Original source · versioned page text
Delegated Report - Code - Planning OPW26 0086 (As Published)
4. ASSESSMENT MANAGER CONDITIONS
APPROVED PLANS
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
- - Locality Plan 1/07/2026
Prepared by Applicant
- - Driveway Plan 1/07/2026
Prepared by Applicant
As Annotated by Council
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 19 August 2028, unless an application to extend the currency period
is approved by Council.
GENERAL CONDITIONS
Engineering
3. A condition report including photographs of the frontage of the site must be completed and
submitted to Council at the prestart meeting.
4. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any subcontractors also have the appropriate insurance and public liability
documentation. Certificates demonstrating currency of public liability insurance and works
insurance covering the works must be submitted to Council prior to the prestart meeting.
5. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Civil engineering works;
6. A Construction Management Plan must be submitted to Council prior to the pre-start meeting
and must specifically address the following:
a. Traffic Management during the construction phase.
b. Appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
Devices (MUTCD)
c. Provision for safe vehicle and pedestrian access across the frontage of the site both.
7. Any changes to the details associated with the Principal Contractor during construction, must
be notified to council in writing within five business days of the change occurring.
8. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
Engineering
9. The integrity and condition of any existing public or Council infrastructure and services
(above ground and/or underground) must not be adversely affected by the proposed works
Page 5 of 9
Document Set ID: 25064511
Version: 2, Version Date: 18/08/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Delegated Report - Code - Planning OPW26 0086 (As Published).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.