FINANCIAL PERFORMANCE REPORT OCTOBER 2026, BUDGET REVIEW 1A 2026/27 AND REVISED 2026/27 TO 2035/36 LONG TERM FINANCIAL FORECAST · Attachment 6 - 2026-27 Budget Review 1A and Revised 2026-27 to 2035-36 Long Term Financial Forecast

of 18

Text shows just the words. Original shows the document exactly as it was published.

Attachment 6 - 2026/27 Budget Review 1A and Revised 2026/27 to 2035/36 Long-Term
              Financial Forecast

                 2026/27 BUDGET REVIEW 1A and REVISED 2026/27 to 2035/36
                                      LONG-TERM FINANCIAL FORECAST
Full text of the other 17 pages

Page 2

SCHEDULE 1 - STATEMENT OF INCOME AND EXPENDITURE

                                                   2026/27 Budget Review 1A Financial Statements                                   STATEMENT OF INCOME AND EXPENDITURE
                                                                                                                                                    For the period ending 30 June
                                                                           Budget
                                                     Original    Budget
                                                                           Review                                                                                        Forecast
                                                     Budget     Review 1
                                                                               1A
                                                        2027       2027      2027      2028      2029      2030      2031      2032       2033      2034        2035        2036
Annual Result - Total Council
                                                        $,000      $,000    $,000      $,000     $,000     $,000     $,000     $,000      $,000     $,000       $,000       $,000
Income

Revenue
  Operating Revenue
  Net Rates, Levies and Charges                       113,720    113,970   113,970   122,703   131,452   138,874   146,859   154,718    161,735   168,840     174,858     182,662
  Fees and Charges                                     13,683     13,683    13,683    14,385    14,978    15,520    16,237    16,988     17,603    18,240      18,899      19,583
  Rental Income                                         2,483      2,483     2,483     2,595     2,686     2,766     2,877     2,992      3,082     3,174       3,270       3,368
  Interest Received                                     5,953      6,253     6,253     6,355     5,540     5,387     5,244     5,016      5,129     5,195       5,261       5,420
  Sales Revenue                                        17,852     17,852    17,852    18,767    19,541    20,248    21,184    22,164     22,965    23,796      24,657      25,549
  Unitywater Dividends and Tax Equivalents              3,600      3,600     3,600     3,600     3,600     3,600     3,600     3,600      3,600     3,600       3,600       3,600
  Other Income                                          1,017      1,017     1,017     1,069     1,113     1,153     1,207     1,263      1,308     1,356       1,405       1,455
  Grants, Subsidies, Contributions and Donations        5,268      5,382     5,382     5,558     5,741     5,912     6,131     6,360      6,554     6,756       6,966       7,184
  Total Operating Revenue                             163,577    164,240   164,240   175,032   184,650   193,460   203,339   213,101    221,976   230,958     238,915     248,821
  Capital Revenue
   Government Subsidies and Grants - Capital           42,634     47,839    79,082    31,755    31,148    14,783     2,663     3,455      2,725     1,913       2,766       2,788
   Contributions - Assets and Other Non-Monetary        1,598      1,598     1,598     1,686     1,762     1,832     1,924     2,020      2,101     2,185       2,272       2,363
   Contributions - Monetary                             1,597      1,597     1,597     1,613     1,629     1,645     1,662     1,678      1,695     1,712       1,729       1,747
  Total Capital Revenue                                45,829     51,034    82,277    35,054    34,539    18,260     6,249     7,154      6,521     5,810       6,767       6,897

  Total Revenue                                       209,406    215,275   246,518   210,085   219,189   211,720   209,588   220,255    228,498   236,768     245,683     255,718
  Capital income
  Total Capital Income
Total Income                                          209,406    215,275   246,518   210,085   219,189   211,720   209,588   220,255    228,498   236,768     245,683     255,718
Expenses
  Operating Expenses
  Employee Benefits                                    63,835     63,915    63,915    66,810    69,492    71,598    74,483    77,485     79,833    82,253      84,746      87,315
  Materials and Services                               71,667     72,250    72,250    75,608    79,011    82,171    86,280    90,594     94,218    97,986     101,906     105,982
  Finance Costs                                         2,372      2,372     2,182     2,797     3,389     3,993     4,063     3,951      3,821     3,692       3,563       3,437
  Depreciation and Amortisation                        25,425     25,425    25,425    29,317    32,224    35,135    37,941    40,472     43,500    46,396      48,012      51,389
  Other Expenses                                          235        235       235       248       259       270       283       298        309       322         335         348
  Total Operating Expenses                            163,535    164,198   164,007   174,780   184,376   193,167   203,050   212,800    221,681   230,648     238,561     248,472
  Capital Expenses
  Total Capital Expenses
  Total Expenses                                      163,535    164,198   164,007   174,780   184,376   193,167   203,050   212,800    221,681   230,648     238,561     248,472
Net Result                                             45,871     51,077    82,511    35,305    34,813    18,553     6,537     7,455      6,816     6,120       7,121       7,246

Operating Result

Operating Revenue                                     163,577    164,240   164,240   175,032   184,650   193,460   203,339   213,101    221,976   230,958     238,915     248,821
Operating Expenses                                    163,535    164,198   164,007   174,780   184,376   193,167   203,050   212,800    221,681   230,648     238,561     248,472
Operating Result                                           42         42       234       251       274       293       289       301        295       309         354         349




                                                                                                                                                                                    2

Page 3

SCHEDULE 2 - STATEMENT OF FINANCIAL POSITION

                                     2026/27 Budget Review 1A Financial Statements                                                          STATEMENT OF FINANCIAL POSITION
                                                                                                                                                          For the period ending 30 June
                                        Original     Budget     Budget
                                                                                                                             Forecast
                                        Budget      Review 1 Review 1A
                                          2027         2027        2027        2028        2029        2030        2031           2032        2033        2034        2035        2036
 Annual Result - Total Council
                                          $,000        $,000       $,000       $,000       $,000       $,000       $,000          $,000       $,000       $,000       $,000       $,000
Assets

  Current Assets
  Cash and Cash Equivalents               93,221      118,003     101,991      92,665      89,167      84,950      83,273         88,144      92,039      91,508      97,349     105,989
  Trade and Other Receivables             15,358       15,395      15,395      16,447      17,573      18,498      19,520         20,479      21,431      22,341      23,136      24,067
  Inventories                                241          494         494         494         494         494         494            494         494         494         494         494
  Contract Assets                          3,061        3,061       3,419       3,419       3,419       3,419       3,419          3,419       3,419       3,419       3,419       3,419
  Other Current Assets                     1,447        3,341       1,676       1,676       1,676       1,676       1,676          1,676       1,676       1,676       1,676       1,676
  Non-current assets held for sale
  Total Current Assets                   113,328      140,293     122,975     114,702     112,329     109,037     108,383        114,212     119,059     119,439     126,074     135,645


