Skip to the record
Accept no imitations.

Original source · versioned page text

MCU15/0119 - Consolidated Concurrence Agency Response

Attached to the e-mail MCU15/0119 Concurrence agency response.

of 6

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                SDA-0116-027230

Aspects of development and type of approval being sought


       Nature of                   Approval                    Brief Proposal of             Level of
     Development                     Type                         Description              Assessment
   Material Change of            Development            Commercial Business Type 1       Impact
   Use                           permit                 – Office (Estate sales office)   Assessment

Referral triggers
The development application was referred to the department under the following
provisions of the Sustainable Planning Regulation 2009:
Referral trigger                  Schedule 7, Table 3, Item 1 – State-controlled road (material
                                  change of use)
Conditions
Under section 287(1)(a) of the Sustainable Planning Act 2009, the conditions set out in
Attachment 1 must be attached to any development approval.

Reasons for decision to impose conditions
Under section 289(1) of the Sustainable Planning Act 2009, the department must set out the
reasons for the decision to impose conditions. These reasons are set out in Attachment 2.

Approved plans and specifications
The department requires that the following plans and specifications set out below and in
Attachment 3 must be attached to any development approval.
Drawing/Report Title                    Prepared by                 Date        Reference no.   Version/Issue
Aspect of development: material change of use
Site Plan                        Palm Lake Works               21 October       CO-SO-001,      A
                                                               2015             Sheet 01/02

A copy of this response has been sent to the applicant for their information. For further
information, please contact Rebecca Taylor, Principal Planning Officer, SEQ North (Regional
Services) on 3882 8411, or email [email protected] and she will be pleased to
assist.

Yours sincerely




Garth Nolan
Manager (Planning)

cc:       Palm Lake Works Pty Ltd, [email protected]
enc:      Attachment 1—Conditions to be imposed
          Attachment 2—Reasons for decision to impose conditions
          Attachment 3—Approved Plans and Specifications




Department of Infrastructure, Local Government and Planning                                     Page 2
Log in to download the original file

MCU15_0119 - Consolidated Concurrence Agency Response.pdf · 430 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.