Development Application part 2 of 2 - Engineering Design Certificate Neighbourds Consent Plans 4 Stevens St Sunrise Beach · OPW10/2029

of 6

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 ff I 11 11111 1 1 1 111 M I i 111111111111

                                                                         Write code here           z !Z)C>             -1      L?\ ^-




   {^^^^°                         THIS IS THE NEXT PART OF A

  ti9 F                    MULTIPLE PART RECO
                                                                                                                                        Counter
                                                    Part 2 Of2
                                                                                                            I
                     Application number:                                                                                      .. ,,.ouch wore
                                                                                oP-ita 1?^
I 0RAMU3CS IAM INFORMATION MANAGEMENT,RECORDS MANAGEMENTConrro of Records EDRMSIMults Pan Record Cover Sheet NEXT PART, xis




                                                                                                     !Box: . J.57 \.
Full text of the other 5 pages

Page 2

J




             ENGINEERING DESIGN CERTIFICATE

    LOCAL AUTHORITY      : SUNSHINE COAST REGIONAL COUNCIL
    COUNCIL REFERENCE     : NONE-SEWER REPLACEMENT
    DEVELOPMENT ADDRESS :4 STEVENS STREET, SUNSHINE BEACH
    DRAWING NUMBERS     : GH1833/10/01 to 03
    DEVELOPER            : Mr PETER BOYS


    To the best of our knowledge and acting in good faith in accordance with the
    Institution of Engineers Australia code of ethics, we confirm that the
    Engineering design plans listed above have been prepared, within reason, in
    accordance with the requirements of the Sunshine Coast Regional Council
    operational works and planning policies, accepted Engineering best practice
    and current industry standards.

    In our opinion, we believe that our company is qualified in the relevant
    Engineering fields of expertise and practice to prepare the Engineering design
    plans listed above.

    In kind, we will not be held liable for any problems or liability issues that arise
    as a result of modifications or amendments to our Engineering design plans
    that alters the intent of our design that have been requested or directed by
    Council, other than as required by the development approval conditions
    (special wording only for SCRC-Maroochy).


    Signed:..... 1     ....     10 ............
    Larry Piggott ;RPEQ 3942
    Duly authorised representative
    for GREENHAVEN PROJECTS PTY LTD
    Professional Indemnity Insurance: Status current

Page 3

     Fr




23 July.2i► 10


Mrs P \1'oollarit
8 Stevens Sir'e.et
sunshine Reach 4567




To Whom It May Concern.
I herehr ,nve permission for Dr Peter Buys to organise removal of the existing seN%er
manhole and construct a rrcm, sewer main and manhole, including house connectiow in
my property at 8 Stevens Street. Sunshine Beach (Lot 697. RP 481 1 1 ) including an
eascawnt to cover saute for Council il'rcquired.
 I his mill require renmval and replacement of a section of fence at his expense.Excavation
%^ ill occur I'rortt his side of the dividing fence; and heavy equipment access mill not be
required through m} property.
At Be end of construction. I would require the ground surface disturbed by the sewer
«orl.5 adjacent to our common houndrv to be compacted. trimmed and turfed at the time.

Yours faithfully.




t\irs Pat \Voollam

Page 4

                                          PROPOSED SEWER RECONSTRUCT/ON
                                          4 STEVENS STREET, SUNSH/NE BEACH

                                                                                                                                                                                                                                                                                                  Lot 671                     Lot 6T3
                                                                                                                                                                                                                                                                                                  2PL8Pi                      RPi.e!I!