  Non-Current Assets
  Investments                             162,448      162,607     168,622     168,622     168,622     168,622     168,622        168,622     168,622     168,622     168,622     168,622
  Property, Plant & Equipment           1,565,696    1,455,002   1,386,132   1,475,580   1,561,697   1,624,294   1,670,750      1,713,372   1,757,948   1,808,074   1,855,081   1,901,144
  Other Non-Current Assets                    855          855         605         605         605         605         605            605         605         605         605         605
  Total Non-Current Assets              1,728,999    1,618,464   1,555,359   1,644,808   1,730,924   1,793,521   1,839,977      1,882,600   1,927,175   1,977,302   2,024,309   2,070,371

  Total Assets                          1,842,327    1,758,757   1,678,335   1,759,510   1,843,253   1,902,558   1,948,360      1,996,812   2,046,234   2,096,740   2,150,383   2,206,016

Liabilities

  Current Liabilities
  Trade and Other Payables                11,137       11,217      11,192      11,674      12,206      12,639      13,213         13,777      14,306      14,814      15,341      15,844
  Borrowings                               1,827        1,802       1,686       2,152       2,657       2,873       2,984          3,115       3,214       3,175       3,301       3,443
  Provisions                              13,930        4,632      11,115      11,115      11,115      11,115      11,115         11,115      11,115      11,115      11,115      11,115
  Other Current Liabilities                8,873        8,649       8,646       8,646       8,646       8,646       8,646          8,646       8,646       8,646       8,646       8,646

  Total Current Liabilities               35,768       26,300      32,638      33,586      34,624      35,272      35,958         36,652      37,281      37,750      38,403      39,048


  Non-Current Liabilities
  Contract Liabilities                    14,685       14,685      21,426       21,426      21,426      21,426      21,426         21,426      21,426      21,426      21,426      21,426
  Borrowings                              34,012       33,114      33,351      44,484      55,778      56,526      53,541         50,427      47,212      44,038      40,737      37,294
  Provisions                              23,552       22,803      27,542      27,542      27,542      27,542      27,542         27,542      27,542      27,542      27,542      27,542
  Other Non-Current Liabilities            2,509        2,245       2,245       2,245       2,245       2,245       2,245          2,245       2,245       2,245       2,245       2,245


  Total Non-Current Liabilities           74,758       72,847      84,565      95,698     106,991     107,739     104,755        101,640      98,426      95,251      91,950      88,507

  Total Liabilities                      110,525       99,147     117,203     129,284     141,615     143,011     140,713        138,293     135,707     133,001     130,353     127,555


Net Community Assets                    1,731,803    1,659,611   1,561,132   1,630,226   1,701,638   1,759,547   1,807,647      1,858,519   1,910,528   1,963,739   2,020,030   2,078,462

Community Equity

  Asset Revaluation Surplus               486,056      420,027     301,052     334,841     371,440     410,795     452,358        495,775     540,968     588,060     637,229     688,414
  Retained Surplus                      1,245,746    1,239,584   1,260,080   1,295,385   1,330,198   1,348,752   1,355,289      1,362,744   1,369,560   1,375,680   1,382,801   1,390,048
Total Community Equity                  1,731,803    1,659,611   1,561,132   1,630,226   1,701,638   1,759,547   1,807,647      1,858,519   1,910,528   1,963,740   2,020,030   2,078,462




                                                                                                                                                                                            3

Page 4

SCHEDULE 3 - STATEMENT OF CASHFLOWS

                                                   2026/27 Budget Review 1A Financial Statements                                                           STATEMENT OF CASHFLOWS
                                                                                                                                                                 For the period ending 30 June
                                                      Original     Budget        Budget
                                                                                                                                        Forecast
                                                      Budget      Review 1    Review 1A
                                                        2027         2027         2027       2028       2029       2030       2031          2032       2033         2034      2035       2036
 Annual Result - Total Council
                                                        $,000        $,000        $,000      $,000      $,000      $,000      $,000         $,000      $,000        $,000     $,000      $,000
Cash Flows from Operating Activities
  Receipts from Customers                               145,243     145,940       148,706    155,893    165,982    174,890    184,492       194,200    202,685     211,346    219,048    228,343
  Payments to Suppliers and Employees                  -136,646    -139,215      -141,622   -143,708   -149,754   -155,129   -161,995      -169,336   -175,355    -181,576   -187,983   -194,666
  Dividend Received                                       3,600       3,600         3,600      3,600      3,600      3,600      3,600         3,600      3,600       3,600      3,600      3,600
  Interest Received                                       5,953       6,253         6,253      6,355      5,540      5,387      5,244         5,016      5,129       5,195      5,261      5,420
  Rental Income                                           2,469       2,475         2,513      2,586      2,678      2,760      2,868         2,983      3,074       3,167      3,262      3,360
  Non-Capital Grants and Contributions                    5,238       5,365         5,447      5,545      5,724      5,898      6,113         6,343      6,537       6,740      6,949      7,167
  Borrowing Costs                                          -846        -539          -659     -1,274     -1,866     -2,470     -2,540        -2,428     -2,298      -2,169     -2,040     -1,914
  Net Cash Flow from Operating Activities                25,010      23,879        24,239     28,998     31,905     34,936     37,782        40,378     43,372      46,304     48,097     51,311

Cash flows from Investing Activities
  Payments for property, plant and equipment            -84,377     -99,660      -148,528    -83,290    -79,980    -56,544    -40,910       -37,658    -40,783     -47,245    -43,578    -43,904
  Grants, subsidies, contributions and donations         44,231      49,436        80,679     33,368     32,777     16,428      4,325         5,134      4,420       3,625      4,495      4,534
  Net Cash Flow from Investing Activities               -40,146     -50,224       -67,849    -49,922    -47,203    -40,116    -36,586       -32,524    -36,362     -43,620    -39,082    -39,369

Cash Flows from Financing Activities
  Proceeds from borrowings                              10,830       13,163       13,163     13,283     13,949       3,620
  Repayment of borrowings                               -1,449       -1,368       -1,248     -1,684     -2,150      -2,657     -2,873        -2,984     -3,115      -3,214     -3,175     -3,301
  Repayments made on finance leases
  Net Cash Flow from Financing Activities                9,381       11,794       11,915     11,599     11,799        963      -2,873        -2,984     -3,115      -3,214     -3,175     -3,301

Total Cash Flows
Net change in Cash and Cash Equivalent held              -5,755     -14,550       -31,695     -9,326     -3,499     -4,217     -1,676        4,870      3,895         -530     5,840      8,641

Opening Cash and Cash Equivalents                       98,976      132,553      133,686    101,991     92,665     89,166     84,949        83,273     88,143       92,039    91,508     97,348

Closing Cash and Cash Equivalents                       93,221      118,003      101,991     92,665     89,166     84,949     83,273        88,143     92,039       91,508    97,348    105,989




