DILGP - Concurrence agency response With conditions - SDA-1215-026793
Attached to the e-mail MCU15/0111 - Concurrence agency response - with conditions.
SDA-1215-026793
delay construction.
5. Bus stop compliance
To ensure compliance with Condition 3 of this concurrence agency response, the
applicant is requested to provide the detailed design of the bus stop pair to the
TransLink Division of the Department of Transport and Main Roads for endorsement
prior to construction or any works commencing. Please contact the TransLink Division
by phone (07) 3851 8700 or via email at [email protected]’s Public Transport Infrastructure Manual May 2012 is available at:
http://translink.com.au/about-translink/what-we-do/public-transport-planning.
The northbound bus stop should maintain an adequate clearance from the maintenance
access gates for the North Coast Line railway.
6. Stormwater Compliance
The Stormwater Report with detailed stormwater management design should be
submitted to the North Coast District Development Assessment Team of the Department
of Transport and Main Roads for review and endorsement prior to obtaining operational
works approval associated with bulk earthworks, stormwater or drainage is sought or
construction commences.
Please quote the Department of Transport and Main Roads reference number: TMR16-
016077.
The review and endorsement of the stormwater management design, will ensure that the
detention basin and stormwater management system complies with the requirements of
this condition and achieves a “no worsening” outcome.
Department of Infrastructure, Local Government and Planning Page 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.