Author	Coordinator Engineering, Mark Lewis
Development Assessment

APPLICATION DETAILS
Application No.	MCU22/0007 & OPW22/0024
Applicant	Trevor Charles St Baker, Judith Kay St Baker
Proposal	Material Change of Use - Landing – Residential and Operational Works – Prescribed Tidal Works – Pontoon System
Properly Made Date	21 January 2022
Information Request Date	4 February 2022
Information Response Date	10 March 2022
Decision Due Date	16 May 2022
Report Completed Date	11 May 2022
Report Reviewed By	Diogo Carrico

PROPERTY DETAILS
Property Address	7 Witta Cir Noosa Heads Qld 4567
RP Description	Lot 92 N 21846
Land Area	612.0000 m²
Existing Use of Land	Residential

STATUTORY DETAILS
SEQRP Designation	Urban Footprint
Zone	Low Density Residential
Precinct	Not Applicable
Local Plan Area	Noosa Heads
Overlays	Acid Sulfate Soils, Flooding
Assessment Type	Code
PROPOSAL
The application seeks approval for a Material Change of Use - Landing – Residential and
Operational Works – Prescribed Tidal Works – Pontoon System.

The locality and proposal plan are included below.

Figure 1 – Locality

Figure 2 – Site Plan

Figure 3 – Elevations
site details
Background
The subject works are to replace an existing pontoon system.
assessment
Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development:
State Planning Policy;
South East Queensland Regional Plan;
Planning Regulation 2017; and
Noosa Plan 2020.
Noosa Plan 2020
The following codes from the Noosa Plan 2020 are applicable to this development:
Low Density Residential Zone Code;
Noosa Heads Local Plan Code;
Waterways Works Codes;
The application has been found to generally comply with all applicable statutory instruments.
cONSULTATION
Referral Agencies
The applicant was referred to the following Referral Agencies:
Department of Infrastructure, Local Government and Planning (SARA)
Internal Council Referrals
The application was forwarded to the following internal Council officers for review and/or comment:
Planning
conclusion & reasons for decision
The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval.
The report is provided in accordance with Section 63(5) of the Planning Act 2016.
RECOMMENDATION
With regard to Application No MCU22/0007 & OPW22/0024 for a Material Change of Use - Landing - Residential and Operational Works – Prescribed Tidal Works – Pontoon System situated at 7 Witta Cir Noosa Heads Qld 4567 and described as Lot 92 N 21846, it is recommended the application be approved in accordance with the following details for the Decision Notice:
application details
Application No:	MCU22/0007 & OPW22/0024
Street address:	7 Witta Cir Noosa Heads Qld 4567
Real property description:	Lot 92 N 21846
Planning Scheme:	Noosa Plan 2020 (25 September 2020)
Decision details
Council decided to issue the following type of approval:
Development Permit for Material Change of Use - Landing – Residential and Development Permit for Operational Works – Prescribed Tidal Works – Pontoon System.
CURRENCY PERIOD of approval
The currency period for this development approval is stated in the conditions below.
assessment manager conditions
Approved Plans
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
JSP-SJ-35590	C	Site Plan, Layout Plan & Water Allocation prepared by Edge Consulting Engineers	10 February 2022
JSP-SJ-35591	B	Elevation prepared by Edge Consulting Engineers	25 November 2021
JSP-GW-006	M	Standard Catwalk Construction prepared by Edge Consulting Engineers	14 January 2021
JSP-SD-045	E	Concrete Insitu Pile Construction 315 & 400 Diameter Reinforced prepared by Edge Consulting Engineers	9 September 2020
JSP-SD-040	E	Headstock & Catwalk Connection prepared by Cardno	6 October 2010
JSP-SD-102-1	A	Pile Bracket Constriction to Suit 315 Piles & 6 Roller Bracket prepared by Edge Consulting Engineers	17 September 2020
JSP-SD-206/8	A	3m wide Aluminium Deck Pontoon 5m to 12m length prepared by Edge Consulting Engineers	11 August 2021
Currency Period
The Currency Period for this development approval lapses if all conditions have not been complied with, and the plan of survey lodged with Council for endorsement by 11 May 2024, unless an application to extend the currency period is approved by Council.
General Conditions
The maximum number of vessels that may be berthed, moored, attached or stored on the structure(s) must not exceed 2.
The use of the jetty/pontoon must not cause any adverse effects on the amenity of the surrounding area including changes to light, views, air quality and noise.
Vessels berthed/moored at the pontoon must be located a minimum of 1.0m from the prolongation of the property boundary of 9 Witta Cr (Lot 93 N21846) and the property boundary of 5 Witta Cr, (Lot 1 N12845).
Vessels and boatlifting devices must be connected directly to the pontoon, and not located side by side or in tandem with another vessel.
All structures must be designed and constructed such that they are free standing within the waterway and are not connected to or behind the revetment wall
All structures must have no detrimental effects on stormwater drains and/or easements.
A rigid handrail must be fitted on at least one side of the walkway.
No posts or vertical supports of the proposed jetty section are to extend vertically from the structure unless they provide necessary support for the handrail.
No boatlifting devices are to be attached or moored at the structure for the purpose of elevating a vessel above the water without Council approval.
There must be no electrical reticulation system carrying electricity in excess of 24 volts beyond the revetment wall unless all switches and power outlets are positioned above the 1%AEP flood level.
Lighting associated with the use must be designed, installed, operated, and maintained in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
The pontoon is to be used for private purposes only with no commercial operations to be undertaken.
Boat repair activities are not permitted on site.
Wastewater and sullage must only be disposed of at approved pump out facilities.
The mooring facility must not be utilised for live-aboard purposes.
Any construction and post construction activity is not to impact on the condition of the waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA (1994) and the Environmental Protection (Water) Policy 2009.
Certification by a Registered Professional Engineer of Queensland that states that the jetty, gangway and pontoon are constructed in accordance with best practice methods and are structurally sound must be submitted to Council. This certification must be submitted to Council within three (3) months of the completion of the works. A final inspection and approval of the structure by Council’s Inspector is also required. Please contact Council’s Development Assessment Branch on 5329 6500 to arrange the inspection.
This approval lapses where the construction of the jetty has not commenced within two (2) years of the date of issue of the approval, unless application is made and approved by Council for an extension.
After completion, the proposed works must be maintained in a sound state of repair in accordance with the approved plans

referral agencies
The referral agencies applicable to this application are:
Referral Status	Referral Agency and Address	Referral Trigger	Response

