Original source · versioned page text
Approved Plans OPW20/145.06
Plans and drawings: the text below has words only, no drawings.
Very large file (88.1 MB): may take a few minutes to open.
Original PDF page 24, section 1. The text section number identifies this passage in the reader.
DRIVEWAY EXTENT
BDY
BDY
-8.600m
8.600m
-6.600m
6.600m
12.849m
4.763
4.688
4.713
4.638
4.578
4.503
4.208
2% 2.5% 2.5% -3% 3% -3% 2.5% 2.5% 1:-4
-1.1% -2.5%
B1 B1
Datum 2
Centreline R.L.4.638
DRIVEWAY EXTENT 140.000
BDY
BDY
-8.600m
8.600m
-6.600m
6.600m
12.492m
4.866
4.791
4.816
4.741
4.681
4.606
-1.5% 2% 2.5% 3% 2.5% 2.5%
4.4
2.5% -2.5% -3% -3% 1:-4
B1 B1
Datum 2
CH120.000 Centreline R.L.4.741
69.44m
BDY
BDY
-8.600m
8.600m
11.570m
-6.600m
6.600m
4.967
4.892
4.917
4.842
4.731
4.782
4.707
2% 2.5% 1:-4
-84.468m
2.5% 2.5% -2.5% -3% 3% -3%
3.156
B1 B1
1:-2
Datum 3
CH100.000 Centreline R.L.4.842
PEG CL
48.97m
BDY
BDY
10.668m
-8.600m
8.600m
-6.600m
6.600m
5.284
5.275
5.209
5.234
-59.828m
5.159
5.099
5.024
2% 2.5% 2.5% -3% 3% -3% 2.5% 2.5%
-1.5% -2.5%
4.038
1:-2 B1 B1
Datum 3
CH80.000 Centreline R.L.5.159
4.9m 10.9m 4.05m
61.32m 1.85m 2m 1.15m 10.9m 1.15m 2m
BDY
BDY
-6.600m
6.600m
8.600m
-73.693m
-8.600m
6.324
12.406m
6.249
6.274
6.199
6.139
6.064
5.779
0.75% 2.5%
1:-2 2% 2.5%
5.88
-2.5% -3% 3% -3% 2.5% 1:-4
B1 B1
Datum 4
CH60.000 Centreline R.L.6.199
LEGEND:
PEG CL
B1 BARRIER KERB (B1 TYPE) 450mm CHANNEL -
NOOSA COUNCIL
BDY
BDY
SM4 SEMI-MOUNTABLE TYPE
22.015m
ER2 EDGE RESTRAINT
-6.600m
6.600m
8.600m
-8.600m
APPROVED PLAN
CH CHANNEL 600mm WIDE
7.431
7.655
7.373
7.381
7.323
7.245
7.188
14.986m
2.5% 2.5% -3% -2.4% 2.5% 2.5% 2.5%
OPW20/0145 17 DEC 2020
6.341
1:-4
B1 B1
Datum 5
CH40.000 Centreline R.L.7.365
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD SCALE APPROVED PROPOSED SUBDIVISION 1856
A 13-09-19 FOR APPROVAL MM CL AT NOOSA CIVIC, WALTER HAY DRIVE
B 25-08-20 REVISED FOR APPROVAL - WALTER HAY DRIVE TURN AROUND MM CL DATUM AHD SHEET: 17 OF 42
0 2 4 6 8 10m FOR STOCKWELL PTY LTD
C
D
21-09-20
15/10/20
REVISED FOR NOOSA COUNCIL DRAFT CONDITIONS
REVISED AS PER COUNCIL RFI [29/09/20]
MM
MM
CL
CL
DESIGN MM ................. DRAWING NUMBER REV
DRAWING TITLE:
E 23/11/20 REVISED AS PER COUNCIL RFI MEETING MM CL DRAWN MM Director: CAMERON LANDRETH
DESIGN CHECK
SCALE 1:200 A3
(RPEQ 19358) p 07 5443 8285 ROAD B CROSS SECTIONS (SHEET 1 OF 2) R46 E
CL
This drawing is not to be copied or amended without written permission from e [email protected] w www.barlowshelley.com.au
DATE 13-09-19 Barlow Shelley Consulting Engineers a PO Box 899, Maroochydore,4558 ABN 89 215 591 077
Document Set ID: 21753628
21426255
Version: 1, Version Date: 12/01/2022
24/03/2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.