Skip to the record
The gold standard in government transparency.

Council archive · source document

PM Submission Object - Stanley & Leonie Quin - MCU18/0019

of 2

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Traffic and access to site

As the main commercial entrance to the site will be via Val Crescent, the proposed development will have a negative
traffic impact on Val Crescent as it will result in a significant increase in vehicles using the street, particularly commercial
vehicles.

The additional traffic generated by the proposal will include commercial vehicles such as delivery trucks, vans and trade
vehicles. 12.5m long heavy rigid vehicles will also need to access the site, as well as refuse collection trucks.

Val Crescent is a quiet local road and is only intended to service residents who live in the street. There are no footpaths
on either side of Val Crescent and the street is used for walking on by the local residents (and also all the people who
currently park in the street to access the hospital). The increased traffic on the street will make this more dangerous,
particularly for the children and the senior citizens.

The site access for commercial vehicles, staff and visitors on Val Cr is inappropriate. It is located near the roundabout and
directly opposite three residential driveways. There will be an increased risk that vehicles and trucks accessing the
proposed site will have an accident with other vehicles, cyclists or pedestrians.

Car parking

The section of Goodchap St near the Noosa Hospital and Val Crescent are already under a lot of strain in terms of car
parking, with them being used as an overflow car park for the hospital's staff, patients and visitors. A 90 bed facility
directly across the road which has up to 35 staff and visitors will exacerbate this problem with more and more people
parking on Goodchap St, Val Crescent and nearby side streets.

While the proposed development will have a basement car park, | believe it will not be sufficient to meet the car parking
needs of the facility at peak times.

Construction

The Val Crescent residents will have to endure the constant noise, dust, machinery operation and trucks of building the
facility for at least 14 to 16 months. This is not the building of a detached house we have to put up with, but a major
construction site directly opposite our homes. This is unreasonable given that we live in a detached housing zone.

Need

Gj

| understand the need for more aged care facilities on the Sunshine Coast, however, they should be located on a more
appropriate site. Val Crescent is not an appropriate site for this development.

Page 2 of 2

Used in these records

About this file

File size
640 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

PM Submission Object - Stanley & Leonie Quin - MCU18_0019.pdf · 640 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.