                                                                                                                                                                                                                                                                                                                                               S^!95t84
                                                                                                                                                                                                                                                                     --^ lot 676 ~--



                                                                                                                                                                                                                                                                                                                                           1

                                                                                                                                                                                                                                                                                                  Lot 697                        Lot 699       1
                                                                                                                                                                                                                                                                                                  PF<8t!I




                                                                                                                                                                     SCHEDULE OF DRAWINGS
                                                                                                                                                                      GH1839l1O/O1         LOCALITY AND SITE PLAN
                                                                                                                                                                      GH1839/1O/02         DETAIL PLAN
                                                                                                                                                                      GH1839/10/02         SEWER LONGITUDINAL SECTION                                                                                                                                                  A




                                                                                                                                                                     GREENHAVEN STANDARD SPECIFICATIONS                                                                                                           /
                                                                                                                                                                     Sunshine Coast Regional Council standards and
                                                                                        4:1L STSir'
                                                                                                                                                                     specifications have precedence over the. following.
                                                                                                                                                                       S.S.3     GENERAL CONCRETE WORKS                                                                                                                 SITE PLAN
                                                                                                                                                                       SSb       SEWERAGE                                                                                                                                 Scale 1:1250




    CO \STRUCT ION P:^T.1TJ_:L';'-h`,T PLAN                                                                                               tonn-med ass to Te sue S.pe-ur'crwr air d i.lea'^ng marked with a suitable barrier such as bunting tape and star pickets,              9. AIR QUALITY AND DUST CONTROL
                                                                                                                                          ear` e-- ies r.r s mean apart. ed Svs-err                                                                                                 The Connector wall lake suer m=ascres necessary to prevent dust nuisance arising from either macmnery movement on Site,
1 . EXISTING SERVICES
    The
     he :ontrvato- shad osrablish the location, line and level of all public and private uthty heroines pror to <ommencemenl of
                                                                                                                                       7. PROTECTION OF PUBLIC ACCESS                                                                                                               mend ac'^on, or a vombinahce o` both These measures may include, but not be limited to, water tankers fated with stay bars.
                                                                                                                                           the Contractor shall prepare traffic parking and pedestrian management plans where construction will impact on traff ic and              irrigation o` ground s.irraces, strateoc plawrenl of dust screen fencing, early seeding and tertd^smg of 'root trimmed and
    airy a. ons Trcjcfinn Where utility se-vices are shown on the plans, they
    d                                                                           are shown for the Information of the Contractor only
                                                                                                                                          pedestrians. "he plans shall be appropriate for the scale of theprolect and hierarch y cl assification of the read                        Icpsoiied earthworks areas acct the like
    The Principal shall not be liable for any omission of servic es from the plans or the accuracy of any services shown on the
   plans The Principal art the Superintendent shall not be liable for any damage caused to any utility services resulting from
                                                                                                                                          These plans shall address the following Minimum Issues                                                                                 10. HAZARDOUS SUBSTANCE MANAGEMENT
                                                                                                                                          a     procedures to minimise disruption to local Irattr, emergency vehicles, pedestrians and cyclists                                     Where substances Mal are rneacdous to the environment are stored on site, such as fuels, oils, poisons, cement and the bhe,
    the Contractors eoe(btion of the Contract works
                                                                                                                                          h    any traffic management changes                                                                                                       they shall ties-aced wdhm ;'enced compound on site A 300mm high edrlh bunt shall be f armed in a •U• shape around the
2. SURFACE LEVELS                                                                                                                         c    how construction s to be isolared from'rathc and pedest Gas                                                                          Icwer eerie and •wn Ties o' •ie compound Ic serve as a trap in the even) of a spillage or to capture the contents of burst
   Su•taee lees owe- the site have been m'erpolated through computer modelling of lied survey data These calculated levels
                                                                                                                                          d    address effects of local access to communities ant any adorning busnesses                                                            ronra.acrs O9 fuels- oils and the like shall be stared in sealed containers. The edge of the bond shall be sec within 2m of the
   riay vary `rvm the actual ground lever at the corresparmrg position on site Where motor narrations occur. they shall be
                                                                                                                                          e    notice to Council, ponce and emergency services                                                                                      compound area
   ^elered'ii the Supemmendent far further consideration where such variation alit cause major problems with constructing
