Original PDF page 95, section 1. The text section number identifies this passage in the reader.

                                                                                                                       Noosa Civic | Page 22




                               The fuel loads in Lots 3 and 7 should be monitored and would benefit from a periodic hazard
                               reduction burn at 7 to 10year intervals. The management of this access will be by the Noosa Civic
                               Centre Management.

                               Lots 12 to 15 – 20m buffer - The proposed APZ’s (Asset Protection Zones) will be covered by a
                               detailed management condition that includes an annual preparedness timetable and maintenance plan.
                               This will include acceptable uses an exclusions e.g. concrete parking bays or similar is acceptable.
                               Any vegetation required to stabilise the batter of the hardstand structure will be maintained in a
                               manicured state.

                               It is normal practice to reduce the bushfire hazard and risk to meet Council’s Bushfire Overlay Code.
                               The retention of Lots 3 and 7 only add a minor risk due to their small size and the presence of
                               surrounding access and therefore provides an acceptable outcome.

                               6.4.2. External
                               The vegetation in the National Park north of Area 2 should be considered for a cooperative hazard
                               reduction burn with National Parks. This would only be required on a once in 7-10-year cycle. This
                               has been discussed with a local National Parks Ranger and has received his support. The entire Park
                               area south to Eenie Creek should also have management that would include hazard reduction burning.
                               This is not required for this ROL nevertheless is good practice.

                     6.5. Construction Standards
                     The provision of a low threat separation of up to 20m, with access, and adjoining vegetation with fuel loads
                     of 20+tonnes/ha, confirm that proposed uses will be required to be constructed under AS3959-2018 to
                     Bushfire Attack Levels (BAL) of 29. Less for those lots with greater separation distances.



                     7. CONCLUSIONS
                     This report considers the bushfire mitigation measures required for 28 Eenie Creek Road, Noosaville,
                     described as Lot 3 on SP246584. The proposed extension of the previously approved development will
                     materially improve the bushfire safety for the entire precinct by increased access and management. The SPP
                     Hazard Mapping confirms the need for a set of mitigating actions to ensure the safety of people and property.
                     The details in section four of this Bushfire Management Plan confirm the capacity to comply with the current
                     Noosa Plan Natural Hazards Overlay Code.

                     Based on this assessment, a range of recommendations has been derived. In addition, it is significant to
                     note that bushfire remains a natural process which is endemic to the Australian bush and it remains subject to
                     a range of contributing factors which are variable on a daily and hourly basis. It is extremely difficult to
                     predict the behaviour and intensity of a fire event at any given time. Therefore, it remains of the upmost
                     importance that residents within identified bushfire prone areas obtain knowledge and remain aware of their
                     options in the event of a bushfire to ensure the preservation of both life and property.




                                                                                       Bushfire Planning Specialists | qldbushfireplanning.com.au
Document Set ID: 21753628
                  21426255
Version: 1, Version Date: 12/01/2022
                          24/03/2021
Log in to download the original file

Approved Plans OPW20_145.06.pdf · 88.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.