                                                                                                                                                                                               4

Page 5

SCHEDULE 4 - STATEMENT OF CHANGES IN EQUITY
                   2026/27 Revised Budget Review 1A Financial Statements                                                                     STATEMENT OF CHANGES IN EQUITY
                                                                                                                                                            For the period ending 30 June
                                          Original      Budget         Budget
                                                                                                                                  Forecast
                                          Budget       Review 1     Review 1A
                                              2027        2027          2027        2028        2029        2030        2031          2032        2033         2034        2035        2036
 Annual Result - Total Council
                                              $,000       $,000         $,000       $,000       $,000       $,000       $,000         $,000       $,000        $,000       $,000       $,000

Asset Revaluation Reserve
  Opening Balance                            441,971     388,582       271,604     301,052     334,841     371,440     410,795       452,358     495,775      540,968     588,060     637,229
  Net result
  Change in Asset Revaluation Surplus         44,085      31,446        29,448      33,789      36,599      39,356      41,563        43,417      45,192       47,092      49,169      51,185
  Internal payments received
  Closing Balance                            486,056     420,027       301,052     334,841     371,440     410,795     452,358       495,775     540,968      588,060     637,229     688,414


Retained Surplus
  Opening Balance                          1,199,875    1,188,507     1,177,570   1,260,080   1,295,385   1,330,198   1,348,752     1,355,289   1,362,744    1,369,560   1,375,680   1,382,801
  Net Result                                  45,871      51,077        82,510      35,305      34,813      18,553       6,537         7,455       6,816        6,120       7,121       7,246
  Increase in asset revaluation surplus
  Internal payments made
  Closing Balance                          1,245,746    1,239,584     1,260,080   1,295,385   1,330,198   1,348,752   1,355,289     1,362,744   1,369,560    1,375,680   1,382,801   1,390,048



Total


  Opening Balance                          1,641,846    1,577,089     1,449,174   1,561,132   1,630,226   1,701,638   1,759,547     1,807,647   1,858,519    1,910,528   1,963,740   2,020,030
  Net Result                                  45,871      51,077        82,510      35,305      34,813      18,553       6,537         7,455       6,816        6,120       7,121       7,246
  Change in Asset Revaluation Surplus         44,085      31,446        29,448      33,789      36,599      39,356      41,563        43,417      45,192       47,092      49,169      51,185
  Closing Balance                          1,731,803    1,659,611     1,561,132   1,630,226   1,701,638   1,759,547   1,807,647     1,858,519   1,910,528    1,963,740   2,020,030   2,078,462




                                                                                                                                                                                             5

Page 6

SCHEDULE 5 - RELEVANT MEASURES OF FINANCIAL SUSTAINABILITY
                          2026/27 Budget Review 1A Financial Statements                                                                                                     RELEVANT MEASURES OF FINANCIAL SUSTAINABILITY
                                                                                                                                                                                                                         For the period ending 30 June
                                                                     Target            Original        Budget           Budget
Indicator (Tier 3)                                                                                                                                                                       Forecast
                                                                     Tier 3            Budget         Review 1       Review 1A
Annual Result - Total Council                                                            2027           2027            2027           2028            2029   2030          2031           2032           2033          2034           2035           2036


   In accordance with section 169(4), (5) and (6) of the Local Government Regulation 2012, Council is required to include in the annual budget, a set of financial sustainability measures. The Queensland Government defines a sustainable local
   government as being 'able to maintain its financial capital and infrastructure capital over the long term' (Local Government Act 2009 (Act), section 104(2). Council's disclosure requirements in relation to section 169 of the Local Government Regulation
   2012 are outlined below.


Financial Capacity

  Council Controlled Revenue Ratio (%)                           No target set          77.9%           77.7%          77.7%          78.3%           79.3%   79.8%         80.2%         80.6%          80.8%          81.0%         81.1%          81.3%

    Council-controlled revenue is an indicator of a council’s financial flexibility, ability to influence its operating income, and capacity to respond to
    unexpected financial shocks.
                                                                                                                                                                               Net Rates, Levies and Charges add Fees and charges
    A higher council-controlled revenue ratio indicates a stronger ability to generate operating revenue without relying on external sources. Councils
                                                                                                                                                                                               Total Operating Revenue
    with a high ratio generally have a healthy rate base and are better able to respond to unexpected financial obligations such as natural disaster
    recovery.


  Population Growth Ratio                                        No target set           1.6%           1.6%            1.6%           0.6%            0.6%   0.6%          0.6%           0.6%           0.6%          0.6%           0.6%           0.6%

    Population growth is a key driver of a council’s operating income, service needs, and infrastructure requirements into the future. A growing council
    population indicates a greater capacity to generate its own source revenue through rates as well as statutory charges. Population growth also puts
    additional pressure on councils to invest in new community infrastructure to support service needs.                                                                                    Prior year estimated population

                                                                                                                                                                                         Previous year estimated population


Operating Performance

  Operating Surplus Ratio (%)                                  Greater than 0%           0.0%           0.0%            0.1%           0.1%            0.1%   0.2%          0.1%           0.1%           0.1%          0.1%           0.1%           0.1%

    The operating surplus ratio is an indicator of the extent to which operating revenues generated cover operational expenses. Any operating surplus
    would be available for capital funding or other purposes.
                                                                                                                                                                                                    Operating Result
    An operating surplus ratio above 0% is an indication that council is managing its finances within its existing funding envelope and generating                                             Total Operating Revenue
    surplus funds for capital funding or other purposes.




                                                                                                                                                                                                                                                                  6

Page 7

                                                      2026/27 Budget Review 1A Financial Statements                                                                         RELEVANT MEASURES OF FINANCIAL SUSTAINABILITY
                                                                                                                                                                                                                         For the period ending 30 June
                                                                   Target            Original       Budget           Budget
Indicator (Tier 3)                                                                                                                                                                       Forecast
                                                                   Tier 3            Budget        Review 1       Review 1A
Annual Result - Total Council                                                          2027           2027           2027           2028           2029       2030          2031           2032           2033          2034           2035           2036


   In accordance with section 169(4), (5) and (6) of the Local Government Regulation 2012, Council is required to include in the annual budget, a set of financial sustainability measures. The Queensland Government defines a sustainable local
   government as being 'able to maintain its financial capital and infrastructure capital over the long term' (Local Government Act 2009 (Act), section 104(2). Council's disclosure requirements in relation to section 169 of the Local Government Regulation
   2012 are outlined below.


Operating Performance (continued)

  Operating Cash Ratio (%)                                    Greater than 0%         16.1%          17.0%          16.0%          17.6%          18.6%      19.6%          20.1%         20.3%          20.8%          21.2%         21.1%          21.6%

    The operating cash ratio is a measure of a council’s ability to cover its core operational expenses and generate a cash surplus excluding                            Operating Result add Depreciation and Amortisation add Finance
    depreciation, amortisation, and finance costs.                                                                                                                                                   Costs

    A positive operating cash ratio indicates that a council is generating surplus cash from its core operations, which suggests that council has the                                          Total Operating Revenue
    ability to self-fund its capital expenditure requirements.


