Council archive · source document
Development Application part 2 of 2 - Engineering Design Certificate Neighbourds Consent Plans 4 Stevens St Sunrise Beach · OPW10/2029
Plans and drawings: the text below has words only, no drawings.
PROPOSED SEWER RECONSTRUCT/ON
4 STEVENS STREET, SUNSH/NE BEACH
Lot 671 Lot 6T3
2PL8Pi RPi.e!I!
S^!95t84
--^ lot 676 ~--
1
Lot 697 Lot 699 1
PF<8t!I
SCHEDULE OF DRAWINGS
GH1839l1O/O1 LOCALITY AND SITE PLAN
GH1839/1O/02 DETAIL PLAN
GH1839/10/02 SEWER LONGITUDINAL SECTION A
GREENHAVEN STANDARD SPECIFICATIONS /
Sunshine Coast Regional Council standards and
4:1L STSir'
specifications have precedence over the. following.
S.S.3 GENERAL CONCRETE WORKS SITE PLAN
SSb SEWERAGE Scale 1:1250
CO \STRUCT ION P:^T.1TJ_:L';'-h`,T PLAN tonn-med ass to Te sue S.pe-ur'crwr air d i.lea'^ng marked with a suitable barrier such as bunting tape and star pickets, 9. AIR QUALITY AND DUST CONTROL
ear` e-- ies r.r s mean apart. ed Svs-err The Connector wall lake suer m=ascres necessary to prevent dust nuisance arising from either macmnery movement on Site,
1 . EXISTING SERVICES
The
he :ontrvato- shad osrablish the location, line and level of all public and private uthty heroines pror to <ommencemenl of
7. PROTECTION OF PUBLIC ACCESS mend ac'^on, or a vombinahce o` both These measures may include, but not be limited to, water tankers fated with stay bars.
the Contractor shall prepare traffic parking and pedestrian management plans where construction will impact on traff ic and irrigation o` ground s.irraces, strateoc plawrenl of dust screen fencing, early seeding and tertd^smg of 'root trimmed and
airy a. ons Trcjcfinn Where utility se-vices are shown on the plans, they
d are shown for the Information of the Contractor only
pedestrians. "he plans shall be appropriate for the scale of theprolect and hierarch y cl assification of the read Icpsoiied earthworks areas acct the like
The Principal shall not be liable for any omission of servic es from the plans or the accuracy of any services shown on the
plans The Principal art the Superintendent shall not be liable for any damage caused to any utility services resulting from
These plans shall address the following Minimum Issues 10. HAZARDOUS SUBSTANCE MANAGEMENT
a procedures to minimise disruption to local Irattr, emergency vehicles, pedestrians and cyclists Where substances Mal are rneacdous to the environment are stored on site, such as fuels, oils, poisons, cement and the bhe,
the Contractors eoe(btion of the Contract works
h any traffic management changes they shall ties-aced wdhm ;'enced compound on site A 300mm high edrlh bunt shall be f armed in a •U• shape around the
2. SURFACE LEVELS c how construction s to be isolared from'rathc and pedest Gas Icwer eerie and •wn Ties o' •ie compound Ic serve as a trap in the even) of a spillage or to capture the contents of burst
Su•taee lees owe- the site have been m'erpolated through computer modelling of lied survey data These calculated levels
d address effects of local access to communities ant any adorning busnesses ronra.acrs O9 fuels- oils and the like shall be stared in sealed containers. The edge of the bond shall be sec within 2m of the
riay vary `rvm the actual ground lever at the corresparmrg position on site Where motor narrations occur. they shall be
e notice to Council, ponce and emergency services compound area
^elered'ii the Supemmendent far further consideration where such variation alit cause major problems with constructing
f ensure emergency vehicle access to site's available at all limes 11.LIGHT MANAGEMENT
tire project in accordance with approved plans. or necessitate variations to the Contract price.
g nonce to Inca) mmaiunity, schools, hospitals and local businesses No nigh) lime opeeat.ens are permitted unless approval has peen obtained from the Local Authority.
