Log in to see the plans as drawn Bushfire Hazard Assessment and Management Plan v2 NCES REF: J000545
Lot 2, 4 & 5 on RP172460 & Lot 7 on RP895754
66, 82 & 98 Coveys Rd & 39 Tinbeerwah Rd, Tinbeerwah
5 SPP BUSHFIRE RISK ASSESSMENT
5.1 General
A bushfire risk assessment for the site has been prepared generally in accordance with State
Planning Policy – State Interest Guideline – Natural Hazards, Risk and Resilience (DILGP, 2016)
and AS/NZS ISO 31000:2018 – Risk Management Methodology. The bushfire risk assessment
details the likelihood that the proposed new buildings will be exposed to bushfire smoke, ember,
radiant heat and/or flame attack considering the proximity to bushfire prone vegetation and likely
bushfire behaviour.
According to AS/NZS ISO 31000:2018, a ‘hazard’ is defined as a source of potential harm or a
situation with a potential to cause loss, whereas a ‘risk’ is the chance of something happening that
will have an impact on objectives measured in terms of consequences and likelihood. The State
Planning Policy – State Interest Guideline – Natural Hazards, Risk and Resilience (DILGP, April
2016) refers to ‘acceptable risk’, ‘tolerable risk’, and ‘intolerable risk’ which are defined below.
• Acceptable risk
o A risk that, following an understanding of the likelihood and consequences, is
sufficiently low to require no new treatments or actions to reduce risk further.
Individuals and society can live with this risk without feeling the necessity to reduce
the risks any further.
• Tolerable risk
o A risk that, following an understanding of the likelihood and consequences, is low
enough to allow the exposure to continue, and at the same time high enough to
require new treatments or actions to reduce risk. Society can live with this risk but
believe that as much as is reasonably practical should be done to reduce the risks
further.
• Intolerable risk
o A risk that, following an understanding of the likelihood and consequences, is so high
that it requires actions to avoid or reduce the risk. Individuals and society will not
accept this risk and measures are to be put in place to reduce risks to at least a
tolerable level.
5.2 Risk Assessment
The risk attributed to the hazardous vegetation within the assessment area and immediately beyond,
in the absence of additional mitigation measures being implemented, is detailed in Table 2 for Lot
12, Table 3 for Lot 8 and Table 4 for Lot 9.
Table 2 - Risk Assessment - Lot 12
Direction North/East South East West
Approx. minimum
distance to
40m >150m >150m 75m
hazardous
vegetation
VHC’s 8.1 N/A N/A 8.1
Attack Mechanism
Smoke* Not assessed Not assessed Not assessed Not assessed
Ember Intolerable Acceptable Acceptable Intolerable
Radiant Heat Intolerable Acceptable Acceptable Intolerable
Flame Tolerable Acceptable Acceptable Acceptable
Document Set © ID: 21828413
2022 19
Version: 1, Version Date: 21/02/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.