Liquidity
                                                               Greater than 3
  Unrestricted Cash Expense Cover Ratio (months)                                        6.7            8.4            7.2            6.3            6.0        5.7           5.4            5.5            5.6           5.4            5.6            5.9
                                                                  months

    The unrestricted cash expense cover ratio is an indicator of the unconstrained liquidity available to a council to meet ongoing and emergent
                                                                                                                                                                        Total Cash and Equivalents add Current Investments add Available
    financial demands, which is a key component to solvency. It represents the number of months a council can continue operating based on current
    monthly expenses.                                                                                                                                                       Ongoing QTC Working Capital Facility Limit less Externally
                                                                                                                                                                                                Restricted Cash                                    x 12
    A higher unrestricted cash expense cover ratio indicates that a council has sufficient free cash available to contribute to the cost of future planned                Total Operating Expenditure less Depreciation and Amortisation
    and unplanned expenditures such as infrastructure investment or disaster recovery.                                                                                                         less Finance Costs


                                                               Greater than 3
  Total Cash expense Cover Ratio (months)                                               8.1           10.4            8.9            7.7            7.1        6.6           6.1            6.2            6.3           6.0            6.2            6.5
                                                                  months

    The total cash expense cover ratio is an indicator of the total liquidity available to a council to meet ongoing and emergent financial demands, which
    is a key component to solvency. It represents the number of months a council can continue operating based on current monthly expenses.

    A higher total cash expense cover ratio indicates that a council has sufficient free cash available to contribute to the cost of future planned and                         Total Cash and Equivalents add Current Investments                 x 12
    unplanned expenditures such as infrastructure investment or disaster recovery.                                                                                        Total Operating Expenditure less Depreciation and Amortisation
                                                                                                                                                                                               less Finance Costs




                                                                                                                                                                                                                                                                  7

Page 8

                                                      2026/27 Budget Review 1A Financial Statements                                                                         RELEVANT MEASURES OF FINANCIAL SUSTAINABILITY
                                                                                                                                                                                                                         For the period ending 30 June
                                                                    Target            Original       Budget            Budget
Indicator (Tier 3)                                                                                                                                                                       Forecast
                                                                    Tier 3            Budget        Review 1        Review 1A
Annual Result - Total Council                                                           2027           2027           2027           2028           2029      2030          2031           2032           2033          2034           2035           2036


   In accordance with section 169(4), (5) and (6) of the Local Government Regulation 2012, Council is required to include in the annual budget, a set of financial sustainability measures. The Queensland Government defines a sustainable local
   government as being 'able to maintain its financial capital and infrastructure capital over the long term' (Local Government Act 2009 (Act), section 104(2). Council's disclosure requirements in relation to section 169 of the Local Government Regulation
   2012 are outlined below.


Asset Management

  Asset Sustainability Ratio                                  Greater than 80%        217.8%         231.8%          435.4%         161.1%         115.5%     94.8%         77.9%         65.2%          76.7%          84.7%         74.7%          70.2%

    The asset sustainability ratio approximates the extent to which the infrastructure assets managed by a council are being replaced as they reach the
    end of their useful lives.
                                                                                                                                                                           Capital Expenditure on Replacement of Infrastructure Assets
    An asset sustainability ratio close to 100% suggests that a council is spending enough on the renewal of its assets to compensate for the                                                      (Renewals)
    deterioration in its asset base as loosely proxied by its reported depreciation, with outcomes too far below this level being potentially indicative of                      Depreciation Expenditure on Infrastructure Assets
    underspending against capital replacement requirements.


  Asset Consumption Ratio                                     Greater than 60%         82.3%          72.8%          82.8%          95.5%           96.1%     97.1%         96.1%         94.7%          93.5%          92.4%         91.5%          90.3%


    The asset consumption ratio approximates the extent to which council’s infrastructure assets have been consumed compared to what it would cost
    to build a new asset with the same benefit to the community.
                                                                                                                                                                           Written Down Replacement Cost of Depreciable Infrastructure
    The minimum target of 60% indicates that a council’s assets are being broadly consumed in line with their estimated useful lives.                                                              Assets

                                                                                                                                                                                      Cost of Depreciable Infrastructure Assets


  Asset Renewal Funding Ratio                                   No Target Set          99.5%          99.5%          113.4%


    The asset renewal funding ratio measures the ability of a council to fund its projected infrastructure asset renewal/replacements in the future.

    Ideally, the asset renewal funding ratio should be as close to 100% as possible, as this indicates that a council is appropriately funding and                          Total of Planned Capital Expenditure on Infrastructure Asset
    delivering the entirety of its required capital program as outlined by its asset management plans.                                                                                        Renewals over 10 years
                                                                                                                                                                           Total of Required Capital Expenditure on Infrastructure Asset
                                                                                                                                                                                              Renewals over 10 years




                                                                                                                                                                                                                                                                  8

Page 9

                                                       2026/27 Budget Review 1A Financial Statements                                                                           RELEVANT MEASURES OF FINANCIAL SUSTAINABILITY
                                                                                                                                                                                                                         For the period ending 30 June
                                                                      Target            Original        Budget            Budget
Indicator (Tier 3)                                                                                                                                                                        Forecast
                                                                      Tier 3            Budget         Review 1        Review 1A
Annual Result - Total Council                                                             2027           2027            2027            2028           2029        2030        2031        2032           2033          2034          2035           2036


   In accordance with section 169(4), (5) and (6) of the Local Government Regulation 2012, Council is required to include in the annual budget, a set of financial sustainability measures. The Queensland Government defines a sustainable local
   government as being 'able to maintain its financial capital and infrastructure capital over the long term' (Local Government Act 2009 (Act), section 104(2). Council's disclosure requirements in relation to section 169 of the Local Government Regulation
   2012 are outlined below.


Debt Servicing Capacity

  Leverage Ratio                                                   0 - 3 times         1.4 times       1.3 times      1.3 times       1.5 times       1.7 times   1.5 times   1.4 times   1.2 times     1.1 times     1.0 times      0.9 times     0.7 times


    The leverage ratio is an indicator of a council’s ability to repay its existing debt. It measures the relative size of the council’s debt to its operating
    performance.