Concurrence	SARA at DILGP SARA at DILGP Via MyDAS2 at https://prod2.dev-assess.qld.gov.au/suite/ (for assistance, contact DILGP at 5352 9701 or email:[email protected]	Planning Regulation 2017 Schedule 10, Part 17 – Tidal Works or Works in a Coastal Management District	The agency provided its response on 21 March 2022 (Reference No. 2202-27419 SRA). A copy of the response is attached

Advisory notes
The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions:
General Advisory Notes
Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works.  A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ.  The RPEQ bears full responsibility for all aspects of the engineering design.  Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent.
The approval or conditions do not absolve the owner of the land from complying with all the conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant statues and/or statutory regulations in the execution and/or performance of said works.
Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time.
Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act.
property notes
Not applicable.
VARIATION approval details
Not applicable.
further development permits required
Not applicable.
submissions
Not applicable.
RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given.
OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices.

[word/footer1.xml]
Page 7 of 8

[word/header1.xml]
3

[word/header2.xml]
DEVELOPMENT ASSESSMENT DELEGATED REPORT

[Attachment: image2.jpeg (image text)]
 

   
   

pasts
onToon

(—

EATON compo _
yo

=
E

    

 

ig
ie 000- 5000: 42117-
; f t

Lor 92

cP N218.46 Lor 63

 

 

 

+WITTA CIRCLE

 

it

  

WP & 2 NOSE

+WITTA CIRCLE>
SITE PLAN _&

 

 

 

 

L oq
WATER ALLOCATION ‘acs | 21 #58 Agim Re STU
‘SCALE 1:500 \ | | fis
r 4
100 EN susnn sry
Pad os oe Parte
ag i HANDRAILS WELDED TO
| Ep ee rernssrmues

 

 

 

 

sn Po

 

r
{
|
|
|

 

|
|
!
‘NOTES: |
eng sects shown poe pion | TED Heh
|
!
1
!

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DESIGN LoADINGS: BERTHING:
‘UVB LOAD: eserum wet vesel length — 6.0m LAYOUT PLAN LOT 92
Forge Cawok  ~ tape ae ‘SCALE 1:100 CP N218.46
Foorbatom = 20
THE MARINA SPECIALIST _ [Survey oma] P10 a x st ener SITE PUAN, LAYOUT PLAN
fran Sac OTOESST19 18 en Panstn os uy IS] Lor 92 (7) witTa ciRCLE ‘& WATER ALLOCATION
mI best Asan PE [=|__NoosA HEADS _ al
ee Se a ae TALS ap, HOeLo se ss Se wo mE" PRopOSED PONTOON & CATWALK. [le aeae- ime fare fo

£ Sree eee cue Prvovza | Wa SPECIALIST ar Te SB [usP-Si~36590 ¢

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


[Attachment: image3.jpeg (image text)]
 

 

 

 

   

mu “\

 

 

 

 

sao
a
b

e
1 Lsiamter srry 2200 te
q

ae

PANO HINGE CONNECTION

ey,

sores RoW
S04 SIS

 

 

 

 

 

 

    
 

sata
| resosroce

deve

REA

 

cowak AT a
store 8

 

 

2 #315 ate,
‘Re SMU PLES

wa Ser cat

"Mo DENSE SAND

‘8 30 uN Be DUEN

1600 08s

$000 wn EMBEONENT

 

=

 

 

 

 

 

  

toe oF Es

   

 

 

 

HAT RL ate
“2 Feet] ME RL O36

Pontoon fio RL om

Seo et {iba
Was RU B25m

AAT RL Om

 

 

TS HOSS SBIECT TO COPTRT HOC BE REPRODUCED APT FO OR PSST TO HTS PRR WITT THE WATT PERSSON OFTHE TEM" SPOHST

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

—»

50 14 sis

A sou Tt STNG #515 RC NSTI PLES

ELEVATION DETAILS
SCALE 1:50
6
eed lf" sur 50 x 3 SHS
v0 ste FRAUE FROM 9150 oe
5 rom PL Wi MARINE
Lea {" pez RS GRADE CARPET
Eat - mh
= wot \_ssp-206
STARTER JETTY WITH STEPS HINGE TUBES
(CALE 1-21
pa = > iin me maine Beem] THE MARINA SPECIALIST [SURVEY DATA] PTC a Jk St BAKER P ELEVATION
20 Oo anon [RANG AS «AM O19 Ben Prac cn fomuul —_—_{S] LOT 92 (7) WITTA CRCLE
= = [ ree retty re F]__ Noosa HEADS: if so hal
- <—— <a Wn) 2 es SES a oR]! PROPOSED PONTOON & CATWALK i Le) peg Ol
nit | co pen

EE ene Tem AL | suse [rsorzeae | = SPECIALIST vos Je fise=sy-35501 3

 

 

Used in these records

About this file

File size
428 KB (small file)
File type
DOCX

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning MCU22 0007.docx · 428 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.