Decision Notice - Minor Change - MCU21 0027 02 & OPW21 0047 02 [As Published] · MCU21/0027.02
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 15 May 2023, unless an application to extend the currency period is
approved by Council.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
3. All necessary approvals from external service providers (e.g. Unitywater) and external parties
on which the development works are proposed have been obtained and a copy supplied to
Council.
4. A condition report of the drainage system must be completed and submitted to council prior
to the prestart meeting. The condition report is to include:
a. a CCTV inspection of the pipe section between the existing eastern most pit on the
subject site (to be retained) and the connecting pit on Weyba Road;
b. photos of the existing stormwater gully pit on James St fronting the subject site.
5. A condition report including photographs of the frontage of the site must be completed and
submitted to council prior to the prestart meeting.
6. A condition report of all the properties neighbouring the subject site must be completed and
submitted to council prior to the prestart meeting.
7. Certificates demonstrating currency of public liability insurance and works insurance covering
the works must be submitted to Council prior to the prestart meeting.
8. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Civil engineering works;
b. Landscape works;
c. Erosion and sediment control works;
d. Other relevant parties.
9. A Construction Management Plan must be submitted to Council prior to the pre-start meeting
and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including:
i. A Traffic Management Control Plan in accordance with Manual of Uniform Traffic
Control Devices (MUTCD) detailing all temporary signage and traffic control
measures prior to construction;
ii. Maintenance of safe pedestrian access across the frontage of the site both during
daily construction and after daily construction has ceased;
iii. Proposed fencing to the site during the construction phase of the development;
iv. Adequate parking arrangements for construction workers;
v. No queuing of trucks is permitted on residential streets, especially prior to
7.00am. Further parked trucks must have engines turned off;
b. Maintenance and protection of water quality and existing drainage lines through the
construction site through the implementation of appropriate erosion and sediment
control measures;
c. Establishment of a communication protocol with the general public, adjoining owners,
emergency services and local businesses to advise of agreed construction times,
impacts on traffic and services and other relevant issues;
Page 10 of 20
Document Set ID: 22627357
Version: 3, Version Date: 19/10/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Minor Change - MCU21 0027 02 & OPW21 0047 02 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 222 KB (small file)
- File type
No other editions are linked here.