    A higher leverage ratio indicates an increasingly limited capacity to support additional borrowings due to already high debt levels and/or decreasing                                           Book value of Debt
    operational performance, while a lower ratio indicates the opposite.                                                                                                          Operating Results add Depreciation and Finance Costs


  Net Liabilities Ratio                                          less than 60%           -1.7%          -25.1%          -3.5%            8.3%          15.9%       17.6%       15.9%        11.3%         7.5%           5.9%          1.8%          -3.3%


    The Net Liabilities Ratio outlines the level that net debt can be serviced by operating revenues.                                                                                      Total Liabilities less Current Assets

    A ratio below zero implies that liabilities are less than cash (and other current assets) and there is adequate borrowing capacity available if needed.                                     Total Operating Revenue




                                                                                                                                                                                                                                                                  9

Page 10

SCHEDULE 6 - CAPITAL PROGRAM COMPARISON OB TO BR1A
                               2026/27 Budget Review 1A Financial Statements
                                                       2026/27 Capital Works Program - OB to BR1A
                                                                                Original           Budget
                                        Project
                                                                                Budget          Review 1A
                                                                                 $'000           $'000

Asset Management
  Noosa Heads - Hastings Precinct CCTV                                                 100            100
  Noosaville and Pomona Depot - Mobile Hardware Replacement                                50          50
Asset Management Total                                                                 150            150


Bridges
  Noosa Heads - Girraween Bridge Renewal                                               159            159
  Noosa Heads - Munna Point Bridge Renewal                                                 73          73
  Tewantin Doonella Bridge Renewal                                                   7,800           8,682
Bridges Total                                                                        8,031           8,913


Cemeteries
  Pomona - Pomona Cemetery - Niche Wall                                                    41          41
  Cooroy - Cemetery - New Beams                                                            83          83
  Tewantin - Cemetery - New Shade Shelter                                                              13
Cemeteries Total                                                                       125            137


Coastal Canals and Waterways
  Noosa Shire Council’s Noosa Main Beach Sea Wall Detailed Design                                     226
  Noosaville - Living Foreshores Hilton Esplanade                                      487            600
  Noosaville - Renewal Rock Armour Around Noosa River                                  210            210
  Noosaville Gympie Terrace Revetment Wall                                                 85         147
  Shire Beach Access Renewal Program                                                   269            269
  Shire Beach Shower Renewal Program                                                       66          66
  Noosa Heads Dog Beach SEMP                                                                           67
Coastal Canals and Waterways Total                                                   1,117           1,586


Community Facilities
  Cooroy - SES Unit - Shed refurbishment                                                               45
  Noosaville - NLC - Floor Renewal                                                         85          85
  Noosaville - NLC - Renewal                                                           239            239
  Noosa Heads - The J - Minor Building Refurbishment                                   100            290
  Sunshine Beach - BCC and Montessori - Renewals Program                                   49          84
  Sunshine Beach NAC AMP Renewal Program                                                               36
  Sunshine Beach - Noosa Aquatic Centre - 50m & 25m Filtration System Upgrade        1,500           2,064
Community Facilities Total                                                           1,973           2,843




                                                                                                        10

Page 11

SCHEDULE 6 - CAPITAL PROGRAM COMPARISON OB TO BR1A
                                2026/27 Budget Review 1A Financial Statements
                                                        2026/27 Capital Works Program - OB to BR1A
                                                                              Original           Budget
                                              Project
                                                                              Budget          Review 1A
                                                                               $'000           $'000

Corporate Buildings
  Noosa Shire - Multiple locations - Electronic Security Upgrades                    114            114
  Noosaville - Noosa Depot Main Electrical Switch Board Upgrade                                     286
  Noosaville Depot - LDCC Amenities                                                                  50
  Shire Council Building Renewal Program                                           1,000           1,000
  Tewantin - Admin Building- Mains Hydrant Water                                         30          30
Corporate Buildings Total                                                          1,144           1,480


Environmental Assets, Bushland, Tracks and Trails
  Kin Kin - Wahpunga (Trail 4) & Woondum (Trail 3) - Trail Renewal                                 1,482
Environmental Assets, Bushland, Tracks and Trails Total                                            1,482


Fleet - Plant Replacement
  Shire Council Fleet and Plant Replacement Program                                3,572           3,918
Fleet - Plant Replacement Total                                                    3,572           3,918


Gravel Road Network
  Shire Gravel Reheating Program                                                     512            512
  Shire Wide - Gravel Roads Segment Improvement Program                            1,500           1,500
Gravel Road Network Total                                                          2,012           2,012


Holiday Parks
  Noosa River Holiday Park - Street Lighting Renewal                                                 41
Holiday Parks Total                                                                                  41


Libraries and Galleries
  Noosa Shire - City Deal Public Art Initiative                                      145            462
  Noosaville - Library - Roof Rectification                                                         418
  Noosaville and Cooroy Libraries - Self-Service Kiosk Replacement                       95          95
Libraries and Galleries Total                                                        240            975


Minor Plant & Equipment
  Noosa Heads - The J - Audio Visual Renewal Program                                     50          50
Minor Plant & Equipment Total                                                            50          50




                                                                                                      11

Page 12

SCHEDULE 6 - CAPITAL PROGRAM COMPARISON OB TO BR1A
                               2026/27 Budget Review 1A Financial Statements
                                                           2026/27 Capital Works Program - OB to BR1A
                                                                                 Original           Budget
                                         Project
                                                                                 Budget          Review 1A
                                                                                  $'000           $'000

Parks & Playgrounds
  Peregian Beach - Kingfisher Drive - Playground renewal                                648            648
  Cooran - Pioneer Park - Playground Renewal                                                           228
  Cooroy - Noosa Botanic Gardens - Plant & Equipment Shed                               160            160
  Cooroy - Noosa Botanic Gardens - Staff Toilet Facility                                                10
  Noosa Heads - Lions Park - Playground Renewal                                                         86
  Pomona - Cooroora Creek Park - Native Plant Trail                                         19          19
  Pomona - Place Plans Quick Wins                                                           30          30
  Shire BBQ & Drinking Fountain Renewal Program                                         108            108
  Shire Lighting Renewal Program                                                        205            205
  Shire Park Furniture Renewal Program                                                  108            108
  Shire Park Shelter Renewal Program                                                        49          49
  Shire Wide - Parks & Playgrounds Renewal Program                                      400            400
Parks & Playgrounds Total                                                             1,726           2,049


Pathways & Boardwalks
  Coastal Pathway Stage 1 - Peregian Beach Active Street                              1,065           1,065
  Noosa North Shore - Teewah Village - Pedestrian Beach Access Improvement              312            393
  Noosaville - Bluebell Court - Hinterland and local links Pathway                                      60
  Peregian Beach - Osprey Ave - Pathway renewal and widening                                            15
  Pomona - School Street - Hinterland and local links Pathway                           290            529
  Shire Wide - Pathway Improvement Program                                              500            764
  Shire Wide Accelerated Walking & Cycling Program Delivery                             550            550
  Sunrise Beach - Captains Court - Hinterland and local links Pathway                       89          89
  Tewantin - William Street - Hinterland and local links Pathway                                       259
Pathways & Boardwalks Total                                                           2,806           3,723


Public Amenities
  Noosaville - Gympie terrace - Changing Places Facility                                635           1,502
  Shire Public Amenities Renewal Program                                                    60          60
Public Amenities Total                                                                  695           1,562