                                                                                                                                          f    ensure emergency vehicle access to site's available at all limes                                                                  11.LIGHT MANAGEMENT
   tire project in accordance with approved plans. or necessitate variations to the Contract price.
                                                                                                                                          g    nonce to Inca) mmaiunity, schools, hospitals and local businesses                                                                    No nigh) lime opeeat.ens are permitted unless approval has peen obtained from the Local Authority.
3. SURVEY REFERENCE                                                                                                                       h    any regwrement for police control
    All constriction levels shall he set by the Contractor with reference to surveyed slakes and surveyed bench marks provided
                                                                                                                                                                                                                                                                                 12.NOISE CONTROL
                                                                                                                                          i    where sitb-contractors a-e to park and any changes ro existing parking                                                               Nu work '..dl :re permuted on the site out side the hours of 7.00am Io b OCpm, Monday to Saturday, excluding Public Holidays,
    by the P"irGpal'c apps riled surveyors The Contractor shall protect all survey stations, setout slakes and permanent survey
                                                                                                                                       8. PROTECTION OF EXISTING INFRASTRUCTURE                                                                                                     rules: app-omal sus been ob^arred by the Local Authorry Excavations ie rack may require tack hammering, however, blasting
   pegs or marks or or adjacent to fhe development site
                                                                                                                                          a    Tie Con'rarr soo t bho'ograph and locomen aois-.ng rJ'mlructore or public utility heroics That may be damaged as                     .talc bee las' rsort arc per.mss...or wool! be obtained from the Local Autho`itv'o-such rank
4. CONTACT DETAILS                                                                                                                             a re=al' of the rons'-udicr woks Ptiotographs ,rst inc _de dates and shall be made available upon Countifs request
   SUPERIN-ENDSNI - Greenhaven Projects - contact details as shown m title Stock of these design plans                                                                                                                                                                           13. WASTE MANAGEMENT
                                                                                                                                          b    Tne Contractor shall be paole Car any oamaye lu eoistroc mtrastrucfure or public utility services that are actually
                                                                                                                                                                                                                                                                                    A,I waste naterais q-ere-ated on site shall be stored in sudahle bins and containers tilted with suitable lids to exclude
   COfITTAEDP - hot yen appointed Contact details 1o be confirmed at prestart meeting                                                          damaged as a result of the consrrucnon works                                                                                         rainwater, and ampoec when fuJ by dsposal at a regulated waste disposal tip Burying waste materials on site is not
5. FLORA AND FAUNA                                                                                                                             Specific infrastructure or public utility services tho' have to be moddied, realigned or changed will be included on the             permit ed
   There a-a no threatened or endangered fauna species on site                                                                                 Enaineermg design plans
                                                                                                                                                                                                                                                                                 14. EROSION AND SEDIMENT CONTROL (ESOP)
6. CLEARING                                                                                                                               d    Modficat^ons to Electrical, Tetsuo, bas or the like utility services will require liaison and approval from Ike respective
                                                                                                                                                                                                                                                                                    The CSCP tar Iris pro le(I is nctudec r. this design as listed on this drawing,
    -he :onha;lar wall comply with any Local Authority and Forestry Department reym.a'mns or regmrements during the                            dilily service authority.
   vegelatici r,ear'^q opera' on All other vegetation shall be chipped for mulch which is ro be spread on site to support                 e    In the event of accidental damage to any existing ut lily ser,rce by the Contractor, fhe Contractor shall organise such
                                                                                                                                                                                                                                                                                 15.RECYCLING (WASTE MINIMISATION)
                                                                                                                                                                                                                                                                                    Cleared inate'ial shalt be Gipped for nut ct as speulied above
   siege aticn cr to stabilise earthwork batters Open burning or pd burning will riot be allowed laterlals that cannot be                      repass and cover all necessary (ohms associated wi-h the damages
   chipped for mulch shall be removed from site to a regulated waste disposal liu Any erdusion cones for this piglet' will be




                                                                                                                                                                                                                                                                                                                                                                          10   5   0        10      20          30        40        50 m
                                                                                                                                                                                                                                                                                                                                                                                                                 I                   I
                                                                                                                                                                                                                                                                                                                                                                                                 t .1250-A3

                                                                                                                                                                                                                                                                                                CLIENT: MR. P BCYS
                         Greenhaven Proo^ects
                             consulting Civil engineers. project managemen services
                                                                                                                                       Dale                             Amendment
                                                                                                                                                                                                                    Design:       D G K.                        APPROVED                                                                                                                                 COUNCILREFERENCE.

