Skip to the record
Every meeting, every word.

Original source · versioned page text

Code Compliance Statement

of 42

Page text shows just the words. Original shows the document exactly as it was published.

Noosa Plan 2020: Amendment 2
Part 9 Development codes \ 9.4 Works Codes \ 9.4.3 Existing Services Code




9.4.3                       Existing Services Code

9.4.3.1                     Application

Table 9.4.3.3 Criteria for assessment (part)

Performance outcomes                                     Acceptable Outcomes                                   Comments

Assessable development

PO1                                                      No acceptable outcome provided                        PO1 Not Applicable
Development near a stormwater drain, overland flow                                                             Development is not occurring near a stormwater drain
path or associated structure does not—                                                                         and will not interfere with an overland flow path.
(a) adversely affect the function of the service;
(b) place an additional load on the service; and
(c) unduly increase future maintenance costs.
                                                                                                               AO2.1 – AO2.3 Not Applicable
PO2                                                      AO2.1
Maintenance access is provided to all stormwater         For trunk infrastructure, a registered easement in    There are no stormwater drains or mapped overland
drains, overland flow paths and associated structures.   favour of Council is created over all underground     flow paths. Th e site naturally drains to the north east
                                                         infrastructure located in private property.           corner where there is an existing dam and mapped
                                                         AO2.2                                                 waterway under the Flood overlay, which is retained
                                                         The width of the easement required is in accordance
                                                         with Council’s Planning Scheme Policy PSP6            and not impacted.
                                                         Engineering Design Standards — Roads, drainage and
                                                         earthworks.
                                                         AO2.3
                                                         The easement is centred over the centreline of the
                                                         infrastructure.




Print Date: 09/12/2025                                                                                                                                             Page 1
Log in to download the original file

Code Compliance Statement.pdf · 1.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.