3. SURVEY REFERENCE h any regwrement for police control
All constriction levels shall he set by the Contractor with reference to surveyed slakes and surveyed bench marks provided
12.NOISE CONTROL
i where sitb-contractors a-e to park and any changes ro existing parking Nu work '..dl :re permuted on the site out side the hours of 7.00am Io b OCpm, Monday to Saturday, excluding Public Holidays,
by the P"irGpal'c apps riled surveyors The Contractor shall protect all survey stations, setout slakes and permanent survey
8. PROTECTION OF EXISTING INFRASTRUCTURE rules: app-omal sus been ob^arred by the Local Authorry Excavations ie rack may require tack hammering, however, blasting
pegs or marks or or adjacent to fhe development site
a Tie Con'rarr soo t bho'ograph and locomen aois-.ng rJ'mlructore or public utility heroics That may be damaged as .talc bee las' rsort arc per.mss...or wool! be obtained from the Local Autho`itv'o-such rank
4. CONTACT DETAILS a re=al' of the rons'-udicr woks Ptiotographs ,rst inc _de dates and shall be made available upon Countifs request
SUPERIN-ENDSNI - Greenhaven Projects - contact details as shown m title Stock of these design plans 13. WASTE MANAGEMENT
b Tne Contractor shall be paole Car any oamaye lu eoistroc mtrastrucfure or public utility services that are actually
A,I waste naterais q-ere-ated on site shall be stored in sudahle bins and containers tilted with suitable lids to exclude
COfITTAEDP - hot yen appointed Contact details 1o be confirmed at prestart meeting damaged as a result of the consrrucnon works rainwater, and ampoec when fuJ by dsposal at a regulated waste disposal tip Burying waste materials on site is not
5. FLORA AND FAUNA Specific infrastructure or public utility services tho' have to be moddied, realigned or changed will be included on the permit ed
There a-a no threatened or endangered fauna species on site Enaineermg design plans
14. EROSION AND SEDIMENT CONTROL (ESOP)
6. CLEARING d Modficat^ons to Electrical, Tetsuo, bas or the like utility services will require liaison and approval from Ike respective
The CSCP tar Iris pro le(I is nctudec r. this design as listed on this drawing,
-he :onha;lar wall comply with any Local Authority and Forestry Department reym.a'mns or regmrements during the dilily service authority.
vegelatici r,ear'^q opera' on All other vegetation shall be chipped for mulch which is ro be spread on site to support e In the event of accidental damage to any existing ut lily ser,rce by the Contractor, fhe Contractor shall organise such
15.RECYCLING (WASTE MINIMISATION)
Cleared inate'ial shalt be Gipped for nut ct as speulied above
siege aticn cr to stabilise earthwork batters Open burning or pd burning will riot be allowed laterlals that cannot be repass and cover all necessary (ohms associated wi-h the damages
chipped for mulch shall be removed from site to a regulated waste disposal liu Any erdusion cones for this piglet' will be
10 5 0 10 20 30 40 50 m
I I
t .1250-A3
CLIENT: MR. P BCYS
Greenhaven Proo^ects
consulting Civil engineers. project managemen services
Dale Amendment
Design: D G K. APPROVED COUNCILREFERENCE.
Drawn: D G.K. PROJECT:. PROPOSED SEWER RECONSTRUCTION
Ply. Ltd, ABN 68 067 110 169 x r,.
P.O. Box 8200, Maroochydore D C QLD 4558 Date 26(0712010 AT: 4 STEVENS STREET, SUNSHINE BEACH Slieel t of 3
LARRY PI - R EQ 3942
Phone(07)54794220 Fax(07)54794228 MEMBER OF THE
THIS PLAN IS COPY PROTECTED BY GREENHAVEN PROJECTS PTY. LTD.
INSTITUTE OF Checked: L.P. DATE. •^^r ^Q LOT 698 ON SP227987 DRAWING No:
MUNICIPAL
u .v ed.mg rerE our 'e en[f'S.
ENGINEERING
AUSTRALIA
Datum: A.N.D. SZE A3 TITLE: LOCALITY AND SITE PLANS GH 1839110/01
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 of 2 - Engineering Design Certificate Neighbourds Consent Plans 4 Stevens St Sunrise BeachRelated documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.