DILGP - Concurrence agency response With conditions - SDA-1215-026793

Attached to the e-mail MCU15/0111 - Concurrence agency response - with conditions.

of 14

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                        SDA-1215-026793




        delay construction.

5.      Bus stop compliance
        To ensure compliance with Condition 3 of this concurrence agency response, the
        applicant is requested to provide the detailed design of the bus stop pair to the
        TransLink Division of the Department of Transport and Main Roads for endorsement
        prior to construction or any works commencing. Please contact the TransLink Division
        by phone (07) 3851 8700 or via email at [email protected]’s Public Transport Infrastructure Manual May 2012 is available at:
        http://translink.com.au/about-translink/what-we-do/public-transport-planning.

        The northbound bus stop should maintain an adequate clearance from the maintenance
        access gates for the North Coast Line railway.

6.      Stormwater Compliance
        The Stormwater Report with detailed stormwater management design should be
        submitted to the North Coast District Development Assessment Team of the Department
        of Transport and Main Roads for review and endorsement prior to obtaining operational
        works approval associated with bulk earthworks, stormwater or drainage is sought or
        construction commences.
        Please quote the Department of Transport and Main Roads reference number: TMR16-
        016077.
        The review and endorsement of the stormwater management design, will ensure that the
        detention basin and stormwater management system complies with the requirements of
        this condition and achieves a “no worsening” outcome.




Department of Infrastructure, Local Government and Planning                              Page 9
Log in to download the original file

DILGP - Concurrence agency response With conditions - SDA-1215-026793.pdf · 2.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.