                                                                                                                                                                                                                    Drawn:        D G.K.                                                        PROJECT:. PROPOSED SEWER RECONSTRUCTION
                                          Ply. Ltd, ABN 68 067 110 169                                                                                                                                                                                   x r,.
                                  P.O. Box 8200, Maroochydore D C QLD 4558                                                                                                                                          Date          26(0712010                                                    AT: 4 STEVENS STREET, SUNSHINE BEACH                                                                     Slieel       t    of   3
                                                                                                                                                                                                                                                      LARRY PI               - R EQ 3942
                                   Phone(07)54794220 Fax(07)54794228                                              MEMBER OF THE
                     THIS PLAN IS COPY PROTECTED BY GREENHAVEN PROJECTS PTY. LTD.
                                                                                                                   INSTITUTE OF                                                                                     Checked:      L.P.                  DATE.         •^^r       ^Q               LOT 698 ON SP227987                                                                                           DRAWING No:
                                                                                                                    MUNICIPAL

        u   .v ed.mg rerE our 'e     en[f'S.
                                                                                                                   ENGINEERING
                                                                                                                    AUSTRALIA
                                                                                                                                                                                                                     Datum:       A.N.D.                SZE                 A3                  TITLE: LOCALITY AND SITE PLANS                                                                           GH 1839110/01

