Original source · versioned page text
Minor Change Request (Planning Act 2016) 111 & 113 Gympie Terrace
Attached to the e-mail SUPESEDED - Change to DA - MCU16/0138.01.
Original PDF page 28, section 1. The text section number identifies this passage in the reader.
WORKPLACE HEALTH & SAFETY NOTES
DURING CONSTRUCTION LOOSE MATERIALS OR SMALL OBJECTS 6. HAZARDOUS SUBSTANCES ENCLOSED SPACES
Wherever possible, components for this building should be prefabricated 2. FALLING OBJECTS ASBESTOS For buildings with small spaces where maintenance or other
off-site or at ground level to minimise the risk of workers falling. During construction, renovation or demolition of this building, For alterations to a building constructed prior to 1990: access may be required:
However, if construction of this building requires workers to be working parts of the structure including fabricated steelwork, heavy If this existing building was constructed prior to: Some small spaces within this building will require access by
at heights where a fall in excess of two metres is possible and injury is panels and many other components will remain standing prior to 1990 - it therefore may contain asbestos construction or maintenance workers. The design
likely to result from such a fall. The builder must provide and maintain a or after supporting parts are in place. Contractors should 1986 - it therefore is likely to contain asbestos documentation calls for warning signs and barriers to
suitable barrier wherever a person is required to work in a situation ensure that temporary bracing or other required support is in either in cladding material or in fire retardant insulation material. unauthorised access. These should be maintained throughout
where falling more than two metres is a possibility. place at all times when collapse which may injure persons in the In either case, the builder should check and, if necessary, take the life of the building. Where workers are required to
a) WORKING AT HEIGHTS area is a possibility. appropriate action before demolishing, cutting, sanding, drilling or enter small spaces they should be scheduled so that access
1. FALLS, SLIPS, TRIPS Mechanical lifting of materials and components during otherwise disturbing the existing structure. is for short periods. Manual lifting and other manual activity
FLOOR FINISHES Specified construction, maintenance or demolition presents a risk of POWDERED MATERIALS should be restricted in small spaces.
If finishes have been specified by designer, these have been falling objects. Contractors should ensure that appropriate Many materials used in the construction of this building can cause SMALL SPACES
selected to minimise the risk of floors and paved areas becoming lifting devices are used, that loads are properly secured and harm if inhaled in powdered form. Persons working on or in the 8. PUBLIC ACCESS
slippery when wet or when walked on with wet shoes/feet. Any that access to areas below the load is prevented or restricted. building during construction, operational maintenance or demolition Public access to construction and demolition sites and to
changes to the specified finish should be made in consultation with BUILDING COMPONENTS should ensure good ventilation and wear Personal Protective areas under maintenance causes risk to workers and public.
the designer or, if this is not practical, surfaces with an equivalent 3. TRAFFIC MANAGEMENT Equipment including protection against inhalation while using Warning signs and secure barriers to unauthorised access
or better slip resistance should be chosen. For building on a major road, narrow road or steeply sloping road: powdered material or when sanding, drilling, cutting or otherwise should be provided. Where electrical installations,
FLOOR FINISHES By Owner Parking of vehicles or loading/unloading of vehicles on this disturbing or creating powdered material. excavations, plant or loose materials are present they should
If designer has not not been involved in the selection of surface roadway may cause a traffic hazard. During construction, TREATED TIMBER be secured when not fully supervised.
finishes, the owner is responsible for the selection of surface maintenance or demolition of this building designated parking for The design of this building may include provision for the inclusion 9. OPERATIONAL USE OF BUILDING
finishes in the pedestrian trafficable areas of this building. Surfaces workers and loading areas should be provided. Trained traffic of treated timber within the structure. Dust or fumes from this This building has been designed as a residential building. If it, at
should be selected in accordance with AS HB 197:1999 and AS/NZ management personnel should be responsible for the supervision material can be harmful. Persons working on or in the building a later date, it is used or intended to be used as a workplace,
4586:2004. of these areas. during construction, operational maintenance or demolition should the provisions of the Work Health and Safety Act 2011 or
STEPS, LOOSE OBJECTS AND UNEVEN SURFACES For building where on-site loading/unloading is restricted: ensure good ventilation and wear Personal Protective Equipment subsequent replacement Act should be applied to the new use.
