MCU15/0119 - Consolidated Concurrence Agency Response
Attached to the e-mail MCU15/0119 Concurrence agency response.
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn SDA-0116-027230
Aspects of development and type of approval being sought
Nature of Approval Brief Proposal of Level of
Development Type Description Assessment
Material Change of Development Commercial Business Type 1 Impact
Use permit – Office (Estate sales office) Assessment
Referral triggers
The development application was referred to the department under the following
provisions of the Sustainable Planning Regulation 2009:
Referral trigger Schedule 7, Table 3, Item 1 – State-controlled road (material
change of use)
Conditions
Under section 287(1)(a) of the Sustainable Planning Act 2009, the conditions set out in
Attachment 1 must be attached to any development approval.
Reasons for decision to impose conditions
Under section 289(1) of the Sustainable Planning Act 2009, the department must set out the
reasons for the decision to impose conditions. These reasons are set out in Attachment 2.
Approved plans and specifications
The department requires that the following plans and specifications set out below and in
Attachment 3 must be attached to any development approval.
Drawing/Report Title Prepared by Date Reference no. Version/Issue
Aspect of development: material change of use
Site Plan Palm Lake Works 21 October CO-SO-001, A
2015 Sheet 01/02
A copy of this response has been sent to the applicant for their information. For further
information, please contact Rebecca Taylor, Principal Planning Officer, SEQ North (Regional
Services) on 3882 8411, or email [email protected] and she will be pleased to
assist.
Yours sincerely
Garth Nolan
Manager (Planning)
cc: Palm Lake Works Pty Ltd, [email protected]
enc: Attachment 1—Conditions to be imposed
Attachment 2—Reasons for decision to impose conditions
Attachment 3—Approved Plans and Specifications
Department of Infrastructure, Local Government and Planning Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.