Page 5

                                                                                                                           Evistrng u GUse
                                                                                                                                                                                                                                                                                          CONSTRUCTION METHODOLOGY STATEMENT
                                                                                                                                                                                 Lot 673                                                                                             NOTE: THE EXISTING SEWER MAIN THAT HAS TO BE REPLACED DOES NOT HAVE ANY
                                                                                                                                                                                                                                                                                     LIVE CONNECTIONS DISCHARGING INTO IT.
                                                                       Lot 675                                                                                                   RP48111
                                                                       RP4 8111                                                                                                                                                                                                      1.   Conform with the construction management plan on these Engineering design
                                                                                                                           ^6 4                                                                                                                                                           plans
                                                                                                         Turf or                      Existing shed
                                                                                                         hydromulch                                                                                                                                                                  2. Attend presfart meeting with Unity Water and seta commencement date for
                                                                                                                                     to be removed
                                                                                                                                                                                                                                                                                        construction.
                                                                                                         dintrubed                                           ,-Terminate enveloping pipe 1.0 from R.P.
                                                                                                         ground areas.                                                                                                                                                               3. Advise neighbouring property owners of the construction commencement date.
                                                                                                                                                                 boundary to enable HCB to be installed                              Existing sewer manhole will
                                                                                                                                                                                                                                                                                     4. Complete preparation works including clearing, grubbing and setout, stabilise
                                                                                                                                                                                                                                     have to be exposed, as it is
                                                                                                                                                                                                                                                                                        existing fencing panels where necessary,
                                                                                                          10m'i                                                                                                                      currently not accessible
                                                                                                                                                                                                                                                                                     5.   At least one day prior to the commencement of construction, ensure that all
                                                                                                                                                                                                                                     Location and levels plotted
                                                                                                                                                                                                                                                                                          materials necessary to complete construction have been delivered to site. The
                                                                                                                                                                                                                                     from Council records. Prior
                                                                                                                                                      ^ ,^                                                                                                                                materials shall include, but not be limited to the following,-
                                                                                                                           Zhg_^                                                                                                     to construction confirm
                                                                                                                                                                                                                                                                                          aManhole components including manhole lid & sanded shorts.
                                                           Remove existing sewer manhole and                                                                                                                                         exact invert levels and
                                                                                                                                                                                                                                                                                          b. Bedding materials la small quantity of 2000 screenings and geof abric should
                                                           construct terminal access chamber                                                                    Existing to shaft to                                                 confirm pipe gradient.
                 Lot 676                                                                                                                                                                                                                                                                     be available at the Contractor's depot in the event that unsuitable material is
                                                           1600 dia, Poo Pit) or approved                                                                       (eve) to be removed
                SP 125656                                                                                                                                                                                                                                                                    encountered at the base of the trench).
                                                           equivalent. Replace existing HCB's                                                                                                                                                                                             c. Enveloping pipe, sewer pipe, jointing materials, spacers and fixing tape.
                                                           to serve existing lots.
                                                                                                          Remove existing 150m^ -                                                                                                                                                    6.  Prior to the commencement date of construction, Install the new sewer main
                                                                                                          sewer and replace with                                                                                                                                                         inside the enveloping pipe and stack on site in a suitable location to enable
                                                                           Existing timber lean tc       -1500 SN8 uPVC pipe
                                                                                                                                                                                                                                                               Lot 1                     expedient placement in the excavated trench. Seal off the ends of the pipes with
                                                                                                          inside 2500 ductile iron                                                                                                                           SPW 6184                    plastic and duct tape, ready for jointing the next day.
                                                                                                          enveloping pipe at new                                                                                                                                                     1. Have on hand a suitable trench de-watering pump including a spare pump in case
                                                                                                          levels.                                                                                                                                                                        it is required. Ensure both pumps are fuelled and in good working order the day
                                                                                                                                                                                                                                                                                         before commencement of construction.
                                                                                                                                                                                                                                                                                     8. Excavate for the proposed sewer manhole and expose the existing sewer
                                                                                                                  fxstrnggravel^^
                                                                                                                                                                                                                                                                                         pipeline Mark the cut lines.
                                                                                                                  dr;veway                                                                                                                                                           9. Excavate trench as far as excavator can travel commencing al the downstream
                                                                                                                                                                                                                                                                                         end and install the new sewer pipeline and enveloping pipe guided by the laser in
                                                                                                     i                                                   0                                                                                                                               MH Exit Assess the need far de-watering and possibility of unsuitable at the
                                                                                                                                                                                                                                                                                         trench base.
                                                                                                                                                                                          Lot 699                                                                                    10. Utilise a bobcat or similar equipment to temporarily place and stockpile material
                                                                                                                            Lot 698                                                       RP48111                                                                                        excavated from the trench, to place bedding material and to assist with
                                                                     Lot 697
                                                                                                                          SP227987                                                                                                         1                                             backfilling trenches to ground level,
                                                                     RP48111                                                                                                                                                                                                         11. Once the first section of trench has been backfilled, rotate the excavator and
                                                                                                                                                                                                                                               1                                         trench from the upstream manhole back to meet the newly installed sewer main
                                                                                                                                                                                                                                                                                         and enveloping pipe
                                                                                                                                                                                                                                                   1                                 12. Complete the connection of the new sewer main to the upstream sewer manhole.
                                                                                                                                                                                                                                                                                     13. Backfill the last section of the trench.
                                                                                                                                                                                                                                                                                     16 Pressure test the new sewer pipeline.
                                                                                                                                                                                                                                                                                     15 Complete the new sewer manhole and pressure test, grout annulus between new
                                                                                                                                                                                                                                                                                         sewer pipe and enveloping pipe.
                                                                                                                                                                                                                                                                                     16. Upon approval from Unity Water, remove downstream bung.
                                                                                                                                                                                                                                                                                     17. Remove old sewer pipes from site to a regulated waste facility.
                                                                                                                                                                                                                                                                                     18. Remove surplus spoil from site, reinstate any boundary fences and restore the
                                                                                                                                                                                                                                                                                         existing ground surface.




