Skip to the record
Search everything, all in one place.

Original source · versioned page text

Code Compliance Statement

of 42

Page text shows just the words. Original shows the document exactly as it was published.

 Performance outcomes                               Acceptable outcomes                                     Response
                                                     where it is not practical to provide a noise barrier
                                                     or earth mound.
 Material change of use (accommodation activity)
 Ground floor level requirements adjacent to a state-controlled road or type 1 multi-modal corridor
 PO39 Development minimises noise intrusion from AO39.1 Development provides a noise barrier or
 a state-controlled road in private open space.   earth mound which is designed, sited and
                                                  constructed:
                                                  1. to achieve the maximum free field acoustic
                                                      levels in reference table 2 (item
                                                      2.2) for private open space at the ground
                                                      floor level;
                                                  2. in accordance with:
                                                       a. Chapter 7 integrated noise barrier design
                                                             of the Transport Noise Management
                                                             Code of Practice: Volume 1 (Road Traffic
                                                             Noise), Department of Transport and      PO39 – PO41 Not Applicable
                                                             Main Roads, 2013;
                                                       b. Technical Specification-MRTS15 Noise        A Material Change of Use has not been proposed.
                                                             Fences, Transport and Main Roads,
                                                             2019;
                                                       c. Technical Specification-MRTS04 General
                                                             Earthworks, Transport and Main Roads,
                                                             2020.

                                                     OR

                                                     AO39.2 Development achieves the maximum free
                                                     field acoustic level in reference table 2 (item
                                                     2.2) for private open space by alternative noise
                                                     attenuation measures where it is not practical to
                                                     provide a noise barrier or earth mound.




State Development Assessment Provisions v3.5

State code 1: Development in a state-controlled road environment                                                                              Page 11 of 18
Log in to download the original file

Code Compliance Statement.pdf · 1.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.