Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Operational Works Letter - 101250

of 7

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                             17 July 2024
The Chief Executive Officer
Noosa Shire Council
PO Box 141
Tewantin QLD 4565

Attention: Development Assessment

Dear Sir/Madam,

    APPLICATION FOR A DEVELOPMENT PERMIT FOR OPERATIONAL WORK
 ASSOCIATED WITH MCU21/0190 (LANDSCAPING, ROADWORKS, CARPARKING,
                   EARTHWORKS AND STORMWATER)

Property Description:          Lot 1 on SP345689
Property Address:              65 Elanda Street, Sunshine Beach QLD 4567
Development Type:              Application for a Development Permit for Operational Work
                               Associated with MCU21/0190 (Access, Frontage Works,
                               Stormwater, Drainage Work, Earthworks and Landscaping)
Local Authority:               Noosa Shire Council
Planning Scheme:               Noosa Plan 2020
Council Reference:             MCU21/0190
Our Reference:                 101250
Registered Landowner:          Elanda Street Development Pty Ltd A.C.N. 671 470 661

Murray & Associates (QLD) Pty Ltd have been commissioned to prepare this application on
behalf of Elanda Street Development Pty Ltd in support of an Application for a Development
Permit for Operational Work Associated with MCU21/0190 (Access, Frontage Works,
Stormwater, Drainage Work, Earthworks and Landscaping), involving land legally described
as Lot 1 on SP345689, situated at 65 Elanda Street, Sunshine Beach QLD 4567.

Expert reports and plans have been prepared for this application in accordance with the
following conditions of the Approved Decision Notice for MCU21/0190:

   ➢   Condition 33 – Stormwater: Please see Appendix B – Engineering Memo &
       Appendix C – Operational Works Engineering Plans prepared by RECOR Pty Ltd
       for details.

   ➢   Condition 34 – Landscaping Works: Please see Appendix D – Landscape Plans
       prepared by Open Space Architecture for details.

   ➢   Condition 37 – Engineering (External Works): Please see Appendix B –
       Engineering Memo & Appendix C – Operational Works Engineering Plans
       prepared by RECOR Pty Ltd for details.

   ➢   Condition 38 – Engineering (Site Access and Driveways): Please see Appendix C –
       Operational Works Engineering Plans prepared by RECOR Pty Ltd for details.

   ➢   Condition 39 – Engineering (Car Parking): Please see Appendix C – Operational
       Works Engineering Plans prepared by RECOR Pty Ltd for details.

   ➢   Condition 41 – Engineering (Pedestrian and Bicycle Facilities): Please see Appendix
       C – Operational Works Engineering Plans prepared by RECOR Pty Ltd for details.
Log in to download the original file

Operational Works Letter - 101250.pdf · 239 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 6 pages

Page 2

    ➢   Condition 47 – Engineering (Earthworks): Please see Appendix C – Operational
        Works Engineering Plans prepared by RECOR Pty Ltd for details.

    ➢   Advisory Note (Preparation of a Preliminary Construction Management Plan): Please
        see Appendix E – Construction Management Plan prepared by BBN
        Constructions for details.

Please note that Council’s Assessment Fee, being $4,958.00 will be paid following receipt
of Council’s application fee invoice.

We look forward to receiving Council’s favourable decision notice for this application in due
course.

Yours faithfully,




Blake Bell BRTP, M.P.I.A., CPP, MDIA
Director/Principal Town Planner
MURRAY & ASSOCIATES (QLD) PTY LTD

Page 3

MURRAY&
ASSOCIATES

SURVEYORS & TOWN PLANNERS

 

 

Appendix A

 

Current Titles Search

Page 4

MURRAY&
ASSOCIATES

SURVEYORS & TOWN PLANNERS

 

 

Appendix B

 

Engineering Memo

Prepared by RECOR Pty Ltd

Page 5

MURRAY&
ASSOCIATES

SURVEYORS & TOWN PLANNERS

 

 

Appendix C

 

Operational Works Engineering Plans

Prepared by RECOR Pty Ltd

Page 6

MURRAY&
ASSOCIATES

SURVEYORS & TOWN PLANNERS

 

 

Appendix D

 

Landscape Plans

Prepared by Open Space Architecture

Page 7

MURRAY&
ASSOCIATES

SURVEYORS & TOWN PLANNERS

 

 

Appendix E

 

Construction Management Plan

Prepared by BBN Constructions

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.