                                                                                                                                  R.P 8dy




                                                STEVENS STREET
                                                                                                                                                                                                                                           Existing sewer manhote-
                                                                                                                                                                                                                                           SL2657
                                                                                                                                                                                                                                           ,124 47
                                                                                                                                                                                                                                           d=210




                                                                                                                                                                                                                                                                                                                        5        2.5       0        2.5       5           7.5            ltm


                                                                                                                                                                                                                                                                                                                                                 1 250-A3


                                          Greenha yen Projects                                                                               Dale                Amendment
                                                                                                                                                                                                     Design:    D.G.K.                     APPROVED                  CLIENT:   MR. P BOYS                                                                   COUNCILREFLR[NCE.


        Gi                                       consulting civil engineers project managemen services
                                                              Pty Ltd. ABN 68 067 110 169
                                                     P.0 Box 8200, hlarooc/Vdore D.C OLD 4558
                                                       Phone (07) 5479 4220 Fax (07) 5479 4228                     MEMBER OF THE
                                                                                                                                                                                                     Drawn:
                                                                                                                                                                                                     Date
                                                                                                                                                                                                     Checked:
                                                                                                                                                                                                                D.G.K.
                                                                                                                                                                                                                2 610 712 0 1 0
                                                                                                                                                                                                                                  LARRY PICT
                                                                                                                                                                                                                                               n
                                                                                                                                                                                                                                                                     PROJECT: PROPOSED SEWER RECONSTRUCTION
                                                                                                                                                                                                                                                                     AT: 4 STEVENS STREET, SUNSHINE BEACH                                                    Sheet    2         of   3

                                       THIS PLAN IS COPY PROTECTED BY GREENHAVEN PROJECTS PTY. LTD
                                                                                                                    INSTITUTE OF                                                                                L.P.               DATE.                               LOT 698 ON SP227987                                                                        DRAWING Na:
                                                                                                                     MUNICIPAL
                                                                                                                    ENGINEERING
IAurUA5 HI rNAME Gw18a9-et-aIarg-DATE 26/irla      xREFs                                                             AUSTRALIA                                                                       Datum.     A.N.D.             SIZE                A3            TITLE: DETAIL PLAN                                                                     GH1839/10/02

Page 6

                         FS!
                                                                                                                                                                                                                                                                     PRESSURE TESTING IN ACCORDANCE
                                                                                                                                                                                                                                                                           WITH MSC STANDARDS

                                                                                                                                                                                                                                                                     DEPTH RANGE OF SEWER                  0 - 3.Om          GREATER THAN 3.Om
                                                                                                                                                                                                                                                                     INITIAL PRESSURE IKpal                    35                       50
                                                                                                                                                                                                                                                                     TEST START PRESSURE )Kpa)                 30                       45
       Install 1500 UPVC pipe                                                                                                                                                                                                                                        MAIN SEWER DIAMETER (mm)                150       225        300   375      450
       Inside 2500 enveloping
       pipe with spacers at                                                                                                                                                                                                                                          MIN. TIME TO DROP S Kpa               3 M'm. 3 Min.      5 Min. 8 M'm. 10 Min.
       1.Sm maximum centres



                                            TRENCH DETAIL
                                                        N.T.S.
                                                                                                                                                                                                                                                   SEWER RETICULATION NOTES
                                                                                                                                                                                                                                                   l    Unless shown otherwise:-
                                                                                                                                                                                                                                                              a. All gravity sewers shall be 150mm diameter uPVC Class SN8 R.J.J. to AS 1260 in
                                                                                                                                                                                                                                                                   3.Om maximum lengths lu.n.o.l.
                                                                                                                                                                                            E    }
                                                                                                                                                                                                 s
                                                                                                                                                                                                                                                              b. Ductile cement lined (DICE/ pipe incorporated in the sewer pipelines shall be
                                                                                                                                                                                              `a
                                                                                                                                                                                              a o
                                                                                                                                                                                                                                                                   minimum class DILL Extreme
                                                                                                                                                                                            i E
                                                                                                                                                                                              m a                                                              c . Stormwater pipe crossings shall be uPVC Class 12 for full width of crossing
                                                                                                                                                                                            9
                                                                                                                                                                                            a    ,R                                                                plus 1,5m either side. Spigot ends of Class 12 to be chamfered to provide a
                                                                                                                                                                                            p   ^ V                                                                   smooth transition of flows.
                                                                                                                                                                                              v o
                                                                                                                                                                                            o ^ o                                                              d.     Sewer mains shall be constructed in accordance with WSA Std. Dwg. Series
                                                                                                                                                                                            am`D                                                                      SEW-1200.
                              MANHOLE No.
                              AND TYPE                                                                                                                                                                                                             2 Minimum pipe grades shall be -
                                                                                                                                                                                                                                                           1500 pipe - 1 in 150; 2250 pipe - 1 in 290; 3000 pipe -1 in 420.

