Original source · versioned page text
P2623.001L Tewantin Noosa RSL Stage 4, 5 & 6 RFI Response
Attached to the e-mail Response to Information Request MCU16/0079 (email 1 of 3).
MCU16/0079 Identification of those demarcation locations on a plan would also be of great benefit to the parking assessment. 14 Amended parking demand assessment based on design parking demands associated with the 800 person day level. 15 Amended proposal plans where necessary to address the amended parking demand assessment. Issue – Carparking Layout The proposed height clearance in the new basement carpark needs to be identified and assessed against the requirements of the AS/NZS 2890.1 – 2004. There needs to be an appropriate pedestrian route provided in the basement carpark to the lift providing access to the ground level foyer. Otherwise patrons will be encouraged to park in the street. The lift to the foyer needs to be provided in Stage 4. Information Required 16 Demonstrate the proposed carparking areas provide the following: (a) Height clearances in accordance with AS/NZS 2890.1 – 2004 (b) Appropriate pedestrian route(s) to the lift (c) Provision of the lift in Stage 4 Issue – Stormwater The submitted “Stormwater Layout Plan” does not include any collection of or treatment of stormwater runoff as required by the Water Sensitive Design Code. Council also has concerns with the proposed surcharge pit (adjacent to Pelican Street) and the potential impacts of surface runoff on the footpath area. Information Required 17 Provide comment and an amended plan (if required) demonstrating how the proposed stormwater layout achieves the specific outcomes of The Noosa Plan’s Water Sensitive Design Code. 18 Provide comment on the potential impacts of the surface runoff from the proposed surcharge pit (adjacent to Pelican Street) on the footpath area . Issue – Light Spill Night time light spillage from the development has not been addressed and could impact upon the amenity of nearby residential areas. Information Required 19 Provide a lighting report prepared by a suitably qualified person, which: (a) Details how light spillage from the development will be designed, sited, installed to comply with Table 2.1 & 2.2 of Australian Standard AS4282-1997 “Control of the obtrusive effects of outdoor lighting” and will not cause interference or an environmental nuisance with the night time amenity of the residential areas. (b) Demonstrates vehicle headlights will not cause nuisance to adjacent residents particularly at the new Doonella Street access. Page 6 of 7 Document Set ID: 20157503 Version: 1, Version Date: 08/09/2016 Print Date: 8 September 2016, 2:10 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (P2623.001L Tewantin Noosa RSL Stage 4, 5 & 6 RFI Response.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.