Original source · versioned page text
AS 1428.1-2009 PWD Code
AS 1428.1—2009 50
Handrail Handrail Handrail Handrail Handrail
te r m i n a ti o n te r m i n a ti o n te r m i n a ti o n te r m i n a ti o n te r m i n a ti o n
Handrail Handrail Handrail Handrail Handrail
ex te n s i o n ex te n s i o n ex te n s i o n ex te n s i o n ex te n s i o n
Landing Stair Landing Stair Landing Stair Landing Stair Landing Stair
(a) H a n d r a i l tu r n e d ( b) H a n d r a i l (c) H a n d r a i l (d ) H a n d r a i l tu r n e d (e) H a n d r a i l tu r n e d
t h r o u g h 18 0 ˚ tu r n e d th r o u g h tu r n e d d ow n a n d d ow n t h r o u g h 9 0 ˚ h o r izo n t a l l y t h r o u g h
18 0 ˚ a n d r e tu r n e d b a c k to t h e f l o o r to t h e f l o o r 9 0 ˚ to t h e wa l l
to e n d p o s t at the end post
S i d e e l eva ti o n s
FIGURE 26(C) STAIR HANDRAILS—HANDRAIL TERMINATIONS
Handrail Handrail
termination termination
Handrail Handrail
extension extension Handrail
termination
300 min. 300 min.
Handrail continued Handrail continued
at pitch for horizontal at pitch for horizontal
distance of one tread distance of one tread
865 to
1000
1000
min.
Landing Stair Landing Stair
(a) Plan view (b) Side elevation (c) Front elevation
DIMENSIONS IN MILLIMETRES
FIGURE 26(D) DETAIL FOR HANDRAILS TERMINATED BY TURNING HORIZONTALLY
THROUGH 90° TO THE WALL
© Standards Australia www.standards.org.au
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (AS 1428.1-2009 PWD Code.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.