                                                                                                                                                                                                                                                   3.   Where gravity or rising sewer mains conned into existing sewer mains, the contractor
                                                                                                                                                                                                                                                        shall verify the designed location and level of the point of connection prior to
                                                                                                                                                                                                                                                        commencement of any construction.

                                                                                                                                                                                                                                                   4. Bedding material for pipelines to be washed 5mm screenings and
                                                                                                                                                                                                                                                      shall be placed in accordance with MSC Std. Dwg. MWD100,
                                                                                                                                                                                                                                                              Sewer pipe line bedding shall be compacted to the following                      denslty-
                                                                                                                                                 Existing 150 die, sewer                                                                                      a. Crusher grit ..,...,..90% R.D D. standard compaction
                                                                                                                                                 main to be removed.-,                                                                                        b. Sand ......................_....65% density index.

                                                                                                                                                                                                                                                   5. Minimum cover to uPVC Class SN8 pipe collars shall be:-
                                                                                            End enveloping pipe 1.Om back                                                                                                                                  a, Allotments and footpaths .....0.9m
       *Existing sewer manhole will have to be exposed, as it--I 1                          from property boundary to                                                                                                                                      b. Road crossings.... 1.2m or 0-6m if Class 18 uPVC from MH to MH
         is currently not accessible. Location and levels                                   enable HCB to be installed.-^
         plotted from Council records. Prior to construction                                                                .^                                                                             Replace existing HCB's
                                                                                                                                                                                                                                                   6. Standard sewer alignments are-
         confirm exact invert levels and confirm pipe gradient.                                                                  V                                                                         to serve existing lots,
                                                                                                                                                                                                                                                            a. Side boundary ....._....._ .....................1.Om.
                                                                                                                                                                                                                                                            b. Front & rear boundary ...............1.Sm.
                                                                                                                                                                                                      End enveloping pipe at
                                                                                                                                                                                                      property boundary                            7.   Sewer manhole construction:-
                                                                                                                                                           x-1500 UPV C solvent weld or                                                                       a. All manholes shall be finished with tops parallel to and  approximately 10000
                                                                                              Install HCB for Lot 698.                                       rubber ring jointed sewer                                                                           above finished ground level.
                                                                                                                                                             pipe SN8 inside 2500 ductile                                                                     b. Cast insitu manholes shall be formed with external formwork.
                                                                                                                                                             iron enveloping pipe. Cement                                                                     c. All manholes shall be properly sealed to prevent ingress of subsoil & surface
                                                                                                                                                             grout annulus between pipes.                                                                        waters.
                                                                                                                                                                                                                                                                d. Manholes shall be constructed in accordance with the WSA Std. Dwg. Series
                                                                                                                                                                                                                                                                   SEW-1300.
                                                                                                                                                                                                                                                                e.    Backdrops shall be constructed in accordance with WSA Std. Dwg. Series
                                                                                                                                                                                                                                                                      SEW-1300.

