RFI - Att 1 - Slope Stablility Assessement
Text Figure 3: Earthworks sections, courtesy Bax
1.2 Method and Scope of Investigation
The aim of this assessment is to address Items 1 & 2 of an NC information request dated 16 February
2026, which states:
Provide a site-specific geotechnical assessment prepared by a registered professional engineer (RPEQ)
demonstrating compliance with the PO3, PO12(c) of the Earthworks Code and PO1 of the Landslide
Hazard Overlay Code. The assessment must certify that:
a) the stability of the site, including associated buildings and infrastructure, will be maintained and
operational for the life of the development;
b) the site is not subject to the risk of landslide activity originating from other land, including land
above the site; and
c) development of the site will not increase the risk of landslide activity on other land.
Alternatively, provide a statement by a suitably qualified person (RPEQ) confirming that the proposed
works do not create a risk of landslide in the long term.
As part of our slope stability assessment, a desk-top study was carried out comprising a review of
published geological maps, NC overlays, a Level 1 certification report for the Dam 01 filling by Wagner
(Ref. J25/03, Rev 1, dated 14 November 2025), and the results of previous borehole drilling at the site by
Tectonic (Ref. 25029-001-Rev0, dated 5 March 2025). Tectonic previously drilled two boreholes in the
18 March 2026
25029-002-Rev0 3 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.