Recovery Works
  Recovery Works                                                                     29,200          78,068
Recovery Works Total                                                                 29,200          78,068




                                                                                                         12

Page 13

SCHEDULE 6 - CAPITAL PROGRAM COMPARISON OB TO BR1A
                                2026/27 Budget Review 1A Financial Statements
                                                         2026/27 Capital Works Program - OB to BR1A
                                                                               Original           Budget
                                         Project
                                                                               Budget          Review 1A
                                                                                $'000           $'000

Sealed Roads Network
  Shire Kerb & Channel Renewal Program                                                500            566
  Shire Reseal Program                                                              5,939           6,058
  Shire Wide - Heavy Patching                                                       1,615           1,832
Sealed Roads Network Total                                                          8,054           8,457


Sports Ground and Facilities
  Cooroy Sports Complex - Gymnastics Upgrade & Multi-purpose area                   2,489           3,960
Sports Ground and Facilities Total                                                  2,489           3,960


Stormwater Drainage
  Marcus Beach - David Low Way - Box culvert Replacement                              425            470
  Sunshine Beach - GPT basket                                                             46          46
  Noosa Heads - Cooyar Street - Stormwater Bio-basin Upgrade                          540            560
  Noosaville - Wylah Street - Stormwater Culvert Renewal                            1,000            500
  Shire Bio-Retention Basin Renewals Program                                              54          54
  Shire Pipe Relining / Rehabilitation Renewal Program                              1,258           1,298
  Shire Pit Structure Renewal Program                                                 124            234
  Sunshine Beach - Ross Crescent - Slope Stabilisation Construction                                 1,145
  Tewantin - Hilton Precinct - Stormwater Drainage Alignment Design                                   36
Stormwater Drainage Total                                                           3,448           4,343


Strategic Planning
  Cooroy - Lake Macdonald Drive - Residential Subdivision                                           1,959
Strategic Planning Total                                                                            1,959


Transport and Infrastructure Management
  Cooroy - State School - Provision of Disabled Car Park                                              50
  Noosa Heads, Noosa Drive Halse Lane to Sunshine Beach Rd                                             7
  Shire Forward Planning & Design Program Construction Ready Designs                  560            560
  Tewantin - Hilton Esplanade - Design of Cycle Street (Priority Treatment)           300            375
  Tewantin - Beckmans Road Upgrade Design and Construct                               765
  Tewantin - Beckmans Road Consultation and Planning                                                  76
Transport and Infrastructure Management Total                                       1,625           1,068




                                                                                                       13

Page 14

SCHEDULE 6 - CAPITAL PROGRAM COMPARISON OB TO BR1A
                              2026/27 Budget Review 1A Financial Statements
                                                    2026/27 Capital Works Program - OB to BR1A
                                                                                    Original         Budget
                                         Project
                                                                                    Budget        Review 1A
                                                                                     $'000         $'000

Waste Management
  Doonan - Waste Recovery & Landfill - 561 Eumundi-Noosa Road - WHS & Environmental Compliance            25
  Doonan - Landfill - Leachate Treatment                                                    650          247
  Doonan - Landfill - Missing Link Capping                                                             1,234
  Doonan - Landfill - North & East Batter Capping                                         3,475        3,954
  Doonan - Landfill North Batter Solar                                                                    12
  Doonan - Landfill - WHSE Site Upgrades                                                  1,380        1,993
  Doonan - Noosaville/Eumundi Road Landfill Expansion of Resource Recovery Area           8,800        8,963
  Doonan - Resource Recovery Centre - Compost Facility                                                 1,008
  Noosa Heads - Hastings St - Compaction Bins                                               225          225
  Resource Recovery Centre CEUF Project                                                     654          888
Waste Management Total                                                                   15,184       18,550


ZEN Program
  Clean Energy Upgrades CEUF                                                                288          706
  Emissions Reduction Program Implementation 2025/26                                                      44
  Emissions Reduction Program Implementation 2026/27                                        450          450
ZEN Program Total                                                                           738        1,200


Total Program                                                                            84,377      148,528




                                                                                                          14

Page 15

SCHEDULE 7 - REVISED CAPITAL WORKS PROGRAM 2026/27
                                                                                   RENEWAL, NEW, EXPANSIONS & UPGRADE CAPITAL PROJECTS
                                                                                                   2026/27 Budget Review 1A - Revised Capital Works Program
                                                                                     Grant                                              General
                                                                                                                Levy       Other
 Program                                                                      Funding / Ext    Loans                                      Cash     Project Total
                                                                                                            Reserves    Reserves
                                                                                     funds                                            Reserves
                                                                                  $'000         $'000       $'000        $'000         $'000           $'000

Asset Management
Noosa Heads - Hastings Precinct CCTV                                                                                                         100                100
Noosaville and Pomona Depot - Mobile Hardware Replacement                                                                                     50                 50

Asset Management Total                                                                                                                       150                150

Bridges
Noosa Heads - Girraween Bridge Renewal                                                                                                       159                159
Noosa Heads - Munna Point Bridge Renewal                                                                                                      73                 73
Tewantin Doonella Bridge Renewal                                                       4,341                                               4,341               8,682

Bridges Total                                                                          4,341                                               4,572            8,913

Cemeteries
Pomona - Pomona Cemetery - Niche Wall                                                    113                                                  41                154
Cooroy - Cemetery - New Beams                                                            485                                                  83                568
Tewantin - Cemetery - New Shade Shelter                                                                                                       13                 13

Cemeteries Total                                                                         598                                                 137                735

Coastal Canals and Waterways
Noosa Shire Council’s Noosa Main Beach Sea Wall Detailed Design                                                                              113                113
Noosaville - Living Foreshores Hilton Esplanade                                                                                              115                115
Noosaville - Renewal Rock Armour Around Noosa River                                                                                          210                210
Noosaville Gympie Terrace Revetment Wall                                                                                                     147                147
Shire Beach Access Renewal Program                                                                                                           269                269
Shire Beach Shower Renewal Program                                                                                                            66                 66
Noosa Heads Dog Beach SEMP                                                                                                                    67                 67

Coastal Canals and Waterways Total                                                                                                           988                988

Community Facilities
Cooroy - SES Unit - Shed refurbishment                                                    45                                                                     45
Noosaville - NLC - Floor Renewal                                                                                                              85                 85
Noosaville - NLC - Renewal                                                                                                                   239                239
Noosa Heads - The J - Minor Building Refurbishment                                                                                           290                290
Sunshine Beach - BCC and Montessori - Renewals Program                                                                                        84                 84
Sunshine Beach NAC AMP Renewal Program                                                                                                        36                 36
Sunshine Beach - Noosa Aquatic Centre - 50m & 25m Filtration System Upgrade            1,232                                                 832               2,064

Community Facilities Total                                                             1,277                                               1,566            2,843

