Decision Notice - Minor Change - MCU21 0027 02 & OPW21 0047 02 [As Published] · MCU21/0027.02

of 20

Text shows just the words. Original shows the document exactly as it was published.

                      b.      dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
                              Parking Facilities.
               24.    All car parking areas and access driveways must be maintained exclusively for vehicle
                      parking and manoeuvring and kept in a tidy and safe condition at all times.
                      Pedestrian and Bicycle Facilities
               25.    Pedestrian and bicycle facilities must be provided for the development. The works must be
                      undertaken in accordance with the conditions of this Decision Notice and must include in
                      particular:
                      a.      A 1.8 metre wide concrete footpath within the road verge for the entire length of the
                              site’s frontage to James Street.
                      Stormwater Drainage
               26.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with the conditions of this Decision
                      Notice and must include in particular:
                      a.      the works shown on the Approved Plans;
                      Services
               27.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.
               28.    Certification must be submitted to Council from all relevant service providers (Energex, NBN
                      and Unitywater) which certifies that the development has met the requirements of this
                      Decision Notice and all applicable legislation at the time of construction.
                      Easements
               29.    A 4 metre wide easement for Stormwater purposes must be registered against the title of the
                      property in favour of Noosa Council over the proposed easement identified on the Approved
                      Plans.
               30.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               31.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               32.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Earthworks and Retaining Walls
               33.    All fill and associated batters must be contained entirely within the subject site unless written
                      permission from the respective landowner(s) is provided to Council. All earthworks must be
                      undertaken in accordance with the provisions of Australian Standard AS3798: Guidelines on
                      Earthworks for Commercial and Residential Developments and the conditions of this
                      Decision Notice.
               34.    Where the development involves excavation or filling over, or adjacent to, drainage, water
                      supply or sewerage infrastructure, all access chamber surface levels must be adjusted to
                      provide a freeboard of 100mm above the finished ground surface level.
               35.    All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
                      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.


                                                                                                        Page 5 of 20
Document Set ID: 22627357
Version: 3, Version Date: 19/10/2023

Used in these records

About this file

File size
222 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Minor Change - MCU21 0027 02 & OPW21 0047 02 [As Published].pdf · 222 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.