Delegated Report - Code - Planning MCU24 0022 · MCU24/0022

of 10

Text shows just the words. Original shows the document exactly as it was published.

               The Department is a referral agency pursuant to Schedule 10, Part 4, Division 3, Table 1, Part 1
               ‘Premises contaminated because of unexploded ordnance’
               The Department provided a response that was issued under section 56 of the Planning Act 2016
               on 8 April 2024.
               A copy of the response will be attached to the decision notice.
               4.2. Internal Council Referrals
               Engineering Internal Referral
               Access – The existing access is not in accordance with Council’s standard drawings (RS-049 &
               RS-050) as the driveway is constructed using cellular matting and gravel. There are no previous
               approvals for the crossover. The development will result in the intensification of the use of the
               driveway crossover; therefore, it is considered reasonable and relevant for the driveway crossover
               to upgraded in accordance with Council’s standard drawings (RS-049 & RS-050) and an
               Operational Works approval. No preliminary design has been provided.
               Parking – Sometime between July 2019 and November 2020, unapproved works in the road
               reserve were undertaken which resulted in the extension of the driveway (as a carpark). There are
               no previous approvals for these works. Carparking within the road reserve is not supported and is
               not considered a suitable carpark for the development; therefore, it is considered reasonable and
               relevant that as part of the development, the road reserve is reinstated to match existing verge
               areas in accordance with an Operational Works approval.
               The applicant is proposing tandem car parking to meet the required number of on-site carparks.
               Sufficient space is provided to allow for two carparks in tandem (within Garage & on the driveway).
               Engineering believes that the proposed development can generally achieve compliance with the
               relevant provisions of The Noosa Plan 2020 and has provided recommended conditions.
               5.     CONCLUSION & REASONS FOR DECISION
               The proposed development generally complies with the requirements of the planning scheme and
               does not raise any significant issues that cannot be addressed by reasonable and relevant
               conditions. The application is therefore recommended for approval.
               The report is provided in accordance with Section 63(5) of the Planning Act 2016.




                                                                                                    Page 5 of 10




Document Set ID: 23024819
Version: 6, Version Date: 24/05/2024

Used in these records

About this file

File size
2.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning MCU24 0022.pdf · 2.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.