be located so that the ramp-side face is either flush with the ramp-side
face of the handrail or no greater than 100 mm away from the ramp-side
face of the handrail, as shown in Figure 19;
(ii) where the handrail is supported on a vertical post, the height of the top
of the kerb or kerb rail shall be not less than 150 mm above the finished
floor, as shown in Figures 19(a), 19(b) or 19(c); and
(iii) where the kerb is at a height of 65 mm to 75 mm, the support posts shall
be set back a minimum of 200 mm from the face of the kerb or kerb rail,
as shown in Figure 19(d).
www.standards.org.au © Standards Australia
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (AS 1428.1-2009 PWD Code.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.