Due to design restrictions for this building, steps and/or ramps are Construction of this building will require loading and unloading of including protection against inhalation of harmful material when RESIDENTIAL BUILDINGS
included in the building which may be a hazard to workers carrying materials on the roadway. Deliveries should be well planned to sanding, drilling, cutting or using treated timber in any way that 10.OTHER HIGH RISK ACTIVITY
objects or otherwise occupied. Steps should be clearly marked with avoid congestion of loading areas and trained traffic management may cause harmful material to be released. Do not burn treated All electrical work should be carried out in accordance with
both visual and tactile warning during construction, maintenance, personnel should be used to supervise loading/unloading areas. timber. Code of Practice: Managing Electrical Risks at the Workplace,
demolition and at all times when the building operates as a For all buildings: VOLATILE ORGANIC COMPOUNDS AS/NZ 3012 and all licensing requirements.
workplace. Busy construction and demolition sites present a risk of collision Many types of glue, solvents, spray packs, paints, varnishes and All work using Plant should be carried out in accordance with
Building owners and occupiers should monitor the pedestrian where deliveries and other traffic are moving within the site. A some cleaning materials and disinfectants have dangerous Code of Practice: Managing Risks of Plant at the Workplace.
access ways and in particular access to areas where maintenance is traffic management plan supervised by trained traffic management emissions. Areas where these are used should be kept well All work should be carried out in accordance with Code of
routinely carried out to ensure that surfaces have not moved or personnel should be adopted for the work site. ventilated while the material is being used and for a period after Practice: Managing Noise and Preventing Hearing Loss at Work.
cracked so that they become uneven and present a trip hazard. 4. SERVICES installation. Personal Protective Equipment may also be required. Due to the history of serious incidents it is recommended that
Spills, loose material, stray objects or any other matter that may GENERAL The manufacturer’s recommendations for use must be carefully particular care be exercised when undertaking work involving
cause a slip or trip hazard should be cleaned or removed from Rupture of services during excavation or other activity creates a considered at all times. steel construction and concrete placement. All the above
access ways. variety of risks including release of hazardous material. Existing SYNTHETIC MINERAL FIBRE applies.
Contractors should be required to maintain a tidy work site during services are located on or around this site. Where known, these Fibreglass, rockwool, ceramic and other material used for thermal or
construction, maintenance or demolition to reduce the risk of trips are identified on the plans but the exact location and extent of sound insulation may contain synthetic mineral fibre which may be
and falls in the workplace. Materials for construction or services may vary from that indicated. Services should be located harmful if inhaled or if it comes in contact with the skin, eyes or other
maintenance should be stored in designated areas away from access using an appropriate service (such as Dial Before You Dig), sensitive parts or the body. Personal Protective Equipment including
ways and work areas. appropriate excavation practice should be used and, where protection against inhalation of harmful material should be used when
DURING OPERATION OR MAINTENANCE necessary, specialist contractors should be used. installing, removing or working near bulk insulation material.
For houses or other low-rise buildings where scaffolding is appropriate: Locations with underground power:
Cleaning and maintenance of windows, walls, roof or other components of Underground power lines MAY be located in or around this site. TIMBER FLOORS
this building will require persons to be situated where a fall from a height All underground power lines must be disconnected or carefully This building may contain timber floors which have an applied finish.
in excess of two metres is possible. Where this type of activity is located and adequate warning signs used prior to any Areas where finishes are applied should be kept well ventilated during
required, scaffolding, ladders or trestles should be used in accordance construction, maintenance or demolition commencing. sanding and application and for a period after installation. Personal
with relevant codes of practice, regulations or legislation. Locations with overhead power lines: Protective Equipment may also be required. The manufacturer’s
For buildings where scaffold, ladders, trestles are not appropriate: Overhead power lines MAY be near or on this site. These pose a recommendations for use must be carefully considered at all times.