Corporate Buildings
Noosa Shire - Multiple locations - Electronic Security Upgrades                                                                              114                114
Noosaville - Noosa Depot Main Electrical Switch Board Upgrade                                                                                286                286
Noosaville Depot - LDCC Amenities                                                                                                             50                 50
Shire Council Building Renewal Program                                                                                                     1,000               1,000
Tewantin - Admin Building- Mains Hydrant Water                                                                                                30                 30

Corporate Buildings Total                                                                                                                  1,480            1,480

Environmental Assets, Bushland, Tracks and Trails
Kin Kin - Wahpunga (Trail 4) & Woondum (Trail 3) - Trail Renewal                         741                                                 741               1,482

Environmental Assets, Bushland, Tracks and Trails Total                                  741                                                 741            1,482

Fleet - Plant Replacement
Shire Council Fleet and Plant Replacement Program                                                                            3,918                             3,918

Fleet - Plant Replacement Total                                                                                              3,918                          3,918


Gravel Road Network
Shire Gravel Reheating Program                                                                                                               512                512
Shire Wide - Gravel Roads Segment Improvement Program                                                                                      1,500               1,500

Gravel Road Network Total                                                                                                                  2,012            2,012

Holiday Parks
Noosa River Holiday Park - Street Lighting Renewal                                                                               41                              41

Holiday Parks Total                                                                                                              41                              41




                                                                                                                                                                   15

Page 16

SCHEDULE 7 - REVISED CAPITAL WORKS PROGRAM 2026/27
                                                                                RENEWAL, NEW, EXPANSIONS & UPGRADE CAPITAL PROJECTS
                                                                                                   2026/27 Budget Review 1A - Revised Capital Works Program
                                                                                  Grant                                                General
                                                                                                                Levy       Other
 Program                                                                   Funding / Ext       Loans                                     Cash        Project Total
                                                                                                            Reserves    Reserves
                                                                                  funds                                              Reserves
                                                                               $'000            $'000       $'000        $'000        $'000              $'000

Libraries and Galleries
Noosa Shire - City Deal Public Art Initiative                                         462                                                                         462
Noosaville - Library - Roof Rectification                                                                                                   418                   418
Noosaville and Cooroy Libraries - Self-Service Kiosk Replacement                                                                             95                    95

Libraries and Galleries Total                                                         462                                                   513                   975

Minor Plant and Equipment
Noosa Heads - The J - Audio Visual Renewal Program                                                                                           50                    50

Minor Plant and Equipment Total Libraries and Galleries Total                                                                                50                    50

Parks & Playgrounds
Peregian Beach - Kingfisher Drive - Playground renewal                                                                                      648                   648
Cooran - Pioneer Park - Playground Renewal                                                                                                  228                   228
Cooroy - Noosa Botanic Gardens - Plant & Equipment Shed                                                                                     160                   160
Cooroy - Noosa Botanic Gardens - Staff Toilet Facility                                                                                       10                    10
Noosa Heads - Lions Park - Playground Renewal                                                                                                86                    86
Pomona - Cooroora Creek Park - Native Plant Trail                                                                                            19                    19
Pomona - Place Plans Quick Wins                                                                                                              30                    30
Shire BBQ & Drinking Fountain Renewal Program                                                                                               108                   108
Shire Lighting Renewal Program                                                                                                              205                   205
Shire Park Furniture Renewal Program                                                                                                        108                   108
Shire Park Shelter Renewal Program                                                                                                           49                    49
Shire Wide - Parks & Playgrounds Renewal Program                                                                                            400                   400

Parks & Playgrounds Total                                                                                                                 2,049               2,049

Pathways & Boardwalks
Coastal Pathway Stage 1 - Peregian Beach Active Street                              1,065                                                                        1,065
Noosa North Shore - Teewah Village - Pedestrian Beach Access Improvement                                                                    393                   393
Noosaville - Bluebell Court - Hinterland and local links Pathway                       30                                                    30                    60
Peregian Beach - Osprey Ave - Pathway renewal and widening                                 8                                                     8                 15
Pomona - School Street - Hinterland and local links Pathway                           264                                                   264                   529
Shire Wide - Pathway Improvement Program                                                                                                    764                   764
Shire Wide Accelerated Walking & Cycling Program Delivery                                                                                   550                   550
Sunrise Beach - Captains Court - Hinterland and local links Pathway                    44                                                    44                    89
Tewantin - William Street - Hinterland and local links Pathway                        130                                                   130                   259

Pathways & Boardwalks Total                                                         1,541                                                 2,182               3,723

Public Amenities
Noosaville - Gympie terrace - Changing Places Facility                              1,502                                                                        1,502
Shire Public Amenities Renewal Program                                                                                                       60                    60

Public Amenities Total                                                              1,502                                                    60               1,562

Recovery Works
Recovery Program                                                                   60,443                                   16,825          800              78,068

Recovery Works Total                                                               60,443                                   16,825          800              78,068

Sealed Roads Network
Shire Kerb & Channel Renewal Program                                                                                                        566                   566
Shire Reseal Program                                                                 1,913                                                 4,145                 6,058
Shire Wide - Heavy Patching                                                                                                               1,832                  1,832

Sealed Roads Network Total                                                          1,913                                                 6,544               8,457


Sports Grounds and Facilities
Cooroy Sports Complex - Gymnastics Upgrade & Multi-purpose area                     3,960                                                                        3,960

Sports Grounds and Facilities Total                                                 3,960                                                                     3,960




                                                                                                                                                                     16

Page 17

SCHEDULE 7 - REVISED CAPITAL WORKS PROGRAM 2026/27
                                                                                                RENEWAL, NEW, EXPANSIONS & UPGRADE CAPITAL PROJECTS
                                                                                                                2026/27 Budget Review 1A - Revised Capital Works Program
                                                                                                  Grant                                                General
                                                                                                                                Levy      Other
 Program                                                                                   Funding / Ext    Loans                                        Cash        Project Total
                                                                                                                            Reserves   Reserves
                                                                                                  funds                                              Reserves
                                                                                               $'000         $'000          $'000      $'000          $'000              $'000

Stormwater Drainage
Marcus Beach - David Low Way - Box culvert Replacement                                                                                                      470                   470
Sunshine Beach - GPT basket                                                                                                                                  46                    46
Noosa Heads - Cooyar Street - Stormwater Bio-basin Upgrade                                            560                                                                         560
Noosaville - Wylah Street - Stormwater Culvert Renewal                                                                                                      500                   500
Shire Bio-Retention Basin Renewals Program                                                                                                                   54                    54
Shire Pipe Relining / Rehabilitation Renewal Program                                                                                                      1,298                  1,298
Shire Pit Structure Renewal Program                                                                                                                         234                   234
Sunshine Beach - Ross Crescent - Slope Stabilisation Construction                                     572                                                   572                  1,145
Tewantin - Hilton Precinct - Stormwater Drainage Alignment Design                                                                                            36                    36

Stormwater Drainage Total                                                                           1,133                                                 3,211               4,343

