Minor Change Request report tewantin netball
When Conditions must be Complied With
13. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
the use commencing, and then compliance maintained at all times while the use continues.
Nature and Extent of Approved Use
14. Noise generating actives must be limited to between 7am and 9.30pm.
15. The development must be undertaken in a manner that causes no unlawful environmental
nuisance under the Environmental Protection Act 1994 by the creation of excessive noise,
lighting, waste, atmospheric pollutants (including dust or odours) or other releases to the
environment.
Building Height
16. The maximum height of the development must be in accordance with the approved plans.
Approved plans
17. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan Rev. Plan/Document Name Date
No.
DD.03 G Site Plan, prepared by Black Wood Architecture & 08/04//2022
Design
DD.04 G Stage 1 Ground Floor Plan, prepared by Black 08/04/2022
Wood Architecture & Design
DD.05 G Stage 1 Roof Plan, prepared by Black Wood 08/04/2022
Architecture & Design
DD.06 G Stage 1 - Elevations, prepared by Black Wood 08/04/2022
Architecture & Design
DD.07 G Stage 1 - Elevations, prepared by Black Wood 08/04/2022
Architecture & Design
DD.08 G Stage 1 Sections, prepared by Black Wood 08/04/2022
Architecture & Design
DD.10 G Stage 2 Ground Floor Plan, prepared by Black 08/04/2022
Wood Architecture & Design
DD.11 G Stage 2 Roof Plan, prepared by Black Wood 08/04/2022
Architecture & Design
DD.12 G Stage 2 - Elevations, prepared by Black Wood 08/04/2022
Architecture & Design
DD.13 G Stage 2 - Elevations, prepared by Black Wood 08/04/2022
Architecture & Design
DD.14 G Stage 2 Sections, prepared by Black Wood 08/04/2022
Architecture & Design
DD.15 G Stage 3 Ground Floor Plan, prepared by Black 08/04/2022
Wood Architecture & Design
DD.16 G Stage 3 Roof Plan, prepared by Black Wood 08/04/2022
Architecture & Design
DD.17 G Stage 3 - Elevations, prepared by Black Wood 08/04/2022
Architecture & Design
DD.18 G Stage 3 - Elevations, prepared by Black Wood 08/04/2022
Architecture & Design