Cleaning and maintenance of windows, walls, roof or other components of risk of electrocution if struck or approached by lifting devices 7. CONFINED SPACES
this building will require persons to be situated where a fall from a height or other plant and persons working above ground level. Where Construction of this building and some maintenance on the
in excess of two metres is possible. Where this type of activity is there is a danger of this occurring, power lines should be, where building will require excavation and installation of items
required, scaffolding, fall barriers or Personal Protective Equipment practical, disconnected or relocated. Where this is not practical within excavations. Where practical, installation should be
(PPE) should be used in accordance with relevant codes of practice, adequate warning in the form of bright coloured tape or signage carried out using methods which do not require workers to
regulations or legislation. should be used or a protective barrier provided. enter the excavation. Where this is not practical, adequate
ANCHORAGE POINTS 5. MANUAL TASKS support for the excavated area should be provided to
Anchorage points for portable scaffold or fall arrest devices Components within this design with a mass in excess of 25kg prevent collapse. Warning signs and barriers to prevent
have been included in the design for use by maintenance workers. should be lifted by two or more workers or by mechanical lifting accidental or unauthorised access to all excavations should
Any persons engaged to work on the building after completion of device. Where this is not practical, suppliers or fabricators be provided.
construction work should be informed about the anchorage points. should be required to limit the component mass. EXCAVATION
b) SLIPPERY OR UNEVEN SURFACES All material packaging, building and maintenance components For buildings with enclosed spaces where maintenance or
Construction, maintenance or demolition work on or around this should clearly show the total mass of packages and where other access may be required:
building is likely to involve persons working above ground level or practical all items should be stored on site in a way which Enclosed spaces within this building may present a risk to
above floor levels. Where this occurs one or more of the following minimises bending before lifting. Advice should be provided on persons entering for construction, maintenance or any other
measures should be taken to avoid objects falling from the area safe lifting methods in all areas where lifting may occur. purpose. The design documentation calls for warning signs
where the work is being carried out onto persons below. Construction, maintenance and demolition of this building will and barriers to unauthorised access. These should be
1. Prevent or restrict access to areas below where the work is require the use of portable tools and equipment. These should maintained throughout the life of the building. Where
being carried out. be fully maintained in accordance with manufacturer’s workers are required to enter enclosed spaces, air testing
2. Provide toeboards to scaffolding or work platforms. specifications and not used where faulty or (in the case of equipment and Personal Protective Equipment should be
3. Provide protective structure below the work area. electrical equipment) not carrying a current electrical safety provided.
4. Ensure that all persons below the work area have Personal tag. All safety guards or devices should be regularly checked
Protective Equipment (PPE). and Personal Protective Equipment should be used in
accordance with manufacturer’s specification.
C COPYRIGHT The Drawing and the design depicted on this sheet remains the property of Icon Building design. Reproduction in part or whole is prohibited unless written permission is obtained from Icon Building Design. Plans are design for use on the job address specified in the titleblock only.
Revision Schedule Client Name: J & S Payne
Revision Number Revision Description Revision Date Issued by Project Address: No. 111 Gympie Terrace, Noosaville Sheet Number:17 Project Number:16-024
A WD 1.0 Prelim 29/05/2017 B.Hunt
Climate Zone: 2
B WD 1.1 Prelim 10/08/2017 B.Hunt
Wind Category: To engineers spec.
WPHS Notes
Phone: 0488209840
email: [email protected] Project Issue Date: 11/10/2017 Project Status: WD1.3 Scale: 1 : 100
website: www.iconbuildingdesign.com.au Checked/Signed By Director: Bradley Hunt Drawn By: BJH QBCC LIC# 126221
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.