Strategic Planning
Cooroy - Lake Macdonald Drive - Residential Subdivision                                                             1,959                                                        1,959

Strategic Planning Total                                                                                            1,959                                                     1,959


Transport and Infrastructure Management
Cooroy - State School - Provision of Disabled Car Park                                                                                                       50                    50
Noosa Heads, Noosa Drive Halse Lane to Sunshine Beach Rd                                                                                                         7                   7
Shire Forward Planning & Design Program Construction Ready Designs                                                                                          560                   560
Tewantin - Hilton Esplanade - Design of Cycle Street (Priority Treatment)                             375                                                                         375
Tewantin - Beckmans Road Upgrade Design and Construct
Tewantin - Beckmans Road Consultation and Planning                                                                                                           76                    76

Transport and Infrastructure Management Total                                                         375                                                   693               1,068

Waste Management
Doonan - Waste Recovery & Landfill - 561 Eumundi-Noosa Road - WHS & Environmental Compliance                                                   25                                  25
Doonan - Landfill - Leachate Treatment                                                                               247                                                          247
Doonan - Landfill - Missing Link Capping                                                                                                    1,234                                1,234
Doonan - Landfill - North & East Batter Capping                                                                                             3,954                                3,954
Doonan - Landfill North Batter Solar                                                                                                           12                                  12
Doonan - Landfill - WHSE Site Upgrades                                                                              1,993                                                        1,993
Doonan - Noosaville/Eumundi Road Landfill Expansion of Resource Recovery Area                                       8,963                                                        8,963
Doonan - Resource Recovery Centre - Compost Facility                                                                                                      1,008                  1,008
Noosa Heads - Hastings St - Compaction Bins                                                                                                    225                                225
Resource Recovery Centre CEUF Project                                                                 444                                      444                                888

Waste Management Total                                                                                444       11,204                      5,895         1,008              18,550

Zero Emissions Program
Clean Energy Upgrades CEUF                                                                            353                                                   353                   706
Emissions Reduction Program Implementation 2025/26                                                                                                           44                    44
Emissions Reduction Program Implementation 2026/27                                                                                                          450                   450

Zero Emissions Program Total                                                                          353                                                   847               1,200

Total Program                                                                                      79,082       13,163                     26,680        29,604             148,528




                                                                                                                                                                                     17

Page 18

SCHEDULE 8 - REVISED 10-YEAR CAPITAL WORKS PROGRAM

                                                      2026/27 Revised Budget Review 1A Financial Statements                                       2026/27 10-YEAR SUMMARY CAPITAL PROGRAM
                                                                                                                                           Budget Review 1A - Revised 10-Year Capital Works Program
                                                                        Budget Review      Budget
                                                      Original Budget                                                                      Forecast
                                                                                    1   Review 1A
                                                               2027        2,027.00         2027      2028     2029     2030     2031     2032         2033     2034      2035       2036     Total
Capital Program
                                                              $,000           $,000        $,000     $,000    $,000    $,000    $,000    $,000        $,000    $,000     $,000      $,000     $,000
Capital Works
  Bridges                                                      8,031            8,913        8,913    1,603    1,620    1,500    1,500    3,084        1,624    1,665     1,706      1,749     24,964
  Car Parks                                                                                            175                         41                                                            216
  Cemeteries                                                     125             137          137               116      118      172       49           50       52        53         54        802
  Coastal Canals and Waterways                                 1,117            1,586        1,586    1,159    5,103    7,928     753     1,064         957      650       666        683      20,548
  Commercial Land & Property                                                                           313      170      174      179      183          188      193       197        202       1,799
  Community Facilities                                         1,973            2,843        2,843    1,559    2,585    2,441     737     1,254        1,271    1,289      227        230      14,436
  Corporate Buildings                                          1,144            1,480        1,480    1,172     654      557      808     3,183         600      615       630        646      10,345
  Environmental Assets, Bushland, Tracks and Trails                             1,482        1,482    1,000             1,000             1,000                 1,000                           5,482
  Gravel Road Network                                          2,012            2,012        2,012    2,062    2,414    2,474    2,536    2,599         925      948       972        996      17,937
  Holiday Parks                                                                   41           41       68      274      323      394      408          417      426        81         83       2,514
  Libraries & Galleries                                          240             975          975      271      296      213      179      183          188      193       197        202       2,897
  Minor Plant & Equipment                                         50              50           50       51       53                                                                              154
  Parks & Playgrounds                                          1,726            2,049        2,049    2,762    1,006    1,034     813      834          855      876       899        921      12,049
  Pathways & Boardwalks                                        2,806            3,723        3,723    6,013    4,929    5,253    5,688    3,515        4,153    3,693     3,285      3,367     43,619
  Public Amenities                                               695            1,562        1,562     858      590     1,348     357      366          375      384       394        404       6,637
  Recovery Works                                              29,200           29,200       78,068   24,000   10,000                                                                          112,068
  Sealed Roads Network                                         8,054            8,457        8,457    9,958   11,460   12,710   11,227   10,523       12,526   12,839    13,476     13,490    116,663
  Sports Ground and Facilities                                 2,489            3,960        3,960     492     2,058     100      100      100                                                  6,811
  Stormwater Drainage                                          3,448            4,343        4,343    4,687    1,591    2,061    6,373    1,998        2,031    2,064      494        506      26,149
   Strategic Planning                                                           1,959        1,959
  Streetscapes and Road Corridors                                                                     1,214    1,245    1,276    1,308    1,341        1,374    1,409     1,444      1,480     12,090
  Transport and Infrastructure Management                      1,625            1,068        1,068    5,639   17,089    9,703    3,779     974         5,954    5,666     5,683      5,700     61,255
  Waste Management                                            15,184           18,550       18,550   15,531   13,999    3,200     200      200                   200                           51,880
Total Capital Works                                           79,919           94,392      143,260   80,587   77,251   53,414   37,141   32,858       33,486   34,160    30,403     30,715    551,315


Other Works
  Asset Management                                               150             150          150      722      781      731      293      240          306      250       269        210       3,952
  Asset Rehabilitation/Renewal Provision                                                                                                               5,000   10,000    10,000     10,000     35,000
  Fleet - Plant Replacement                                    3,572            3,918        3,918    1,659    1,948    2,399    3,476    4,559        1,991    2,835     2,906      2,979     28,671
  Zero Emissions Noosa Projects                                  738            1,200        1,200     322                                                                                      1,522
Total Other Works                                              4,459            5,268        5,268    2,703    2,730    3,130    3,769    4,800        7,297   13,085    13,175     13,189     69,145


Total Capital Works Program                                   84,377           99,660      148,528   83,290   79,980   56,544   40,910   37,658       40,783   47,245    43,578     43,904    622,420




                                                                                                                                                                                                        18

Used in these records

About this file

File size
712 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 6 - 2026-27 Budget Review 1A and Revised 2026-27 to 2035-36 Long Term Financial Forecast.pdf · 712 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