Council archive · source document
SUPERSEDEDNegotiated Decision Notice - Advice Agency - DNRW [As Published] · 132007.2399
2007/2399
Currency Period
12. The Development Permit for a Material Change of Use and Reconfiguring a Lot lapses if the
use has not commenced by 3 March 2013, unless an application to extend the currency is
approved by Council.
Land Development
Staging
13. The development may be undertaken in the following stages:
Stage 1 - Lots 8 & 9 as indicated on Proposal Plan M1806-10 dated 30 October 2007; and
Stage 2 - Lots 1 to 27, Access Easement and Common Property as indicated on Proposal
Plan M1806-11A dated 7 November 2007.
Plan Endorsement
14. In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal
documentation shall be presented to Council and shall be submitted in the correct form with
the fees prescribed in Council's adopted fee schedule.
15. Pursuant to Section 3.7.3(3)(b) of the Integrated Planning Act, all outstanding rates and
charges due and payable to Noosa Council in respect of the lots being reconfigured shall be
paid prior to endorsement of the Plan of Survey for each stage.
16. Prior to Council endorsement of the Plan of Survey for each Stage, a duly executed copy of
any required Grant of Easement shall be submitted to Council for perusal.
Any changes required by Council’s Solicitor shall be attended to prior to endorsing the Plan of
Survey.
Any necessary Titles Office forms requiring the consent of Council is to be submitted prior to
the endorsing of the Plan of Survey.
17. Prior to the endorsement of the Plan of Survey for each Stage, the Applicant's Solicitor shall
give Council's Solicitor an appropriate undertaking in writing that in conjunction with lodgement
of the Plan of Survey at the Land Titles Office, the Title Deed and the easement documents
will also be lodged and any additional Titles Office forms or requisitions requiring the consent
of Council being attended to forthwith.
18. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works, which shall be submitted in conjunction with an
application for a Development Permit for Operational Works.
19. Prior to Council endorsing the Plan of Survey for Stage 2, a certificate from a registered
Professional Civil Engineer shall be submitted to Council for each Development Permit for
Operational Works issued pursuant to this permit. The engineer shall certify that he has
supervised those works and that they have been completed in a workman like manner in
accordance with good engineering practice and in accordance with that permit.
A Development Permit for Operational Works covering landscaping must be obtained prior to
the commencement of any landscaping works.
20. Any alteration of a public utility or other facility necessitated by the development of the land or
associated construction works either internal or external to the site shall be at no cost to
Council.
Access Easement
21. An access easement shall be created over all of the proposed private roads/driveways within
the Precinct J. The proposed access easement in favour of Council for maintenance of the
sewer system shall be over the common property area shown on Proposal Plan M1806-11A
dated 7 November 2007.
5 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDEDNegotiated Decision Notice - Advice Agency - DNRW [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.