Code Compliance Statement
Noosa Plan 2020: Amendment 2
Part 9 Development codes \ 9.5 Other Development Codes \ 9.5.1 Reconfiguring a Lot
Code
Table 9.5.1.3 Criteria for assessable development (part)
Performance Outcomes Acceptable Outcomes Comments
Growth management
Stormwater Management
PO24 No acceptable outcome provided Complies with AO24
Development provides for the effective drainage of lots The development provides for effective drainage of lots
and roads in a manner that:- which:
(a) maintains the natural flow regime;
▪ Maintains the natural flow regime;
(b) effectively manages stormwater quality and
quantity; and ▪ Effectively manages stormwater quality and
(c) ensures no adverse impacts on receiving waters quantity; and
and surrounding land. ▪ Ensures no adverse impacts on receiving waters
Editor’s Note— Requirements for the design and
construction of stormwater management infrastructure are
and surrounding land.
addressed in Part 9.4.9 Water Quality and Drainage code Roof water from future dwellings will be discharged
onto the natural ground and allowed to sheet flow to
the existing gully.
Table 9.5.1.3 Criteria for assessable development (part)
Performance Outcomes Acceptable Outcomes Comments
Growth management
Conflicting land uses
PO25 No acceptable outcome provided Complies with AO25
New lots for residential development do not adjoin land The new residential lots do not adjoin the Medium
located in the Medium impact industry zone or the Low Impact Industry Zone or Low Impact Industry Zone.
impact industry zone.