Original source · versioned page text
Code Compliance Statement
Noosa Plan 2020: Amendment 2
Part 9 Development codes \ 9.5 Other Development Codes \ 9.5.1 Reconfiguring a Lot
Code
(l) protects and enhances ecologically important
areas and provides for the clustering of lots into
cleared areas.
Infrastructure No acceptable outcome provided Complies with PO10
PO10 The Development Application provides for the efficient
Development accommodates and provides for the and timely delivery of infrastructure which is required
efficient and timely delivery of infrastructure
for the sites intended use. Refer to the attached Civil
appropriate to the site’s setting and intended use.
Servicing Statement for further information.
PO11 No acceptable outcome provided PO11 Not Applicable
Roadway and pathway layout are predominantly A roadway and pathway layout is not required for the
rectilinear with a high degree of permeability. proposed Development Application.
Editor’s Note— Further detail on traffic and the road
network is addressed in Part 9.4.8 Transport Code
Table 9.5.1.3 Criteria for assessable development (part)
Performance Outcomes Acceptable Outcomes Comments
Growth management
Infrastructure and services
PO12 AO12.1 Complies with AO12.1
New lots are located, sized and configured so as to All lots are connected to power supply and All lots are capable of being connected to power supply
ensure each lot is capable of being serviced by telecommunications services and where located within and telecommunications services.
appropriate levels of infrastructure including: the Urban boundaries, power supply and
(a) power supply; communications infrastructure are provided
(b) telecommunications; and underground. Complies with AO12.2
(c) where within Local Plan Areas AO12.2 The site has an existing Unity water connection which
(d) reticulated water supply; If located in a water service area each new lot can be will be maintained. Refer to the attached Civil Servicing
(e) reticulated sewerage; and connected to Unitywater’s water supply network. Statement for further information.
(f) stormwater drainage. AO12.3
AO12.3 Not Applicable
Print Date: 09/12/2025 Page 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original