                                                                                                                                                                                                                                                   8. House connections:-
                             DATUM RL 23.0                                                                                                                                                                                                                  a. All allotments shall be provided with a house connection unless directed
                                                                                                                                                          Lot 698 SP227987                        Lot 697 RP48111                                              otherwise.
                                                                                          Lot 699 RP48111
                             LOCATION                                                                                                                                                                                                                           b. House connections shall be 100mm diameter upvc and installed in accordance
                                                                                                                                                                                                                                                                   with MSC. Std. Dwgs. MWD125 &130.
                                                                                                                         0150 SN8 PVC
                              DIAMETER                                                                                                                                                                                                                          c. House connections on sewer mains greater than 2 Om deep shall be fibreglass
                                                                                                                                                                                                                                                                   reinforced "sugden" or similar approved type junctions,
                                                                                                0.38.                                                             0.38%                                                                                               House drain Inspection openings shall be installed to 1,5m maximum depth below
                              GRADE                                                                                                                                                                                                                             d.
                                                                                             * 262,61                                                           * 262.67
                                                                                                                                                                                                                                                                      finished ground level.
                                                                                                31.52                                                              31.22                                                                                        e. House drains shall be extended to a minimum of 1.Om beyond any existing or
                               LENGTH                                                                                                                                                                                                                              proposed stormwater pipe crossings.
                                                                                                                                                                                                                                                                f.    Ends of house drain connections shall be identified by a 2.Om long x 25mm$
                               DEPTH                                                                                                                                                                                                                                  length of orange conduit placed vertically above pipe end.


                               INVERT LEVEL                                                                                                                                                                                                        9. Concrete stops are required on grades steeper than 1 in 6 and shall
                                                                                                                                                                                                                                                      be placed in accordance with WSAA SEW-1206.

                               SURFACE LEVEL                                                                                                                                                                                                       10 All connections to existing sewers will be completed by Sunshine Coast Regional Council
                                                                                                                                                                                                                                                      at developer's expense.

                               CHAINAGE



                                                                                                                                                                                                                                                                                                                              5          2.5           0   5           100       1:250•A3
                                                                                SEWER LONGITUDINAL SECTION
                                                                                              Scale H 1:250 V 1.50
                                                                                                                                                                                                                                                                                                                              1          0.5           0   1           2m        1' 50-A3


                                                                                                                                                                             Amendment                                                        APPROVED                      CLIENT MR. P BOYS                                                                  COUNCIL REFERENCE.
                                            Greenhayen Prot jects
                                                 consulting civil engineers • project managemen services
                                                                                                                                     No   Date
                                                                                                                                                                                                              Design:

                                                                                                                                                                                                              Drawn:
                                                                                                                                                                                                                         D.G.K.
                                                                                                                                                                                                                         D.G.K.                                             PROJECT PROPOSED SEWER RECONSTRUCTION
                                                               Pty. Ltd. ABN 68 067 110 169
                                                                                                                                                                                                              Date:      26107/2010                                         AT: STEVENS STREET , SUNSHINE BEACH                                                Sheet        3   of   3
                                                       P.O. Box 8200, Maroochydore D.C. OLD 4558                                                                                                                                      LARRY PIGt H r - RPEQ 3942
                                                                                                              MEMBER OF THE                                                                                                                        J
                                                        Phone (07) 5479 4220 Fax (07) 5479 4228                                                                                                               Checked-   L.P.                7L                                 LOT 698 ON SP227987                                                                DRAWING Na:
                                                                                                               INSTITl1TE OF                                                                                                           Dare    "/•      •-^? ••
                                         THIS PLAN IS COPY PROTECTED RY GREENHAVEN PROJECTS PTY. LTD.            MUNICIPAL
                                                                                                               ENGINEERING                                                                                    Datum.      A.H.D.       SIZE        A3                       TITLE:    SEWER LONGITUDINAL SECTION                                               G H 1839110103
161;rc(n11'Ii 66666.1H1Pa;-0=s^yn 6a:ed.g-D4'E 266)10   XREFS                                                   AUSTRALIA

Used in these records

About this file

File size
2.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 2 of 2 - Engineering Design Certificate Neighbourds Consent Plans 4 Stevens St Sunrise Beach.pdf · 2.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.